Loading...
Changes Summary and UpdateAs requested in the 1/23/2020 Conservation Commission meeting, and per my 3/6/2020 e-mail, we are providing the following updates regarding the subject project.    The soil tests have been completed, the stormwater basin designs were revised to incorporate underdrain and to avoid existing large trees, and the flood storage compensation area was reshaped based on updated survey information.    Attached please find the soils report.  We are also sending separately a ShareFile link to an updated set of NOI drawings reflecting those changes.     The following table summarizes the changes since the 12/24/2019 NOI submittal:   What Changed Original NOI Submittal Updated 3/20/2020 Comments Soil Test Report for Bioretention Ponds Not included  Included Please see attached I-91 Bioretention Pond Design No underdrain Existing trees not mapped. Underdrain added. Existing trees surveyed, avoided where possible. See updated NOI plans Route 5 Bioretention Pond Design No underdrain   Underdrain added.   See updated NOI plans Flood Storage Compensation Area Designed based on available survey; survey update was in progress.   Design revised based on updated survey.  See updated NOI plans Landscaping Minimal landscaping proposed. Additional landscaping proposed and shown on dedicated landscaping sheet. See updated NOI plans       Impacts & Mitigation Original NOI Submittal Updated 3/20/2020 Comments Wetlands (BVW) Impact (s.f.) 174 Perm.  8,688 Temp.       174 Perm.      8,688 Temp. No Change Wetlands (BVW) Creation (s.f.) 215 215 No Change BLSF (s.f.) 24,695 33,688 Increased due to base mapping updates Flood Storage Impact (c.y.) 1,640 1,874 Increased due to base mapping updates Flood Storage Creation (c.y.) 1,793 1,897 Increased by adding a retaining wall