Jun25
1
STAFF REPORT
PERMIT
TYPE
PUBLIC
HEARING
DATE
PROPERTY ADDRESS/ ZONE/LOT SIZE
CLICK FOR PERMIT FILE 31D-217
SPECIAL
PERMIT/SITE
PLAN MAJOR
JUNE 25, 2020
7:00 PM 34 DEWEY CT /URBAN RESIDENTIAL C/ 1.3 ACRES
OWNER EXISTING
USE
BENJAMIN
LEWIS
SINGLE FAMILY
HOME
Summary of Request:
The applicant is seeking to build 15 apartments in a single building, preserving the existing house as
common use space for the tenants in the apartments.
8 additional parking spaces beyond what the zoning requires.
Path connection from Dewey Court to the publicly-used path on Smith property to Fruit Street-
comparable to requirements for “Dead-End” streets in City’s Subdivision Regulations
Creation of 16’ wide Alley-type or Residential Shared street comparable to that which is allowed
in the City’s Subdivision Regulations. This is a hybrid of the two wherein no curbing is required
& the width and curvatures of the layout create slow enough speeds to allow sha ring of modes
between pedestrians, vehicles and bicycles.
SITE
2
Zoning Compliance :
The site is on the edge of downtown and is surrounded by parcels that have varied densities, which
reflect the general character of the Urban Residential C district.
A special permit is a discretionary permit. The Board has the jurisdiction to evaluate the unique
character of the site as it relates to the proposed use of the property to determine if the criteria within
the zoning is met.
A special permit for more than 6 units to be const ructed in the URC-p5 districts is required. See the
application for how the project meets these elements.
o Note that the Planning Board may waive, elements 2, 3, 4 in the URC table if it can be
shown that a different design meets a pedestrian-scale design that encourages
public/private transition and interface (e.g., similar elements facing internal courtyards
or private streets)
Special Permit criteria is in 350.10.2.
Conservation Commission has issued a permit for reconstruction of the sewer line and other site work.
Department of Public Works has issued a stormwater permit for this project.
The Planning Board’s findings to approve special permits must find the criteria in the Table of use for
URC and 10.2 have been met (or could be met with conditions)
1) The requested use protects adjoining premises aga inst seriously detrimental uses. If applicable,
this relates to surface water drainage, sound and sight buffers and preservation of views, light, and
air; and
NOTE: this does not mean that the Board guarantees that existing resident’s view of their neighbor's
yard will never change. This can mean the use of setbacks, buffers, orientation of structures and use
of other landscaping. This provision is to ensure that development of a property does not fully
envelope another by a new building.
(2) The requested use will promote the convenience and safety of vehicular and pedestrian
movement within the site and on adjacent streets, minimize traffic impacts on the streets and roads in
the area. If applicable, this shall include considering the location of driveway openings in relation to
traffic and adjacent streets, access by emergency vehicles, the arrangement of parking and loading
spaces, and provisions for persons with disabilities; This can be met by mitigation offered, a show
that the mitigation will not drop the Level Of Service on area roads below what is already existing
and by ensuring safe multi -modal access to and from the site.
(3) The requested use will promote a harmonious relationship of structures and open spaces to the
natural landscape, existing buildings and other community assets in the area; By tucking the building
into the rear portion of the site on a smaller footprint per unit basis t han other structures in the
neighborhood this development allows new units while preserving a significant portion of the 1.3
acre site. Additionally the existing house will be preserved which enables less overall site
disturbance.
(4) The requested use will not overload, and will mitigate adverse impacts on, the City's resources
including the effect on the City's water supply and distribution system, sanitary and storm sewage
3
collection and treatment systems, fire protection, streets and schools; The applicant is replacing an
existing deteriorated sewer line to support this project.
(5) The requested use meets any special regulations set forth in this chapter; The specific criteria in
the URC table are applicable here as well as the provisions in Site Plan and 12.3 for Significant
Trees.
Height
Max height allowance is 50’(4-5 stories). Project building= ~36’ (3 stories).
Surrounding URC heights range from 1.5’ stories to 3 stories and in some cases greater.
Massing
Articulated with different roof planes, building angles, step backs and 3 separate
massings tied together.
Density-
Surrounding Neighborhood Density: 6.5 - 30 dwelling units per acre, mostly 20 and
below.
Subject Parcel Density: 11 dwelling units per acre.
Connectivity
Connectivity through the site to a path at the rear used by other neighborhood residences
is proposed, providing required pedestrian access on Dewey Court and to the rear to
downtown.
Park Space
Maintenance of the exi sting view shed of the turnaround creates a backdrop for the
parklet space. See plans.
Streetscape
Because this lot does not have the typical frontage along the street and the existing driveway
bisects the site in a way that allows structures to flank each side of this dividing line created by
the driveway in a way that continues the rhythm of street. Further, the applicant has addressed
this criteria by dividing the parking into two areas, screened from the street using the existing
landscaping in the driveway.
(6) The requested use bears a positive relationship to the public convenience or welfare. The use will
not unduly impair the integrity of character of the district or adjoining zones, nor be detrimental to the
health, morals, or general welfare. The use shall be in harmony with the general purpose and intent of
the ordinance; The specific nature of the ordinance was established to encourage this type of higher
density residential development surrounding downtown. The provision of new rental housing
opportunities.
(7) If applicable, the requested use will promote City planning objectives to the extent possible and
will not adversely effect those objectives, as defined in City master or study plans adopted under
MGL c. 41, § 81C and 81D.
ISSUES:
Trees 3.3, 3.4, 3.5 are shown along the edge of the property between the parking lot and the new
building. The Grading plan shows signifi cant work under the tree canopy and the arborist noted that
4
these may need to be removed. However the applicant has stated that they would like to save these
trees if possible.
The issue is that in previous projects when grading c omes this close to trees, despite tree protection,
that the trees fail within 1-2 years. This permit should account for this now. Either calculate these
inches into the tree replacement, while also attempting to save the trees-- but do not pay into the fund
for these trees until a 2 year window has passed or take the trees down now and replant trees in their
place.
350-12.3 Criteria governs all trees on the property over 20” DBH and does not differentiate among
species or native vs. invasive types. The applicant has calculated 112 inches removed that need to be
replaced. Additional trees 3.3-3.5=83 additional inches. The ordinance does not grant discretion for
the Board to impose more restrictions on tree removal based on public comment regar ding an
individual tree for its suggested unique qualities.
This provision for tree replacement is the same in the urban core as well as in the more suburban
districts in the city. See attached map showing that this project is within a neighborhood that has the
least amount of impervious surface per capita of other residential neighborhoods in the City.
Pedestrian Connectivity. Due to the location of the mature Maple Tree within the Dewey Court
sidewalk, it is not feasible to extend the sidewalk from its current terminus into the site without
removing this shade tree. As an alternative means of extending safe pedestrian access to the site from
the public sidewalk, the applicant has selected a combination of 4’ wide dura-therm treatment in the
street leading to a 16’ wide shared (ped/vehicle) driveway with brick pavers on the property to
differentiate the pedestrian path from the traveled way.
Traffic Mit igation:
The applicant is offering to make a one -time payment in-lieu of traffic mitigation for the 14 new units
proposed. The total amount would be $14,000 based on the 14 new peak hour trips to be generated
by this use.
Though there are existing traffic issues on South Street, the zoning does not require any applicant to
address existing conditions of the transportation network surrounding a project. The Zoning does
require that applicants address each new incremental addition of traffic generated by the proposed
project.
New projects are not barred from approval even if existing traffic on the ne twork does not function at
a level of service adequate for the volume of traffic accommodated.
Lighting
Carport lighting exceeds 5 foot candles. The Board will need to vote to approve this increase under
the covered parking areas.
5
Consistency wi th Sustainable Northampton
Social Equity- The foundation of the plan is based on providing equity throughout decision
making process. Adding a range of rental housing even if market-rate, will meet needs of a
variety of residents of the City. Further, the development of multi family housing meets the
goal of encouraging investment in properties that will help retain a population of divers e
demographics and of diverse income levels.
Encourage preservation of significant buildings . Though not an historic structure, this house
has is older than 1939 and would trigger demo revi ew. The applicant is choosing to
incorporate this house into the project which allows the site to remain in tact to the greatest
extent possible with much less disturbance to the neighborhood while allowing it to be
creatively used as spillover space for the tenants in the new building. This allows smaller
units to be built on the site, meeting a housing goal of encouraging small unit development to
meet needs of diverse income levels.
Encourage Housing Alternatives- new energy efficient housing stock, new rental inventory,
mid market rentals are identified in the plan as well as the recently commissioned report on
Northampton’s Barriers To Fair Housing.
The city has lost rental housing in and around the edges of downtown as residential structures
are converted to commercial uses. Examples include “transitional residential” buildings on
State Street, Masonic, Center, Gothic Streets.
The transition of those units as well as conversion of other rental units to co ndominiums has
created a gap in housing inventory. Rental residential units are essential to support downtown
businesses and/or attract new business .
Housing to create new opportunities close to downtown and to support Downtown Economic
Development and Commercial Vitality-
A vitally important element to maintaining a vibrant and evolving downtown business mix is
to ensure that there are housing densities that support this within walking distance of
downtown. Street facing storefronts should not be filled with housing since that would detract
from urban vitality and character . However, development of housing units behind and
surrounding Main Street and the blocks beyond provide the support to downtown.
6
Staff Recommendation
This project fulfills a gap in the housing inventory relative to range of smaller rental units and
meets the criteria in the special permit for more than 6 units. The new building is compactly
situated primarily within the existing lawn area or previously disturbed area. There are trees that
will need to be removed for the project, but the applicant has gone to great effort to balance tree
preservation while tucking new structures onto the site. Therefore Staff recommends approval
with conditions:
Approve Approve with Conditions Deny
1. Prior to site work,
a. The applicant shall submit to the Office of Planning and Sustainability a statement
by the arborist indicating that tree protection and recommended tree care in
preparation for site development has been completed .
b. The Stormwater O & M agreement must be recorded in compliance with
Department of Public Works standards.
c. Final revised plans incorporating all conditions herein shall be submitted to the
Office of Planning and Sustainability. Carport details should include piers instead
of poured concrete footings
2. Prior to issuance of a building pe rmit
a. Final plans and details shall be submitted in accordance with conditions herein.
3. Prior to issuance of a final certificate of occupancy:
a. A lighting as-built shall be submitted stamped by a PE indicating that the lighting
levels approved by the Board have been met.
b. Calculation showing that required tree replacement has been met for the 195”
(DEPENDING ON BOARD’S DISCUSSION) removed through either on site
planting or payment into the tree replacement fund or a combination of the two..
c. As offered to address the increase by 14 new peak hour trips generated by this
project, the applicant shall make a one -time payment-in lieu of traffic mitigation
of $14,000 or shall reconstruct the portions of the sidewalk along Dewey Court
that do not meet ADA compliance up to the val ue of this increase in traffic
generation.
4. All lighting must meet the zoning unless the Board conditions herein otherwise.
5. Carport lights shall be turned off or put on motion sensors after 10 PM
RR
RR
RR
RR
RR
RR
RR
RR
RR
RR
RR
RR
RR
RR
RR
RR
RRRR
RR
RR
RR
RR
RR
RR
RR
RR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
URA
URA
URA
URA
URA
URA
URA
URA
URA
URA
URA
URA
URA
URA
URB
URB
URBURB
URB
URB
URB
URB
URB
URB
URB
URB
URCURC
URC
URC
URC
URC
URC
URC
URC
WSP
WSP
WSPWSP
WSP
WSP
WSPWSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP
WSP WSP
WSP
WSP
WSP
WSP
E
Sources: 2010 City Census MassGIS 30cm imagery
sq_m_impervious_per_capita
135
186
312
362 - 376
505