Loading...
Comp Storage (Phase 2. 01-20-2020) rev. 1.pdfNet Difference Between Pre- Existing and Proposed Flood Storage 122.33 212,599 122.33 262,396 122.33 228,822 64,281 78,642 72,244 7,963 122 176,985 122 214,221 122 209,022 142,725 194,253 190,878 48,153 121 108,465 121 174,284 121 172,733 86,370 139,263 139,667 53,297 120 64,274 120 104,242 120 106,600 57,549 82,959 84,231 26,682 119 50,824 119 61,675 119 61,862 46,988 58,474 58,632 11,645 118 43,151 118 55,272 118 55,402 39,606 53,153 53,314 13,708 117 36,061 117 51,033 117 51,225 32,492 47,369 47,713 15,221 116 28,923 116 43,704 116 44,201 24,552 33,564 39,420 14,868 115 20,181 115 23,423 115 34,638 721,282 494,562 966,827 687,674 929,867 686,097 191,535 Storage Volume (cy) Pre-Existing Flood Storage Previously Approved Flood Storage Elevation (NAVD88)Area (sf)Storage Volume (cf) Elevation (NAVD88)Area (sf)Storage Volume (cf) Proposed Flood Storage Elevation (NAVD88)Area (sf)Storage Volume (cf)