Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
32A-201 (25)
51 PHILLIPS PL-#2 BP-2020-0924 GIS#: COMMONWEALTH OF MASSACHUSETTS Mag:Block: 32A-201 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM 13UI L D I N G PERMIT Permit# BP-2020-0924 Proiect# JS-2020-001573 Est.Cost:$6000.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO.- Const. O.Const.Class: Contractor: License: Use Group: TESLA ENERGY OPERATIONS INC 110253 Lot Size(sa.ft.): 11891.88 Owner: Mark Glenne Zoning: URC(100)/ Applicant: TESLA ENERGY OPERATIONS INC AT: 51 PHILLIPS PL - #2 Applicant Address: Phone: Insurance: 24 ST. MARTIN DRIVE, BLDG 2, UNIT 11 (508 24� Q Workers Compensation MARLBOROUGH MAO 1752 ISSUED ON:2/25/2020 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL SOLAR PANELS TO ROOF OF EXISTING HOME - 12 PANELS POST THIS CARD SO IT IS VISIBLE FROM THE STREET inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of OccupancV Signature: FeeType: Date Paid: Amount: Building 2/25/$020 0:00:00 $75.00 212 Main Street, Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner Department use only �. C �,EI City of Northampton r� / Status of Permit: _ Building Department Curb Cut/griveway Permit 212 Main Street Sew�r/SepjticAvailability '1 Room 100 F E B 1 3 Wat�*Velj Availability Northampton, MA 01060 TwSets�f Structural Plans .� ` .%ti..< phone 413-587-1240 Fax 413:-:587-4-272 PIo�Site Flans of r:,•n;,.. T O • 0':r Specify APPLICATION TO CONSTRUCT,ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office Map_� �yLot 1 Unit 51 Philips Pl.#2 Zone Overlay District St. District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 7 2.1 Owner of Record: Mark Glenny 51 Phillips PI #2, Northampton, MA 01060 Name(Print) Current Mailing Address: (508) 277-6282 Telephone 2.2 Authorized Agent: Tesla Energy Operations Inc. 24 St.Martin Dr. Bldg 2 Unit 11, Marlboro, MA,01752 Name(Print) Current Mailing Address: 11�,�� 774-281-0377 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $2,000 (a) Building Permit Fee 2. Electrical (b) Estimated Total Cost of $4'000 Construction from (6) 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total= 1 +2 +3+4 +5) $6,000 Check Number This Section For Off icial Use Only Building Permit Number. Vf Date Issued: Signature: _ V-as a6 Building Commissioner/Inspector of Buildings Date eoutslay @ tesla.com EMAIL ADDRESS (REQUIRED; EITHER HOMEOWNER OR CONTRACTOR) Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg.Square Footage % i Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces EFillcation) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document # B. Does the site contain a brook, body of water or wetlands? NO © DONT KNOW n YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained © Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO @ IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES V NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing ❑ Or Doors El Accessory Bldg. ❑ Demolition ❑ New Signs[O] Decks [M Siding[o] Other[M] Brief Description of Proposed Work: Install solar electric panels to roof of existing home, to be interconnected with the homes electrical system, 12 panels Alteration of existing bedroom Yes x No Adding new bedroom Yes x No Attached Narrative Renovating unfinished basement Yes x No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date I, Emilie Outslay as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Emilie Outslay Print Name 2/11/20 Signature of Owner/Agent T Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Daniel Kelley 110253 License Number 24 St.Martin Dr. Bldg 2 Unit 11, Marlborough, MA, 01752 12/1/21 Address Expiration Date 774-364-3145 Signature 4 (/ Telephone 9. Registered Home Improvement Contractor: Not Applicable ❑ Tesla Energy Operations Inc. 168572 Company Name Registration Number 24 St.Martin Dr. Bldg 2 Unit 11, Marlborough MA 01752 3/7/21 Address Expiration Date "l Telephone 774-281-0377 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... IN No. ......❑ City of Northampton Massachusetts ��?S DEPARTMENT OF BUILDING INSPECTIONS 'P z 212 Main Street •Municipal Building yJti CD Northampton, MA 01060 AFFIDAVIT Home Improvement Contractor Law Supplement to Permit Application The Office of Consumer Affairs and Business Regulation("OCABR")regulates the registration of contractors and subcontractors performing improvements or renovations on detached one to four family homes.Prior to performing work on such homes,a contractor must be registered as a Home Improvement Contractor("HIC"). M.G.L.Chapter 142A requires that the"reconstruction, alteration, renovation, repair, modernization, conversion, improvement, removal, demolition, or construction of an addition to any pre-existing owner-occupied building containing at least one but not more than four dwelling units....or to structures which are adjacent to such residence or building"be done by regy6stered contractors. Note.If the homeowner has contracted with a corporation or LLC,that entity must be registered Type of Work: Solar Est.Cost: $6.000 Address of Work: 51 Phillips PI#2 Date of Permit Application: 2/11/20 I hereby certify that: Registration is not required for the following reason(s): Work excluded by law(explain): Job under$1,000.00 Owner obtaining own permit(explain): Building not owner-occupied Other(specify): OWNERS OBTAINING THEIR OWN PERMIT OR ENTERING INTO CONTRACTS WITH UNREGISTERED CONTRACTORS OR SUBCONTRACTORS FOR APPLICABLE HOME IMPROVEMENT WORK ARE NOT ELIGIBLE FOR AND DO NOT HAVE ACCESS TO THE ARBITRATION PROGRAM OR GUARANTY FUND UNDER M.G.L.Chapter 142A.SUCH OWNERS ALSO ASSUME THE RESPONSIBILITES FOR ALL WORK PERFORMED UNDER THE BUILDING PERMIT.SEE NEXT PAGE FOR MORE INFORMATION. Signed under the penalties of perjury: I hereby apply for a building permit as the agent of the owner: 2/11/20 Tesla Energy Operations 168572 Date Contractor Name HIC Registration No. OR: Notwithstanding the above notice,I hereby apply for a building permit as the owner of the above property: Date Owner Name and Signature City of Northampton SSS s'�• Massachusetts DEPARTMENT OF BUILDING INSPECTIONS x M 212 Main Street •Municipal Building Northampton, MA 01060 Massachusetts Residential Building Code Section 110.R5.1.2 Homeowner: Person(s)who own a parcel of land on which he/she resides or intends to reside, on which there is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Section 110.R5.1.3.1 Any homeowner performing work for which a building permit is required shall be exempt from the licensing provisions of 780 CMR 110.R5, provided that if a homeowner engages a person(s) for hire to do such work, then such homeowner shall act as supervisor. Such homeowner shall submit to the Building Official, on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s) you hire to perform work for you under this permit. City of Northampton Massachusetts DEPARTMENT OF BUILDING INSPECTIONS x M \ 212 Main Street •Municipal Building y`�ti CD Northampton, MA 01060 Debris Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. The debris from construction work being performed at: 51 Phillips PI#2 (Please print house number and street name) Is to be disposed of at: E.L.Harvey& Sons Dumpster 0 Tesla Marlborough (Please print name and location of facility) Or will be disposed of in a dumpster onsite rented or leased from: (Company Name and Address) 2/11/20 Signature of Permif Applica or Owner Date If, for any reason, the debris will not be disposed of as indicated, the Applicant or Owner shall notify the Building Department as to the location where the debris will be disposed. The Commonwealth of Massachusetts Department of Industrial Accidents d I Congress Street, Suite 100 Boston, MA 02114-2017 " www mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): Tesla Energy Orations Inc. Address: 45500 Fremont Blvd. City/State/Zip: Freemont, CA, 94538 Phone#: 888-765-2489 Are you an emplover?Check the appropriate box: Type Of project(required): I.X❑1 am a employer with 5,000 employees(full and/or part-tune).* 7. ❑New construction 2.❑I am a sole proprietor or partnership and have no employees working for me in 8, ❑Remodeling any capacity [No workers'comp.insurance required.] 9. ❑Demolition 3❑I am a homeowner doing all work myself[No workers'comp.insurance required.] 10 [J Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 1 1.®Electrical repairs or additions proprietors with no employees. 12.E]Plumbing repairs or additions 5.❑I am a general contractor and I have hired the subcontractors listed on the attached sheet. 13.❑Roof repairs These sub-contractors have employees and have workers'comp.insurance 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14. Other solar 152,§1(4),and we have no employees.[No workers'comp insurance required.l *Any applicant that checks box#1 must also fill out the section belo-showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. +Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Zurich American Insurance Co. Policy#or Self-ins.Lic.#WC-1074584-02 Expiration Date: 10/31/20 Job Site Address: 51 Phillips Pl. City/State/Zip: Northampton , MA Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. 1 do hereby certify under the pains and penalties of pet jury that the information provided above is true and correct. Signature: 2G44 __ Datc: 1/1.412020 Phone#: 774-281-0377 _ A_ Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3.City/7'own Clerk 4.Electrical Inspector 5,Plumbing Inspector 6. Other Contact Person: Phone#: _ Commonwealth of Massachusetts Division of Professoonai Licensure Board of Budding Regulations and Standards Construction Supervisor CS-110251 Expires 12 01,2021 DANIEL KELLEY 323 HIGHLAND ST HOLDEN MA 01520 Commissioner --&AAr_W. Office of Consumer Affairs$Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Supplement Card before the expiration date. If found return to: & i&tl33tion Egoration Office of Consumer Affe irs and Business Regulation 168572 D3/07/2021 1000 Washington Street-Suite 710 TESLA ENERGY OPERATIONS,INC. Boston,MA 02118 DANIEL KELLEY �Q 901 PAGE AVENUE U FREMONT,CA 94538 Undersecretaryt li ithout Signa ure Office of Consumer Affairs 8 Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Supplement Card before the expiration date. If found return to: Regi.stratsota EgRiration Office of Consumer Affairs and Business Regulation 168572 03/07/2021 1000 Washington Street-Suite 710 TESLA ENERGY OPERATIONS,INC. Boston,MA 02118 EMILIE OUTSLAY ��AA JL / 901 PAGE AVENUE o FREMONT,CA 94538 Not Valid WI Undersecretaryignatur ATE ,a`oieo® CERTIFICATE OF LIABILITY INSURANCE D 0/30/2019Dnvvvl THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT MARSH RISK& INSURANCE SERVICES NAME: PHONE FAX 345 CALIFORNIA STREET,SUITE 1300 xt): AIC rte: CALIFORNIA LICENSE NO.0437153 EMAIL SAN FRANCISCO,CA 94104 ADDRESS: INSURERS AFFORDING COVERAGE NAIL# CN104275261-STND-GAWUE-19- INSURER A:Zurich American Insurance Company 16535 INSURED INSURER s:N/A NIA Tesla Energy Operations Inc. 45500 Fremont Blvd INSURER C:American Zurich Insurance Company 40142 Fremont,CA 94538 INSURER o:N/A N/A INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: SEA-003635796-04 REVISION NUMBER: 3 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. /NSR DDLSU—SRTYPE OF INSURANCE IVSD WVD POLICY NUMBER PO LICY EFF POLICY EXP LTR DD/YYYY1 (MM/DDfYYYYI LIMITS A X COMMERCIAL GENERAL LIABILITY GLO10745WO2 10/31/2019 10/31/2020 EACH OCCURRENCE $ 2,500,000 CLAIMS-MADEOCCUR Includes Host Liquor Liability DAMAGE TO RENTED xPREMISES Ea occurrence $ 2,500,000 X SIR:$750,000 MED EXP(Arty one Person) $ 5,000 X Tort Contrac Liab,No XCU Excl PERSONAL&ADV INJURY $ A6,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ X POLICY❑JE� LOC PRODUCTS-COMP/OP AGG $X OTHER: 6M r Pro bLoc A $ A AUTOMOBILE LIABILITY BAP 1074586.02 10131/2019 10131/2020 COMBINED SINGLE LIMIT $ Ea accident X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTYDAMAGE $ AUTOS ONLY AUTOS ONLY Per accident UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED I I RETENTION$ $ C WORKERS COMPENSATION WC 1074583-02(AOS) 16731/2020 X STATUTE X ERS AND EMPLOYERS'LIABILITY PER C Y/N WC 1074584-02(MA,WI) 10/3112019 1013112020 1000000 ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ A OFFICERIMEMBEREXCLUDED? N/A CA $50MisXS 10/31/2019 1013112020 (Mandatory In NH) ( E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under $1 OM SIR;$1M EE/EA is XS$10M SIR) 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Evidence of Insurance. CERTIFICATE HOLDER CANCELLATION Tesla Energy Operations,Inc. SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 45500 Fremont Blvd, THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Fremont,CA 94538 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh Risk&Insurance Services Stephanie Guaiumi jzoi� C41_11u__' ©1988-2016 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD ❑� Mr- 1-01 Solar Subscription and Home Improvement Agreement This "Agreement' is between you and the Tesla entity (`Tesla", "we" "us" or "our") identified below. It consists of (1) the below Price Sheet and (2) the attached terms & conditions, and is effective on the date you agree to this Agreement (by electronic acceptance). Price Sheet Your information Mark Glenny 51 Phillips PI Northampton, MA 01060 5082776282 Tesla entity/Provider Tesla, Inc. of 3500 Deer Creek Road, Palo Alto, CA, 94304 888-765-2489 Installer Tesla Energy Operations, Inc. of 901 Page Avenue, Fremont, CA 94538 MA HIC 168572/22812-A Salesperson Name and License Number N/A Energy Products and Contract Price Description of the Project and Description of the Significant Materials to be Used and Equipment to be Installed Solar System 3.78 kw DC solar panels Monthly Subscription Payment $50.00 You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of cancellation form for an explanation of this right. Approximate Installation Start Date 10-90 days from the date of this Agreement Approximate Completion Date 10-90 days from the date of this Agreement Signed by Your signature Tesla, Inc. Mark Glenny �`VNZ, Name: Mark Glenny Name: Date: 2/9/2020 4:45:21 PM +00:00 Date: Name: John C. Madden Title: CFO, Tesla Energy Operations You are entitled to a completely filled in copy of this Agreement, signed by both you and Tesla, before any work may be started. Solar Subscription&Home Improvement Agreement, V1,4.0, 12/2/19 Tesla, Inc. 1 Solar Subscription and Home Improvement Agreement Terms & Conditions 1. Introduction. This Solar Subscription and Home Improvement Agreement is the agreement between you and Tesla for the subscription of a solar energy system (the "System"). You agree to the recurring "Monthly Subscription Payment" detailed in the Price Sheet and may cancel this subscription at any time, subject to the terms of Tesla's Cancellation Policy. This is a legally binding agreement, so please read everything carefully including all of the exhibits. 2. Eligibility. You agree to the following: (a) You are the only title holder of your Home or have the full power and authority to sign this Agreement on behalf of all other title holders to your Home; (b) You are responsible for any pre-existing conditions at your home that prevent installation of the System (e.g. structural integrity, unpermitted work, condition of the roof). Tesla will not proceed with installation of the System until the condition is remedied; (c) You will notify Tesla if you think the System is damaged or appears unsafe or if the System is stolen; and (d) You will make available, at your cost, a functioning and reliable indoor internet connection with a router, one DHCP enabled Ethernet port with internet access and standard AC power outlet close enough and free of interference to enable an internet-connected gateway provided by Tesla to communicate wirelessly with the System's inverter at all times (e.g. you will notify Tesla if there is any disruption or change to your connectivity). Additionally, you agree to maintain an active Tesla Account while the System is installed at your Home. 3. Changes to Subscription Price. Your Monthly Subscription Payment is subject to change. If your Monthly Subscription Payment is changed, Tesla will provide you with an updated Price Sheet electronically and/or through your Tesla portal. If you do not reject the updated Price Sheet within thirty (30) days and cancel your subscription, your next invoice will reflect the updated pricing. 4. Installation; Service. We will contact you to schedule installation of your System. Installation will be performed by us, our affiliate or subcontractor. You authorize us, our affiliate or subcontractor to submit on your behalf any permit or interconnection application that is required for your System. You also agree to give us, our affiliate or subcontractor access to the installation location identified above (your"Home")as scheduled so we can install and service your System. 5. Automatic Monthly Payments. By entering into this Agreement, you agree to pay the Monthly Subscription Payment by allowing Tesla to automatically debit your credit card each month until you cancel your subscription. Your Monthly Subscription Payment will be debited from your credit card on the monthly anniversary of the day you received permission to operate. You agree to pay at the beginning of each billing cycle for services to be rendered in that billing cycle. If this falls on a weekend or holiday, your Monthly Subscription Payment may be debited the following business day. (a) If your payment is unsuccessful for any reason, you agree that Tesla may attempt the debit three (3) more times within three (3) days following the first attempt. If the credit card debit remains unsuccessful after the third attempt, Tesla will consider this your request to cancel your subscription and turn off your service immediately. 6. Automatic Renewal; Cancellation; Term. Your subscription will automatically renew for the following month unless you email Tesla to cancel your subscription at MyPromect(aDtesla.com or through your Tesla Account. You may cancel this subscription at any time and your service and corresponding Monthly Subscription Payments will end at the end of your billing cycle. You will not receive any pro-rata refunds. (a) If you change your mind after cancelling your subscription, you may re-enroll by emailing IMrProjecta-tesla.com or through your Tesla Account. You will be subject to the then-current pricing, which may be higher than your original Monthly Subscription Price. (b) Tesla reserves the right to cancel service at any time for any reason with thirty (30)days' notice. 7. System Removal. If the System needs to be removed for any reason, such as your cancellation or for roof repairs, you agree to give Tesla reasonable access to your Home to remove the System at Tesla's convenience and availability. Solar Subscription&Home Improvement Agreement V1.4.0, 12/2/19 Tesla,Inc. 2 NMI .�� I � 0 m Tesla will provide you with a competitive quote to complete the removal upon your request to MyProject .tesla.com.Tesla, or one of our subcontractors, will patch and seal all roof penetrations associated with removal of the System. Tesla shall have no obligation to repair any ordinary wear and tear on the Home, or to provide any replacement parts.As an alternative, you may choose to have a similarly qualified service provider remove the System from your Home at your expense. If the System is damaged as a result of the removal, you may be responsible for all costs to repair or replace the System. You may not modify or remove the System without written consent from Tesla. 8. Home Owner's Association. If your home is governed by a home owner's association or similar community organization, you agree to obtain all approvals and authorizations for the System required by that organization and advise us of any requirements of that organization that will otherwise impact the System, its installation or operation. 9. Order Payment. The Order Payment (if any) paid for your Subscription will become non-refundable upon installation of the System. Once your System receives permission to operate,we will return your Order Payment and charge you the Monthly Subscription Payment. 10. Estimated Taxes. You agree to pay any applicable sales or use taxes on the Monthly Subscription Payments due under this Agreement. If you choose to purchase the System at any time, you agree to pay any applicable tax on the purchase price for the System. 11. Selling Your Home. If you sell your Home, you may choose to cancel or transfer this Agreement to the person buying your Home (the "Home Buyer"). If you choose to transfer, the Home Buyer must accept a subscription agreement with Tesla and will assume all of your rights and obligations under this Agreement. 12. Ownership of the System; Tax Credits and Rebates. You agree that the System is Tesla's personal property under the Uniform Commercial Code. You understand and agree that this is a subscription agreement and not a sale agreement. Tesla owns the System for all purposes, including any data generated from the System. You shall at all times keep the System free and clear of all liens, claims, levies and legal processes not created by Tesla, and shall at your expense protect and defend Tesla against the same. (a) You agree all tax credits, incentives, rebates, and certificates are the property of Tesla. You agree to cooperate with Tesla so that we may claim these credits, incentives, rebates and certificates, which may include signing any net metering or interconnection agreements and maintaining a valid internet connection. 13. Purchasing the System.You may purchase the System at any time for the fair market value,which considers then current prices and the System's age and degradation. Tesla will provide you with a purchase price, which may include any past-due payments (if applicable), upon your request to MyProject@tesla.com. 14. UCC-1 Fixture Filing. Tesla may choose to file in the real estate records a UCC-1 financing statement ("Fixture Filing") that preserves their rights in the System for as long as the System is installed on your Home. The Fixture Filing is intended only to give notice of its rights relating to the System and is not a lien or encumbrance against the Property. 15. Transfer. Tesla may assign, sell or transfer the System and this subscription agreement, or any part of this subscription agreement or the exhibits, without your consent. 16. Privacy. The Tesla Customer Privacy Policy is part of this Agreement. You agree to be contacted at the phone number that you provide us with more information or offers about Tesla products. You understand these calls or texts may use automated dialing or pre-recorded messages. This consent is not a condition of this Agreement. You may opt out of this consent at any time by contacting us at 888-765-2489. 17. Intellectual Property. We own all intellectual property rights associated with the System. We grant you a non- exclusive license to use any imbedded software in connection with the operation of the System only. 18. Solar System Maintenance & Operation. Tesla will provide you with an initial copy of the Solar Operation and Maintenance Guide (which may be updated from time to time, the "Manual"). The Manual provides you with System operation and maintenance instructions, answers to frequently asked questions, troubleshooting tips and service information. You must maintain and operate the System in accordance with the instructions in the Manual. If we install a safety anchor in your roof during the installation of the System, we will leave this anchor installed for our future use throughout the installation and operation of the System. This safety anchor is for our use only. You are not authorized to use this anchor. Solar Subscription&Home Improvement Agreement V1.4.0, 1212/19 Tesla,Inc. 3 1 j RE. 0 19. Insurance. Tesla shall insure the System against all damage or loss unless (a) that damage or loss is caused by your gross negligence; or(b)that damage or loss is caused by ball strikes; or(c) you intentionally damage the System. 20. Indemnity. To the fullest extent permitted by law, you shall indemnify, defend, protect, save and hold harmless Tesla, its employees, officers, directors, agents, successors and assigns from any and all third party claims, actions, costs, expenses (including reasonable attorneys' fees and expenses), damages, liabilities, penalties, losses, obligations, injuries, demands and liens of any kind or nature arising out of, connected with, relating to or resulting from your negligence or willful misconduct; provided, that nothing herein shall require you to indemnify Tesla for its own negligence or willful misconduct. The provisions of this paragraph shall survive termination or expiration of this subscription agreement. 21. Limitation of Liability. (a) We are not liable to you for any indirect, special or consequential damages arising out of this Agreement. To the extent permitted by law, our aggregate liability to you under this Agreement is limited to the fair market value of the System ("FMV"). These limitations apply to any liability arising out of any site survey performed by us or our affiliate or subcontractor in connection with this Agreement. (b) The Limited Warranties in Section 22 do not apply to any breach by Tesla directly or indirectly caused by or resulting from any of the following: (i) abuse, misuse or negligence, (ii) accidents or other events beyond Tesla's (or its affiliates', subcontractors' or representatives') reasonable control, including but not limited to lightning, flood, earthquake, fire, excessive wind and other extreme weather events; (iii)failure to operate or maintain the Solar System in accordance with the Manual; (iv) strikes by balls or other objects, dirt, dust, bird excrement, animals, insects, foliage or algae growth; (v) water entering around a fitting,accessory or other material not supplied by Tesla; (vi)any material or equipment not supplied by Tesla that the Solar System may be connected to; (vii) someone other than Tesla installing, removing, re-installing or repairing the Solar System (including, but not limited to, damaging the Solar System during such work) unless that party does so in compliance with the Manual; or(viii)any Solar System failure or lost or diminished performance that results from your actions or omissions that are not in compliance with the Limited Warranties. (c) The Limited Warranties in Section 22 do not cover(a)conditions at your Home not caused by our breach, including, but not limited to, unpermitted conditions, improper electrical wiring, defects in the roof structure that cause it to sag over time,chimney or exhaust vent heights that are reduced by your Solar System,cracked or crumbling masonry, or inadequate attic ventilation; (b) normal wear and tear or deterioration, or superficial defects, dents or marks that do not impact the performance or functionality/integrity of your Solar System; (c) damage or deterioration that occurs after the expiration or voiding of all or part of the Limited Warranties; or(d)theft or vandalism of your Solar System or any of its components. 22. Limited Warranties. Your System and installation work are covered by the following limited warranties. THESE ARE THE ONLY EXPRESS WARRANTIES MADE IN CONNECTION WITH THE SYSTEM AND INSTALLATION WORK. Any other warranties, remedies and conditions, whether oral, written, statutory, express or implied (including any warranties of System performance or merchantability and fitness for purpose, and any warranties against latent or hidden defects)are expressly disclaimed. If such warranties cannot be disclaimed,Tesla limits the duration of and remedies for such warranties to the durations and remedies described below. System Under normal use and service conditions, the System will be free from defects in workmanship or defects in, or a breakdown of, materials or components for the length of your subscription. This warranty is voided for any time that the subscription is not active. Roof All roof penetrations we make for your System will be watertight.This warranty will run the longer of(a) the first ten (10) years following installation of the System or (b)the length of any existing installation warranty or new home builder performance standard for your roof. This warranty is voided for any time that the subscription is not active. ------------- Damage We will repair damage we cause to your Home, your belongings or your property or pay you for the damage we cause, as limited by Section 22, for the length of your subscription (except damages that result from our roof penetrations, which damages are covered for the first ten (10) years.)This warranty is voided for any time that the subscription is not active. Solar Subscription&Home Improvement Agreement V1.4.0, 12/2/19 Tesla,Inc. 4 ❑� T 219M 23. Breach; Remedies. If you are in breach of this Agreement, upon seven (7) days prior written notice, Tesla may pursue any remedy it has under this Agreement or at law, including termination,suspension of performance or maintenance, repossession of the System (if title has not yet transferred) and collection of all amounts due (including those past due, which will be charged 2% interest per annum). 24. Notices. You can find applicable lien notices, certain warnings required by law, and details of our insurance in Exhibit 2. 25. Governing Law; Integration. This Agreement is governed by the laws of the State where your System is installed. The information at the links described above is part of this Agreement. Any other terms relating to your System that are not contained or referred to in this Agreement are not binding on us or you. 26. Agreement to Arbitrate. Please carefully read this provision, which applies to any dispute between you and Tesla, Inc. and its affiliates (together"Tesla"). If you have a concern or dispute, please send a written notice describing it and your desired resolution to resolutions@_tesla.com. If not resolved within 60 days, you agree that any dispute arising out of or relating to any aspect of the relationship between you and Tesla will not be decided by a judge or jury but instead by a single arbitrator in an arbitration administered by the American Arbitration Association (AAA) under its Consumer Arbitration Rules. This includes claims arising before this Agreement, such as claims related to statements about our products. We will pay all AAA fees for any arbitration, which will be held in the city or county of your residence. To learn more about the Rules and how to begin an arbitration, you may call any AAA office or go to www.adr.org. The arbitrator may only resolve disputes between you and Tesla and may not consolidate claims without the consent of all parties. The arbitrator cannot hear class or representative claims or requests for relief on behalf of others purchasing or leasing Tesla products. In other words, you and Tesla may bring claims against the other only in your or its individual capacity and not as a plaintiff or class member in any class or representative action. If a court or arbitrator decides that any part of this agreement to arbitrate cannot be enforced as to a particular claim for relief or remedy (such as injunctive or declaratory relief), then that claim or remedy (and only that claim or remedy)shall be severed and must be brought in court and any other claims must be arbitrated. If you prefer, you may instead take an individual dispute to small claims court. You may opt out of arbitration within 30 days after signing this Agreement by sending a letter to: Tesla, Inc.; P.O. Box 15430; Fremont, CA 94539-7970, stating your name, product, and intent to opt out of the arbitration provision. If you do not opt out,this agreement to arbitrate overrides any different arbitration agreement between us, including any arbitration agreement in a lease or finance contract. Solar Subscription&Home Improvement Agreement V1.4,0, 12/2/19 Tesla, Inc. 5 Version#82.2-1 NAS February 22,2020 RE: CERTIFICATION LETTER Project/Job#JB-0103008-00 Project Address: Glenny Residence 51 Phillips PI#2 Northampton,MA 01060 AHJ Northampton SC Office Marlborough Design Criteria: Applicable Codes=Structure:MA Res.Code,9th Edition; PV:MA Res.Code,9th Edition,ASCE 7-10,and 2015 NDS Risk Category=II Wind Speed=120 mph,Exposure Category C, Partially/Fully Enclosed Method Ground Snow Load=40 psf MP1: Roof DL=10.5 psf, Roof LUSL=35 psf(Non-PV), Roof LUSL=21.1 psf(PV) MP2: Roof DL=10.5 psf, Roof LUSL=35 psf(Non-PV), Roof LUSL=27.5 psf(PV) Note: Per IBC 1613.1; Seismic check is not required because Ss=0.171 <0.4g and Seismic Design Category(SDC)=B<D To Whom It May Concern, A structural evaluation of loading was conducted for the above address based on the design criteria listed above. Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the prescriptive compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally,I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval. Installer shall verify existing roof framing is in suitable condition and does not exhibit any signs of structural damage which may diminish the capacity of its members or connections prior to commencement of PV installation. Installer verification of the mounting planes noted above is required because some or all of the framing was not observed prior to the structural evaluation performed for this report. Digitally signed ,t�k OFgss�� Chris by Chris H Kim CHRIS H. Date: KIM NO. 52430 1 1 1 ti H K• 2020.02.24 , , 16:17:00 -05'00' NA` Tesla,Inc. T =— S L Pi Version#82.2-1 NAS HARDWARE DESIGN AND STRUCTURAL EVALUATION RESULTS SUMMARY TABLES Landscape Hardware-Landscape Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1 72" 24" 39" NA Staggerec MP2 72" 24" 39" NA Staggerec 49.9 Portrait Hardware-Portrait Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever Y-Y Spacing Y Y Cantilever Configuration Uplift DCR MP1 48" 20" 66" NA Staggered 62.0% MP2 48" 20" 66" NA Staggered 56.0% X and Y are maximums that are always relative to the structure framing that supports the PV. X is across rafters and Y is along rafters. Mounting Plane Roof Pitch Qualification Results (Degrees) Member Evaluation Results MP1 34` Member Impact Check OK MP2 23` Member Impact Check OK Tesla,Inc. ES L ABBREVIATIONS ELECTRICAL NOTES A AMPERE 1. THIS SYSTEM IS GRID—INTERTIED VIA A UL—LISTED AC ALTERNATING CURRENT POWER—CONDITIONING INVERTER. BLDG BUILDING 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. CONIC CONCRETE 3. A NATIONALLY—RECOGNIZED TESTING LABORATORY DC DIRECT CURRENT SHALL LIST ALL EQUIPMENT IN COMPLIANCE WITH EGC EQUIPMENT GROUNDING CONDUCTOR ART. 110.3. (E) EXISTING 4. WHERE ALL TERMINALS OF THE DISCONNECTING EMT ELECTRICAL METALLIC TUBING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, FSB FIRE SET—BACK A SIGN WILL BE PROVIDED WARNING OF THE GALV GALVANIZED HAZARDS PER ART. 690.17. GEC GROUNDING ELECTRODE CONDUCTOR 5. EACH UNGROUNDED CONDUCTOR OF THE GND GROUND MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY HDG HOT DIPPED GALVANIZED PHASE AND SYSTEM PER ART. 210.5. 1 CURRENT 6. CIRCUITS OVER 250V TO GROUND SHALL COMPLY Imp CURRENT AT MAX POWER WITH ART. 250.97, 250.92(B). Isc SHORT CIRCUIT CURRENT 7. DC CONDUCTORS EITHER DO NOT ENTER BUILDING kVA KILOVOLT AMPERE OR ARE RUN IN METALLIC RACEWAYS OR kW KILOWATT ENCLOSURES TO THE FIRST ACCESSIBLE DC LBW LOAD BEARING WALL DISCONNECTING MEANS PER ART. 690.31(E). MIN MINIMUM 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN (N) NEW RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY NEUT NEUTRAL UL LISTING. NTS NOT TO SCALE 9. MODULE FRAMES SHALL BE GROUNDED AT THE OC ON CENTER UL—LISTED LOCATION PROVIDED BY THE PL PROPERTY LINE MANUFACTURER USING UL LISTED GROUNDING P01 POINT OF INTERCONNECTION HARDWARE. PV PHOTOVOLTAIC 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE SCH SCHEDULE BONDED WITH EQUIPMENT GROUND CONDUCTORS. S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT GENERAL NOTES ALL WORK TO COMPLY WITH ALL LOCAL BUILDING, RESIDENTIAL, FIRE AND ELECTRICAL CODES MODULE GROUNDING METHOD: ZEP SOLAR REV BY DATE COMMENTS REV A NAME DATE COMMENTS s s s s s s « s s CONFIDENTIAL — THE INFORMATION HEREIN CUSTOMER: DESCRIPTION. CONTAINED SHALL NOT USED FOR THE Mark Glenny 3.78 KW PV ARRAY T :'- 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN 51 Phillips PI 3.8 KW (AC NAMEPLATE) PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENTS MA 1060 ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES Northampton, THE SALE AND USE OF THE RESPECTIVE (12) Hanwha Q—Cells # Q.Peak DUO BLK—G5/SC315 REV. DATE TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PACE NAME: PERMISSION OF TESLA INC. SOLAREDGE SE380OH—USOOOBSU4 I COVER SHEET 1 2/10/2020 PITCH: 34 ARRAY PITCH:34 MP1 AZIMUTH: 159 ARRAY AZIMUTH: 159 MATERIAL: Comp Shingle STORY: 2 Stories PITCH: 23 ARRAY PITCH:23 MP2 AZIMUTH:249 ARRAY AZIMUTH:249 PROPOSED MATERIAL: Comp Shingle STORY: 2 Stories EQUIPMENT O LOCATION WOO P\ Front Of House 5� 7� e (E)DRIVEWAY 6 8 0 LEGEND SV 0 (E) UTILITY METER & WARNING LABEL e I�� INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS e ® © DC DISCONNECT & WARNING LABELS AC AC DISCONNECT & WARNING LABELS ® o O DC JUNCTION/COMBINER BOX & LABELS DISTRIBUTION PANEL & LABELS Lc LOAD CENTER & WARNING LABELS O DEDICATED PV SYSTEM METER � SV Rso RAPID SHUTDOWN m m 0 STANDOFF LOCATIONS CONDUIT RUN ON EXTERIOR -- CONDUIT RUN ON INTERIOR GATE/FENCE Q HEAT PRODUCING VENTS ARE RED r, I. I INTERIOR EQUIPMENT IS DASHED L-'J SITE PLAN N Scale: 3/32" = 1' w E 01, 10' 21' e S CONFIDENTIAL- THE INFORMATION HEREIN DESCRIPTION. CONTAINED SHALL NOT BE USED FOR THE 3.78 KW PV ARRAY T 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC., NOR11mwsOLAREDGE UNTING SYSTEM: SHALL IT BE DISCLOSED IN MOLE OR IN S Comp V4 w Flashing—Insert 3.8 KW (AC NAMEPLATE) PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH DULES THE SALE AND USE OF THE RESPECTIVE 12) Hanwha Q—Cells # Q.Peak DUO BLK—G5/SC315 TESLA EQUIPMENT, WITHOUT THE WRITTEN VERTER: PAGE NAME: PERMISSION OF TESLA INC. SE3800H—USOOOBSU4 SITE PLAN S1 (N) PV MODULE (E) MOUNTING PLANE (MP) TYPICAL PV SIDE VIEW sv NT S PV MODULE 5/16"x1.5" BOLT WITH 5/16" FLAT WASHER INSTALLATION ORDER ZEP LEVELING FOOT LOCATE RAFTER, MARK HOLE ZEP ARRAY SKIRT (1) LOCATION, AND DRILL PILOT HOLE. ZEP MOUNTING BLOCK ATTACH FLASHING INSERT TO LOCK AND ATTACH ZEP FLASHING INSERT (3) (2) MO RAF`TERBUSING LAG SCREW. (E) COMP. SHINGLE (1) INJECT SEALANT INTO FLASHING (E) ROOF DECKING (2) (3) INSERT PORT, WHICH SPREADS SEALANT EVENLY OVER THE 5/16" DIA STAINLESS ROOF PENETRATION. STEEL LAG SCREW LOWEST MODULE SUBSEQUENT MODULES (2-1/2° EMBED, MIN) INSTALL LEVELING FOOT ON TOP [(4) OF MOUNTING BLOCK & (E) RAFTER SECURELY FASTEN WITH BOLT. S1 STANDOFF CONFIDENTIAL- THE INFORMATION HEREIN CONTAINED SHALL NOT USED FOR THE T = 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC., NOR NOUN7ING SYSTEM: SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Comp V4 w Flashing—Insert PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE TESLA EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME: PERMISSION OF TESLA INC. STRUCTURAL VIEWS WEIGHTED TSRF READINGS MP1 : TSRF READINGS: 0-00 N PROPOSED TSRF AVG: 00% EQUIPMENT O PORTION OF SYSTEM: 0 / OOMODULES = 00 W E LOCATION MP CALCULATION: (00) x (00%) =.000 MP2 : TSRF S READINGS: 0-00 TSRF AVG: 00% PORTION OF SYSTEM: 0 / OOMODULES =00 PhW��Wps P�5� Front Of House MP CALCULATION: (00 ) x (007.) =.000 MP3 : TSRF READINGS: 0-00 TSRF AVG: 00% (E)DRIVEWAY PORTION OF SYSTEM: 0 / OOMODULES = 00 MP CALCULATION: (00) x (007.) =.000 CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: JB-0103008 0 0 CUSTOMER DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE Mark GII nny 3.78 KW PV ARRAY Erick Arce Montes T 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC., NOR MOUNTING SYSTEM: SHALL IT BE DISCLOSED IN MOLE OR IN ZS Comp V4 w Metal—Flashing 51 Phillips PI PART OTHERS OUTSIDE THE CONNECTION WITH ORGANIZATION, I MODULES: Northampton, MA 01060 THE SALE AND USE OF THE RESPECTIVE� (12) Hanwha Q CELLS # Q.PEAK DUO BLK—G5/SC315 TESLA EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME SHEET: REV: DATE: PERMISSION OF TESLA INC. INVERTER: 5082776282 1 2/10/2020 SolarEd e Technologies Ltd. SE3800H—US 240V MA TSRF PLAN WARNING:PHOTOVOLTAIC POWER SOURCE Label • • •WARNING , . •. • Location: • WARNING Per Code: ELECTRIC SHOCK HAZARD •er Code: Per Code: NEC ELECTRIC SHOCK HAZARD 690.31.G.3 DO NOT TOUCH TERMINALS '•1 13 NEC •THE DC CONDUCTORS OF THIS 1 Label Location: TERMINALS ON BOTH LINE AND PHOTOVOLTAIC SYSTEM ARETO BE USED WHEN LOAD SIDES MAY BE ENERGIZED UNGROUNDED ANDINVERTERIS PHOTOVOLTAIC DCD Code: IN THE OPEN POSITION MAY BE ENERGIZED UNGROUNDED NEC DISCONNECTPer 690.14.C.2 _ "' Location: LAR PV SYSTEM ABB/Delta Label: Location: '• Location: PHOTOVOLTAIC SYSTEM In!17CH •�-EQUIPPED WITH RAPID •d-._ C••_ SHUTDOWN .•1 . SHUTDOWN .'1 . •. TURN NEC ' 1 53 MffSWT.'+ CURRENT(Isc)_A ,•. • • • aAFMY Per WARNING `� + �� �7 Code: R: INVERTER OUTPUT CONNECTION 690.64.B.7 Label • • DO NOT RELOCATE WARNING (INV) Label • , Per DEVICE � ' • � ELECTRIC SHOCK HAZARD Code: e Inverter NEC 1 # ' f • . • •Per Cde: • IF A GROUND FAULT IS INDICATED v q. NORMALLY GROUNDEDNEC .•1 CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED .•- Location: ' CAUTION i. ',1,Tw Per Code: 1, 1 SWT PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFEDNEC ••1 • /1 SMW AM ASM i Label Location: SH=KAZAM WARNING (DC) (CB) OTHEAMY Per ..- ELECTRICALSHOCK HAZARD DO NOT TOUCH TERMINALSNEC 690.17(4) OAD SIDES MAY BE ENERGIZED CAUTION IN THE OPEN POSITION DUAL POWER SOURCEPer Code: DC VOLTAGE IS SECOND SOURCE ISNEC 690.64.13.4 ALWAYS PRESENT WHEN PHOTOVOLTAIC SYSTEM SOLAR MODULES ARE EXPOSED TO SUNLIGHT Label • • PHOTOVOLTAIC POINT OF '• Label Location: INTERCONNECTION Per CodeACWARNING:ELECTRIC SHOCK u • _ HAZARD.DO NOT TOUCH 690.17.4; 690.54 DISCONNECTNEC TERMINALS.TERMINALS ON 690.14.C.2 Combiner NEC BOTH THE LINE AND LOAD SIDE '' MAY BE ENERGIZED IN THE OPEN (D): Distribution (DC): DC Disconnect POSITION.FOR SERVICE DE-ENERGIZE BOTH SOURCE _ AND MAIN BREAKER. ' Conduit Label • - • PV POWER SOURCE (INV): Inverter With Integrated DC Disconnect MAXIMUM AC A MAXIMUM AC _ A OPERATING CURRENT ._ •• OPERATING • CURRENT MAXIMUM AC (M): Utility Meter 690.54o MAXIMUM AC OPERATING VOLTAGE 1 MEMO _ V • • • • .1i'SOlarCity ZepSolar Next-Level PV Mounting Technology ^So1arGty Zep Solar Next-Level PV Mounting Technology ZS Comp Components _______ for composition shingle roofs U Mounting Block Array Skirt Interlock Part No.850-1633 Part No.850-1608 or 500-0113 Part No.850-1388 or 850-1613 Listed to UL 2703 and UL 2582 Listed to UL 2703 Listed to UL 2703 Flashing Accessory Grip Ground Zep V2 Part No.850-1634 Part No.850-1606 or 850-1421 Part No.850-1511 Listed to UL 2703 and UL 2582 Listed to UL 2703 Listed to UL 467 and UL 2703 �OMPAT Description PV mounting solution for composition shingle roofs ~FA / e� Works with all Zep Compatible Modules ®OMPps Auto bonding UL-listed hardware creates structural and electrical bond • ZS Comp has a UL 1703 Class"A"Fire Rating when installed using modules from any manufacturer certified as"Type 1"or'Type 2" Captured Washer Lag End Cap DC Wire Clip &ISTED Part No.850-1631-001 Part No. Part No.850-1509 Specifications 850-1631-003 (L)850-1586 or 850-1460 Listed to UL 1565 (R)850-1588 or 850-1467 • Designed for pitched roofs • Installs in portrait and landscape orientations • ZS Comp supports module wind uplift and snow load pressures to 50 psf per UL 2703 • Wind tunnel report to ASCE 7-05 and 7-10 standards • ZS Comp grounding products are UL listed to UL 2703 and UL 467 ZS Comp bonding products are UL listed to UL 2703 • Engineered for spans up to 72"and cantilevers up to 24" Zep wire management products listed to UL 1565 for wire positioning devices • Attachment method UL listed to UL 2582 for Wind Driven Rain - Leveling Foot Part No.850-1397 zepsolar.com zepsolar.com Listed to UL 2703 This document does riot create any express warranty by Zep Solar or about its products or services.Zep Solar's sole warranty is contained in the written product warranty for This document does not create arty express wartarty by Zep Solar or about its products or services.Zep Solars sole wartanly is contained in the written product warranty for each product.The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty.The customer is solely each product.The end-user documentation shipped with Zep Solar's products constitutes the sole specifications referred to in the product warranty.The customer is solely responsible for verifying the suitability of ZepSolar's products for each use.Specifications are subject to change without nofice.Patents and Apps:zspats.com. responsible for verifying the suitability of ZepSolar's products for each use.Specifications are subject to change without notice.Patents and Apps:zspats.cem. Document A 800-1890.001 Rev C Date last exported: May 24,2016 4:51 PM Document i 600.1890-001 Rev C Date last sported: May 24,2016 4:51 PM • so I a r = e e = so I a r = • • SolarEdge Power Optimizer - Zep Compatible TM Module Add-On For North America P400-ZEP SolarEdge Power Optimizer - -- -._ ----__—_----- r P300-ZEP(for60teit PV modules) I P400-ZEP(for 72&96-cell modules) , INPUT Rated Input DC powerl'>.................................. 300 .........I........400 W Zep Compatible Module Add-On Absolute Maximum Input Voltage(Voc at lowest 48 80 Vdc temperature) • MPPTOperatingRange i....................8 48 &80..................... ....Vdc..... For North America P300-ZEP P400-ZEP .. ..................... ....- . ................. f Maximum Short Circuit Current(Isc) 10 10.1 Adc ........................._........._ ........................ .-........-...__.......-..................... ............................................... .............. Maximum DC Input Current .. 12:5.. ........ ......... ....... .. ......... Adc _.................................._..... Maximum Efficiency -. % .................................... ............................................................................................... .............. • Weighted Efficiency 98.8 % Ove rvoltage Category II OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) _ Safety Output Voltage per Power Optimizer 1 Vdc STANDARD COMPLIANCE • EMC FCC Part15 Class B,IEC61000-6-2,IEC61000-6-3 ............... .......................................................................... .............. Safety IEC62109-1(class II safety),UU741 ................................ ............. ...............-..........i.............. RoHS Yes r INSTALLATION SPECIFICATIONS �2fjxeaTs Maximum Allowed System Voltage 1000 Vdc �3stan"� Dimensions including mounting bracket (WxLxH) 128 x 196 x 27.5/5 x 7.71 x 1.08 128 x 196 x 35/5 x 7.71 x 1.37 mm/in Dimensions excluding mounting bracket(WXLxH) 128 x 152 x 27.5/5 x 5.97 x 1.08 5 x 5 7 x 152 x 35/ mm/in Sx .97x1.3 Weight(including cables and mounting bracket) 720/1.6............. ' 840/1.9 kg/Ib ..................... P .................. ...... .....-- Input Connector MC4 Com alible Output Connector Double Insulated•MC4 Compatible ............................................... ...................... . . ................... ............ Output Wire Length 0.95/3.0 I 1.2'/'3'.'9 m/ft ..................... ................................I..... . . .....-........................................ ..... Operating Temperature Range -40-+85/-40-+185 'C/'F ........ .. .............. .. . ......... .... ........... ... . ............ ............... .............. Protection Rating IP68/NEMA 6P ................................................................. ............................................................................................... .......... .. Relative Humidity................ ............ . _.-..........-............ "100 .. ........ ..... .. . . lu Rated STC power of the module.Module of up to+5%power tolerance allowed. PV SYSTEM DESIGN USING A SINGLE PHASE THREE PHASE THREE PHASE SOLAREDGEINVERTER0 HD-WAVE SINGLE PHASE 208V 480V Minimum String Length(Power Optimizers) 8 10 18 Compatible with Zep Groove framed modules .Ma>um�m.su�l,g..e�g....th We�opnm�Ze�s. .. 5... ..... .... .. ... . .. 2s ..... .........so...... . ..... . 5700(6000 with Maximum Power per String I 5250 6000 12750 W — Certified Zep Compatible'"`bracket — Mitigates all types of module mismatch losses,from SE7600H US) — Attaches to module frame without screws-reduces on-roof manufacturing tolerance to partial shading Parallel Strings of Different Lengths or labor and mounting costs — Flexible system design for maximum space utilizationOrientations.._..... .. ....................................... .................................. . es fn For detailed str ng sii ng information refer to:http://www solaredge.com/sites/defauf/files/string-sizing-na.pdf — Power optimizer equipment grounded through the bracket — Next generation maintenance with module-level monitoring — Up to 25%more energy — Module-level voltage shutdown for installer and firefighter — Superior efficiency(99.5%) safety C E 011 Li USA-CANADA-GERMANY ITALY-FRANCE-JAPAN-CHINA-AUSTRALIA-THE NETHERLANDS-UK-ISRAEL-TURKEY-HUNGARY-BELGIUM-ROMANIA-BULGARIA www.solaredge.us solar=esSingle Phase Inverters for North America solar=se SE3000H-US/SE380OH-US/SE5000H-US/SE6000H-US/SE760OH-US/ SE10000H-US/SE1140OH-US So l a r E d g e Single Phase Inverters OUTPUT r SE3000H-US SE3800H-US SESMH-US I SE6000H-US SE76001!US SE10000H-US T SE11400H-US�-- Rated AC Power Output 3000 3800 @240V 5000 6000 7600 10000 11400 VA ................... _.......... .38 .@294 .. ................ for North America Max.AC Power Output 3000 5000 6000 7600 10000 11400 VA 3300,@208V•. ................ ................ ................ ................. ................. ........... SE3000H-US/ SE380OH-US/ SE5000H-US/ SE6000H-US / AC Output VoltageMin:Nom: 0( - - _ _ vac SE760OH-US/ SE10000H-US/ SE1140OH-US Max:.�is3,-2oageMin.-N.............. .. . ..... ................. . ............... ................ ................ ................. ................. .......I. AC Output Voltage Min.-Nom: � � � V, 00" ,"If ./ Vac Max:.(211•-240,-264)............... ................. . ACFpe Ven Nominal 59.3-60-60.5(11 Hz 4....ry.(.....:...1...... ..............:.. ................. ................ ................ ................ ................. ................. .... Maximum Continuous Output 16 24 A Current 208V . ...................................... ................. ................. ................ ................ ................ ................. ................. ........... Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A Current 240V GFDI Threshold 1 A .. .......................... .......................................................................................................................... Utility Monitoring,Islanding Protection,Country Configurable Yes 25 , Thresholds INPUT WeRaatY `.' Maximum DC Power 4650 5900 7750 9300 11800 15500 17670 W ........................ ................. .................I................ ........... ....�............. . �w..�°` `. Transformer-less,Un rounded Yes Maximum Input Voltage............ 480 Vdc.... iS Nominal DC Input Voltage 380 400 Vdc ..... ' Maximum Input Current 208V 9 13.5 Adc Maximum l, t Current 240V 8:5 lOS 13.5 16.5 20 27 30.5 Adc Max;Input Short Circuit Curren 45 Adc ........... .......................................................................................................................... ........... Reverse-Polari Protection ................... .................I....................Yes tY..................... . ............................................................. ........... Ground-Fauk Isolation Detection 600ko Sensitivity d Maximum Inverter Efficiency....... .......99....... ...................................I..............�... .....................................I........I.... ....45 ?�... .CEC Weighted Efficiency. 99 % + Nighttime Power Consumption <2.5 W ADDITIONAL FEATURES O Supported Communication • -- Interfaces 85485,Ethernet,Zigeee(optional),Cellular(optional) .,< J ........................................ ........................................................OptionaN...........2i....................................................... ........... Revenue Grade Data,ANSIC12.20 ....-.......-...................................... Rapid Shutdown-NEC 2014 and le 2017 690.12 Automatic Rapid Shutdown upon AC Grid Disconnect 0 STANDARD COMPLIANCE SafetyUL3741,UL1741 SA,UL1699B,CSA C22;2 ,Canadian AFCI according to T.I.L;M-07 ♦ . Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI) ...................................... .......... Emissions FCC Part 15 Class B ...... INSTALLATION SPECIFICATIONS AC Output Conduit Size/AWG Ran a 3/4"minimum/20-4 AWG . ....g................................. DC Input Conduit Size/#of Strings 3/4"minimum/1-2 strings/14-6 AWG minimum/1-3 strings/ J AWG Range........................ ........... 14-6 AWG............ Dimensions with Safety Switch 21.3 x 14.6 ' 21.3 x 14.6 Optimized installation with HD-Wave technology (HxWxD) 17.7 x 14.6 x 6.8/450x370x174 x7.7/540x x7.3/540'x in/mm _. 370x,195... ...370•x,185... Specifically designed to work with power optimizers •• :.••.• ......••• •••.•••• •.•••.......•••• • Weight with Safety Switch 22/10 • 251/11.4 26.2/11:9 38.8/17.6 401%18;2 Ib/,kg ................... Record-breaking efficiency Noise <25 <50 dBA Fixed voltage inverter for longer strings Cooling Natural Convection Natural convection and internal fan(user ............................. ...................replaceable)................... ........... Integrated arc fault protection and rapid shutdown for NEC 2014 and 2017,per article 690.11 and 690.12 ..operaiing.Temperature Range -13 to+14o/-z5 to+6d'1(40'F/ 4o'Coption)1s1 'F/'c - UL1741 SA certified,for CPUC Rule 21 grid compliance Protection Rating NEMA 3R(inverter with SafetySwttch) .. .......... pi For other regional settings please contact SolarEdge support Extremely small 11 Revenue grade inverter P/N:S n refer to:ht7NNC2 N1 For power de-rating information refer to:https://www.solaredge.mm/sites/defauk/files/se-temperature-derating-note-na.pdf - High reliability without any electrolytic capacitors �1-0O version P/N:SE�uoocH-USOOONNU4 Built-in module-level monitoring II��� /W�D Outdoor and indoor installation wave - Optional:Revenue grade data,ANSI C12.20 Class 0.5(0.5%accuracy) Simple configuration and commissioning with smartphone app and built in Wi-Fi(SE10000H-US,SE11400H-US) I,Frnm ROHS USA-CANADA-GERMANY-UK-ITALY-THE N ETHER LAN DS-JAPAN-CHINA-AUSTRALIA-ISRAEL-FRANCE-BELGIUM-TURKEY-INDIA-BULGARIA-ROMANIA-HUNGARY-SWEDEN- wwwsolaredgre.US o SolarEdge Technoiogies.Inc.All rights reserved.SOLAREDGE. logo.dge OPTIMIZED BY SOLAREDGE SOUTH AFRICA-POLAND-CZECH REPUBLIC are trademarks or registered _ Date: r •' powered by MECHANICAL SPECIFICATION Format 66.3in x 39.4in x 1.57 in(including frame) _ (1685 mm x 1000 mm x 40 mm) Weight 44.51bs(20.2 kg) ..o-...�.o.r:. Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass with anti-reflection technology •�°"may Back Cover Composite film Frame Black anodized aluminum M100°^ Cell 6 x 20 monocrystalline Q.ANTUM solar half-cells __0 )unction box 2.76-3.35in x 1.97-2.76 in x 0.51-0.83in (70-85mm x 50-70mm x 13-21 mm),decentralized,IP67 Cable 4mm2 Solar cable;(+)a43.3in(1100mm),(-)a43.3in(1100mm) Connector Multi-Contact MC4,IP68 oa,�, ,I O T°'•'�-' • , ' ' 310-320, POWER CLASS 310 315 320 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5W/-OW) Power at MPP' PMPP 1W1 310 315 320 SOLAR MODULE Short Circuit Current' Is° [A] 9.83 9.89 9.94 E Open Circuit Voltage' Von [V] 40.02 40.29 40.56 Current at MPP' IMPP [A] 9.36 9.41 9.47 Voltage at MPP' VMPP [V] 33.12 33.46 33.80 The new Q.PEAK DUO BLK-G5/S solar module from Q CELLS impresses Efficiency' q 1%] a18.4 a18.7 x19.0 thanks to innovative Q.ANTUM DUO Technology,which enables particularly MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NOC' high performance on a small surface,and a black Zep CompatibleTM frame Power at MPP2 PMPP 1W1 229.7 233.5 237.2 design for improved aesthetics, easy installation and increased safety. Short Circuit Current' Ise [A] 7.93 7.97 8.02 Open Circuit Voltage' V°c [V) 37.43 37.69 37.94 Q.ANTUMr s world-record-holding cell concept has now been combined Current at MPP' I_ [A] 7.36 7.41 7.45 with state-of-the-art circuitry half cells and a six-busbar design, thus Voltage at MPP' V, [V] 31.20 31.52 31.84 achieving outstanding performance under real conditions - both with 1100011ii 25'C,spectrum AM 1.5G 2 Measurement tolerances STC t 3%;NOC t5% '800W/m2,NOCT,spectrum AM 1.513 typical values,actual values may differ low-intensity solar radiation as well as on hot, clear summer days. Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE x y -acus Al least 98%of nominal power during first year. ?<11p Q.ANTUM TECHNOLOGY:LOW LEVELIZED COST OF ELECTRICITY °OY°a",r„ Thereafter max.0.54%degradation per year. 3; � ------------- At least 93.1%of nominal power up to 10 years. � i ---------- W G Higher yield per surface area, lower BOS costs, higher power At least 85%of nominal power up to 25 years. W classes, and an efficiency rate of up to 19.3%. a= '° g , � All data within measurement tolerances. Sao --r-----i-----�-----;-----� Full warranties in accordance with the warranty 5 terms of the Q CELLS sales organization of your Q INNOVATIVE ALL-WEATHER TECHNOLOGY f b respective country. Optimal yields,whatever the weather with excellent low-light IMOLUCE[WIWI and temperature behavior. ° A -- YEARS Typical module performance under low irradiance conditions in comparison to STC conditions(25'C,1000W/m2). m ENDURING HIGH PERFORMANCE �+ a LS R niii TEMPERATURE COEFFICIENTSLong term yield security with Anti LID and Anti PID Technology', TOP BRAND PV � Temperature Coefficient of Isr p (%/K] +0.04 Temperature Coefficient of Va [i [%/K] -0.28 m Hot-Spot Protect and Traceable Quality Tra.QTM. Temperature Coefficient of PM V [%/K] -0.37 Normal Operating Cell Temperature NOCT [°F] 113 t5.4(45 t3°C) 12 2018 x EXTREME WEATHER RATING PROPERTIES DESIGN0 1 High-tech aluminum alloy frame, certified for high snow Maximum System VoltageVsys1000(IEC)/1000(UL) Safety Class II (5400 Pa)and wind loads(4000 Pa) regarding IEC. GOMpAT/ Maximum Series Fuse Rating [A DC] 20 Fire Rating C(IEC)/TYPE 1(UL) o Design load,push(UL)2 [11119m] 50(2400 Pa) Permitted module temperature -40°F up to+185°F W A RELIABLE INVESTMENT on continuous duty (-40°C up to+85°C) O Inclusive 12-year product warranty and 25-year j 4Y Design load,pull(Uu° [lbs/ft'] 50(240OPa) I see installation manual Fq v linear performance guarantee2. epraPa��� QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION UL 1703;CE-compliant; Number of Modules per Pallet 26 STATE OF THE ART MODULE TECHNOLOGY IEC 61215(Ed.2);IEC 61730(Ed.1),application class A Q.ANTUM DUO combines cutting edge cell separation ' APT test conditions according to Number of Pallets per 53'Trailer 32 �pMYAr, IEC/TS 62804-1:2015, C® e Number of Pallets per 40'High Cube Container 26 and innovative wiring with Q.ANTUM Technology. method B(-1500 V,168 h) V C E SP OW D E ` C tl US Pallet Dimensions(L x W x H) 69.3 in x 45.3 in x 46.9 in _ s See data sheet on rear for further NPPc° (1760mm x 1150mm x 1190mm) information. n•< Pallet Weight 12681bs(575 k ) € THE IDEAL SOLUTION FOR: g NOTE:Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation and use Rooftop arrays on .N ®commercial/industrial of this product. buildings Hanwha Q CELLS America Inc. 300 Spectrum Center Drive,Suite 1250,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL inquiry®us.q-cells.com I WEB www.q-cells.us Engineered in Germany OCELLS CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: AC DISCONNECT UTILITY SERVICE INVERTER , r---------------------------� SOLAR PHOTOVOLTAIC ARRAY(§) L PHOTOV%TAIC BACK-FED CIRCUIT BREAKER IN MAIN ELECTRICAL PANEL IS AN A/C DISCONNECT PER NEC 690.17 DESCRIPTION: CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE 3.78 KW PV ARRAY T 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC., NOR MOUNTING SYSTEM: SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Comp V4 w Flashing—Insert 3.8 KW (AC NAMEPLATE) PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES: THE SALE AND USE OF THE RESPECTIVE (12) Hanwha Q—Cells # Q.Peak DUO BLK—G5/SC315 TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME: PERMISSION OF TESLA INC. SOLAREDGE SE3800H—USOOOBSU4 SITE PLAN PLACARD WEIGHTED TSRF READINGS MP1 : TSRF READINGS: 0-00 N PROPOSED TSRF AVG: 00% EQUIPMENT O PORTION OF SYSTEM: 0 / OOMODULES =00 W E LOCATION MP CALCULATION: (00) x (007.) =.000 MP2 : TSRF S READINGS: 0-00 TSRF AVG: 00% PORTION OF SYSTEM: 0 / OOMODULES = 00 P xx\.\Qs P�5� Front Of House MP CALCULATION: (00 ) x (007.) =.000 MP3 : TSRF READINGS: 0-00 TSRF AVG: 00% (E)DRIVEWAY PORTION OF SYSTEM: 0 / OOMODULES =00 MP CALCULATION: (00) x (007.) =.000 CONADENTIAL- THE INFORMATION HEREIN JOB NUMBER: JB-0103008 00 CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE Mark Glenny 3.78 KW PV ARRAY Erick Arce Montes T 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC., NOR MOUNTING SYSTEM: SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Comp V4 w Metal—Flashing 51 Phillips PI PART TO OTHERS OUTSIDE THE RECIPIENTSORGNorthampton, MA 01060 THE�SALE AND USE OF ITHE�RESPECTIIVEwTM (12) Hanwha Q CELLS # Q.PEAK DUO BLK—G5/SC315 p TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME SHEET: REV: DATE PERMISSION OF TESLA INC' SolarEd a Technologies Ltd. # SE380OH—US r240V1 5082776282 MA TSRF PLAN 1 1 2/10/2020 solar=ee z Iffill solar=ee SolarEdge Power Optimizer - Zep Compatible TM Module Add-On For North America P400-ZEP SolarEdge Power Optimizer - ______ _ --- ----------- P300-ZEP(for 60-cell W nw&des) P400-ZEP(for 72&96-ceN modLdes) INPUT Rated Input DC power(') 300 ....... . .........400..................... .....W...... Zep Compatible Module Add-On Absolute Maximum Input Voltage(Voc at lowest 49 go Vdc temperature) ........................ ............................................... ............................................... .............. For North America P300-ZEP, P400-ZEP MPPTOperatingRange 848 s-8D Vdc ............................ .................................... ............................................... ............................................... .............. — Maximum Short Circuit Current(Isc) 10 10.1 Adc ............................................................. ............................................... ............................................... .............. Maximum DC Input Current12.5 12.63 Adc ............._......... ...................................... ............................................... ............................................... .............. Maximum Efficiency 99.5 % ........................ ............................................................................................ .......... ... µ Weighted Efficiency 98.8 % ............................... . .. .. .......... . .. .. ....... ........... ......... .............. - - Overvottage Category II - - OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) Maximum Output Current ...... 15 Adc . ................. ....................... .. .... ................. ..... ... . . ........ .. ...... .. ..... ... Maximum Output Voltage 60 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) _ Safety Output Voltage per Power Optimizer 1 Vdc STANDARD COMPLIANCE EMC FCC Part15 Gass B,IEC61000-6-2,IEC61000-6-3 ................................................................. ............................................................................................... .............. Safety IEC62109-1(class 11 safety),UL1741 i ...... 1 — RoHSYes INSTALLATION SPECIFICATIONS �1rM6 . Maximum Allowed System Voltage 1000 Vdc ........ . .. .. I. .. .. .. .. ..... .................... ................................. ........... .................... .. .. .. ................. .............. Dimensions including mounting bracket (WxLxH) 128 x 196 x 27.5/5 x 7.71 x 1.08128 x 196 x 35/5 x 7.71 x 1.37 mm/in .......... ...... . ..... ..... .. . .. .. .. .. .. ........... ...............-.............................. ........... ... 128x152 x35/ Dimensions excluding mounting bracket (WXLxFQ 128 x 152 x 27.5/5 x 5.97 x 1.08 mm/in . _. ,.. ..Sx5.97xi.37 Weight(including cables and mounting bracket) 720/1.6 840/1.9 kg/Ib ................................................................. ............................................... ............................................... .............. Input Connector MC4 Compatible ......... ............................................................................................I.. .............. Output Connector Double Insulated;MC4 Compatible Output Wire Length 0.95/3.0 .1...2../..3....9. m/ft ...........___. .._. ..... ......... .... .............. . ................. ............................................... .............. Operating Temperature Range -40-+85/-40-+185 C/'F ................................................................. ............................................................................................... .............. Protection Rating IP68/NEMA 6P ................................................................. ....................................._....__................................................ ............. Relative Humidity.......................................... ............................ ........... 0 100 I % ni gated SrC Power of the module.Module or up to+5%power tolerance allowed. ---—-------- — ---- ------ ---- -.. +p " PV SYSTEM DESIGN USING A SINGLE PHASE THREE PHASE THREE PHASE SOLAREDGE INVERTERL21 HD-WAVE SINGLE PHASE 208V 480V Minimum String Length(Power Optimizers) 8 ; 10 18 Maximum Power per String........................ 5700(6000 with............................ ......................... .....I................... ............. Compatible with Zep Groove framed modules P g p. . ) sE7600H-us s 2s so Maximum String Length(Power 0 timlzers.... ...................�... 2. ....................... ......................... ......................... ............. I ......... .........6000......... .........12750......... . W Certified Zep CompatiblerM bracket - Mitigates all types of module mismatch losses,from ............ - Attaches to module frame without screws-reduces on-roof manufacturing tolerance to partial shading Parallel Strings of Different Lengths or Yes labor and mounting costs - Flexible system design for maximum space utilization Orientations For detailed string siz....._............ing Information refer to:h......._.......ttpJ/www .... .........................-._.._..solaredge.com/sites/default/files/string_sizlrpLna.pd.__........................................_....................... ............. or - Power optimizer equipment grounded through the bracket - Next generation maintenance with module-level monitoring ,,. - Up to 25%more energy - Module-level voltage shutdown for installer and firefighter - Superior efficiency(99.5%) safety CE ON USA-CANADA-GERMANY-ITALY-FRANCE-JAPAN-CHINA-AUSTRALIA-THE NETHERLANDS-UK-ISRAEL-TURKEY-HUNGARY-BELGIUM-ROMANIA-BULGARIA www.solaredge.us r. solar=@@ Single Phase Inverters for North America solar=@@ SE3000H-US/SE380OH-US/SE5000H-US/SE6000H-US/SE760OH-US/ SE100001-1-1-IS/SE1140OH-US -- ---------------- So l a rEd g e Single Phase Inverters OUTPUT SE3000H-US I SE3800H-US_ SE5000H-US j SE6000H-US SE7600H-US SE10000H US SE11400H-US 3800 @240V `- Rated AC Power Output 3000 5000 6000 7600 10000 11400 VA for North America .............rOut................. ........00 3800@240V ......... Max.AC Power Output 3000 5000 6000 7600 10000 11400 VA ... .3300,@208V,, ,,,,,,,,Or,,,, SE3000H-US/ SE380OH-US/ SE5000H-US/ SE6000H-US / AC Output Voltage Min:Nom: - _ _ Vac ............... ................ ................. ................ ................ . SE7600H-US/ SE10000H-US / SE11400H-US r ✓ .11 ./ ✓ r ./ vac At Output Voltage Min.-Nom.- Max. 264)............... ................. ................. ................ . AC Fre uen Nominal 59.3-60-60.5111 „ Hz ...9 m C.o tinu ....1............ ..............:.. ................. ................ ................ ................ ................. Maximum Continuous Output _ 16 24 - - - - A Current 208V . axi'................................ ................. ................. ................ ................ ................ ................. ................. ........... Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A Current240V................... ................. ................. ................ ................ ................ ................. ................. ........... GFDI Threshold1 A ri.M..o.. ... ..... g... j.......................................................................................................................... . Utili ni.torin...g,.s Ilam IF) '"rerfe� Protection,Country Configurable _i Yes Thresholds - _--------------------- INPUT -- -INPUT Maximum DC Power 4650 5900. . 7750 9300 11800 15500 I 17670 W . ...ximu DC, ... ................ ................ ................ ................................... . ......... Transformer-less,Ungrounded I Yes........................................................... ........... ...................................................... Maximum In ut Volta a „480 Vdc Nominal DC!n lnInput Voltage 380 400 „-VdC. Maximum Input Current 240V..... .......8.5..... 10.5.... 13.5.... 16.5.... 20.... 27...... 30.5.... Adc... I........:......::1:.....::::....::1:..............: ::............::I::..............:I::............... ........... !!! Max.In ut Short Circuit Current45 Adc .... ....................... ...... ..................... Polarit Reverse- y Protection ...........Yes ................... ........... Ground-Fault Isolation Detection 600ka Sensitivity AMaximum Inverter Efficiency....... .... 99 9?:2 %..... CEC Weighted Efficiency............ 9P. ??..... ...................................I.... .................................................... . Nighttime Power Consumption <2.5 ADDITIONAL FEATURES O Supported Communication Interfaces RS485,Ethernet,Zig Bee(optional),Cellular.(optional) ................................... .................................................................izi....................................................... ........... Revenue Grade Data,ANSI C12.20.. ........................................................Optional......................................................... Rapid Shutdown-NEC 2014 and 2017 690.12 Automatic Rapid Shutdown upon AC Grid Disconnect e STANDARD COMPLIANCE Safety UL3741,UL1741 SA,UL3699B,CSA C22.2,Canadian AFCI according to.T.LL M- 07... .Grid Connection Standards ............ . . Emissions FCC Part 15 Class 8 INSTALLATION SPECIFICATIONS AC Output Conduit Size/AWG 3/4"minimum/20-4 AWG Range................................ ...................................................................................... ........................ .......... ........... 3/4 DC Input Conduit Size/#of Strings I 3/4"minimum/1-3 strings/ "minimum/1-2 strings/14-6 AWG AWG Rang@........................ ...................................................................................... . 14-6AWG . ................. ........... Dimensions with Safety Switch 21.3 x 14.6 21.3 x 14.6 Optimized installation with HD-Wave technology (HxWxD) 17.7 x 14.6 x 6.8/450x370x174 x7.7/540x x7.3/S40x in/mm - Specifically designed owero optimizers 370-x17.6 .-,370,x,185,,, ,,,,,,,, ,, P Y g P P 1Neight with Sa ,Switch... .. . ..............22..30,,,,,,_,.... 25.1/.11.4... ... 26.2/11.9 38.8 17.6 „40.1%18:2 ..Ib/kg - Record-breaking efficiency Noise <25 <50 dam► ........................................ ..................................................................... .......................................... ........... - Fixed voltage inverter for longer strings Cooling Natural Convection Natural convection and internal fan(user ..................................... ..................................................................... ...................replaceable). - Integrated arc fault protection and rapid shutdown for NEC 2014 and 2017,per article 690.11 and 690.12 operating Temperature Range „,,,,,,,,,,,,,-13to+140/-z5 to+6DN1(4o F/ 4o•Coptionp5l 'F�`c.. UL1741 SA certified,for CPUC Rule 21 grid compliance Froiection Rating NEMA 3R(irnrerterwlth safetyswrtcnj Isi For other regional settings please contact SolarEdge support Extremely small �� Forpower Re-nue r ace de_.ting terinformation P/Nrmatiomefer to:ht1NNC2 iq For power de-rating information refer to:https://www.solaredge.com/zites/defauk/files/se-temperature-derating-note-na.pdf - High reliability without any electrolytic capacitors si-40wmionP/N:SEn 14-us000NNU4 - Built-in module-level monitoring 11111111111 VI - Outdoor and indoor installation wave - Optional:Revenue grade data,ANSI C12.20 Class 0.5(0.5%accuracy) - Simple configuration and commissioning with smartphone app and built in Wi-Fi(SE10000H-US,SE11400H-US) rfrON IRRoHS USA-CANADA-GERMANY-UK-ITALY-THE NETHERLANDS-IAPAN-CHINA-AUSTRALIA-ISRAEL-FRANCE-BELGIUM-TURKEY-INDIA-BULGARIA-ROMANIA-HUNGARY-SWEDEN- www.solaredge.us ologo,OPTIMIZED B SOUTH AFRICA-POLAND-CZECH REPUBLICare trademarks or registered trademarks, Technologies. are lmdamwks of their res pech,e o,ne,,.Dale: