Loading...
35-285 (11) 28 SYLVAN LN BP-2020-0761 GIS#: COMMONWEALTH OF MASSACHUSETTS Ma:Block: 35-285 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING P E RM I T Permit# BP-2020-0761 Project# JS-2020-001314 Est.Cost: $28360.00 Fee:$75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: REVOLUSUN 062112 Lot Size(sq. ft.): 33279.84 Owner: LEVAY BRADLEY J tonin : Applicant. REVOLUSUN AT. 28 SYLVAN LN Applicant Address: Phone: Insnranc e: 1 NORTH AVE SUITE A (781) 270-6555 WC BURLINGTONMA01803 ISSUED ON:12/30/2019 0:00:00 TO PERFORM THE FOLLOWING WORK.-ROOFTOP SOLAR ARRAY-26 PANELS, 8.84 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeTvpe: Date Paid: Amount: Building 12/30/2019 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner DocuSign Envelope ID:E6E5D335-5674-4F3C-839F-580D3DB8146D r Department use only City of Northampton Status of Permit: Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability DEC Room 100 Water/WellAvailability 2 6 2019 Orth mpton, MA 01060 Two Sets of Structural Plans ' phone 4 3-5 7-1240 Fax 413-587-1272 Plot/Site Plans DF aF Sull"' ' Other Specify IP/c APPLI " NSTR CT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be com leted by office 28 Sylvan Lane Map Lot�z �� Unit Northampton MA 01062 Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: 28 Sylvan Lane Bradley LEVAY III Northampton MA 01062 NpMql-Mfi4}--d by Current Mailing Address: (413) 320-3303 V Telephone Signa r9A08F73941`5.. 2.2 Authorized Agent: Northeast Solar Services dba Revolusun 1 North Avenue,Suite A,Burlington,MA 01803 Name in Current Mailing Address: (781) 270-6555 louis.yarid@revolusun.com S natur Telephone Email SECTION 3- IMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $9642.47 (a) Building Permit Fee 2. Electrical (b) Estimated Total Cost of $ 18717.75 Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=0 +2+3+4+5) $28360.22 Check Number ff This Section For Official Use Only Building Permit Number: 1' " f-7 Date Issued: Signature: v0 Building Commissioner/Inspector of Buildings Date DocuSign Envelope ID:E6E5D335-5674-4F3C-839F-580D3DB8146D SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House Addition Replacement Windows Alteration(s) Roofing Or Doors Accessory Bldg. Demolition New Signs [ ] Decks [ ] Siding[ ] Other[X] Solar Photovoltaic Brief Description of Proposed Work: Install Solar array and connect with existing utility. Type: Rooftop Qty. Panels: 26 kW DC: 8.84 Alteration of existing bedroom Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes X No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building:One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION -TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, Bradley LEVAY III as Owner of the subject property hereby authorize Northeast Solar Services dba Revolusun toehalf, in all matters relative to work authorized by this building permit application. rzoz ( V 111 12/11/2019 Si t�Q§GId@tFe... Date I, Louis Yarid of Northeast Solar Services dba Revolusun as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Louis Yarid Print 71— 12/11/2019 ignatu f er/A nt Date DocuSign Envelope ID:E6E5D335-5674-4F3C-839F-580D3DB8146D SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Joseph Vaccaro CS-062112 (U) License Number 16 Sunnyside Avenue,Winthrop,MA 02152 1/23/2020 Address Expiration Date 781 281-6012 Si at Telephone 9.Reaistered Home Improvement Contractor: Not Applicable ❑ Northeast Solar Services dba Revolusun 178137 Company Name Registration Number 1 North Avenue,Suite,A, Burlington,MA 01803 3/16/2020 Addre Expiration Date Q —J Telephone (781) 270-6555 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... ® No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature The Commonwealth of Massachusetts Department of IndustrialAccidents I Congress Street,Suite 100 Boston,MA 02114-2017 www mass gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name(Business/Organization/IndividuW): Northeast Solar Services dba Revolusun Address: 1 North Avenue,Suite A City/State/Zip: Burlington,MA 01803 Phone#: (781)270-6555 Are you an employer?Check the appropriate box: Type of project(required): 1.nXX I am a employer with 25 employees(full and/or part-time).' 7. ❑ New construction 2.❑I am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 9. El Demolition 3.❑I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 10❑Building addition 4.E]I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.[]Electrical repairs or additions proprietors with no employees. 12.E]Plumbing repairs or additions 5.E]I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.E]Roof repairs These sub-contractors have employees and have workers'comp.insurance.: 6.❑we are a corporation and its officers have exercised their right of exemption per MGL c. 14. X❑Other Solar Photovoltaic 152,§1(4),and we have no employees.[No workers'comp.insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and joh site information. Insurance Company Name: American Zurich Insurance Company Policy#or Self-ins.Lic.#: UB-7H836175-18 Expiration Date: 12/31/2019 Job Site Address: 28 Sylvan Lane City/State/Zip: Northampton MA 01062 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains3apoenalties ofperjury that the information provided above is true and correct Signature: s-11 Date: 12/11/2019 Phone#: ( 1)270-6555 Official use only. Do not write in this area,to be completed hv ciry or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: Client#: 103503 NORTHSOL DATE(MM/DD/YYYY) ACORD.. CERTIFICATE OF LIABILITY INSURANCE 11/08/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder Is an ADDITIONAL INSURED,the policy(les)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAMEACT Lauren Luke Starkweather&Shepley(WW) PHONE 781 320-9660 A/C No Etd, (A�,N,): 401-431-9635 Insurance Corp.of MA ADDRESS: Iluke@starshep.com PO Box 549 INSURER(S)AFFORDING COVERAGE NAIC# Providence,RI 02901-0549 INSURER A:Employers Mutual Ins 21415 INSURED INSURER B: Northeast Solar Services Inc. INSURER C: 1 North Ave Ste A Burlington,MA 01803 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IN RR TYPE OF INSURANCE INSR WVD POLICY NUMBER POLICY EFF POLICY EXP LIMITS A X COMMERCIAL GENERAL LIABILITY 5D5865319 2/31/2018 12/31/2019 pEAACCH�GOECTCURppRENCE $1000000 CLAIMS-MADE 51OCCUR PREMISES EaE=rrence $500,000 MED EXP(Any one person) $10,000 PERSONAL&ADV INJURY $1,000,000 GEML AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE s2 OOO,OOO PRO. POLICY F_X1 JET LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: $ A AUTOMOBILE LIABILITY 5Z5865319 2/31/2018 12/31/201 E.MBa INeDtSINGLELIMIT 1,000,000 ANY AUTO BODILY INJURY(Per person) $ OWNEDIx SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ X AUTOS ONLY AUTOS ONLY Per accident $ A X UMBRELLA LIAB X OCCUR 5J5865319 2/31/2018 12131/2019 EACH OCCURRENCE s5,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $5,000,000 DED I X I RETENTION$10000 $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y/N ANY PROPRIEfOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ OFFICERIMEMBEREXCLUDED? N/A (Mandatory in NH) E.L.DISEASE-FA EMPLOYEE $ It yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,maybe attached if more space is required) dba Revolusun Re:28 Sylvan Lane, Northampton, MA 01062. CERTIFICATE HOLDER CANCELLATION City of Northampton SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE y p THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 212 Main Street ACCORDANCE WITH THE POLICY PROVISIONS. Northampton, MA 01060 AUTHORIZED REPRESENTATIVE @ 1988-2015 ACORD CORPORATION.All rights reserved. ACORD 25(2016/03) 1 of 1 The ACORD name and logo are registered marks of ACORD #S1395361/M1227352 PAT3 �� • CERTIFICATE OF LIABILITY INSURANCE DA1111112019 TE IMM/DD/YYYY► TNAS.CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE R PRODUCER.AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require and endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: STARKWEATHER&SHEPLEY PHONE FAX 60 CATAMORE BLVD (AIC,No,Ext): (A/C,No): E-MAIL EAST PROVIDENCE,RI 02914-1206 ADDRESS: 22HHX INSURER(S)AFFORDING COVERAGE NAIC# INSURED INSURER A: AMERICAN ZURICH INSURANCE COMPANY NORTHEAST SOLAR SERVICES INC INSURER B: INSURER C: INSURER D: 1 NORTH AVENUE SUITE A&B INSURER E: BURLINGTON,MA 01803 INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR %DDL,UBR POLICY EFF DATE POLICY EXP DATE LTR TYPE OF INSURANCE INSR WVD POLICY NUMBER (MMt)DIYYYY) (MMIDD%YYYY) LIMITS GENERAL LIABILITY EACH OCCURRENCE $ COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $ CLAIMS MADE 0 OCCUR. PREMISES(Ea occurrence) ED EXP(Any one person) $ ERSONAL&ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: ENERAL AGGREGATE $ POLICY D PROJECT [::]LOC RODUCTS-COMP/OP AGG $ AUTOMOBILE LIABILITY COMBINED SINGLE $ ANY AUTO LIMIT(Ea accident) ALL OWNED AUTOS BODILY INJURY $ SCHEDULE AUTOS (Per person) HIRED AUTOS BODILY INJURY $ (Per accident) NON-OWNED AUTOS PROPERTY DAMAGE $ (Per accident) UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DEDUCTIBLE $ RETENTION $ $ A WORKER'S COMPENSATION AND X WC STATUTORY OTHER EMPLOYER'S LIABILITY YIN UB-7H836175-18 12/31/2018 12/31/2019 LIMITS ANY PROPERITOR/PARTNER/EXECUTIVE N/A E.L.EACH ACCIDENT $ 11000,000 OFFICER/MEMBER EXCLUDED? El (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describeunder DESCRIPTIIPTIONN OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLESIRESTRICTIONS/SPECIAL ITEMS THIS REPLACES ANY PRIOR CERTIFICATE ISSUED TO THE CERTIFICATE HOLDER AFFECTING WORKERS COMP COVERAGE. CERTIFICATE HOLDER CANCELLATION CITY OF NORTHAMPTON SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED 212 MAIN ST., BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRl;= '$� �.� NORTHAMPTON,MA 01060 ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD 1988-2010 ACORD CORPORATION. All rights reserved. DEBRIS AFFIDAVIT As a result of the provisions of MGL C. 40, § 54, 1 acknowledge that as a condition of this Building Permit, all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL C. 111, § 150A. I certify that I will notify the Building Commissioner of any change in the location of the solid waste disposal facility to be used within 72 hours. 12/11/2019 l� Date Si ature of Permit Applicant Print or type the following information: Joseph Vaccaro Name of Permit Applicant Northeast Solar Services (dba Revolusun) Firm Name (if applicable) 1 North Avenue, Suite A, Burlington, MA 01803 Address The debris will be disposed of: Casella Waste Systems, Inc. Facility 24 Bunker Hill Industrial Park, Boston, MA 02129 Address Northeast Solar Services (dba Revolusun) will be removing debris from the work site daily, and utilizing the disposal service at our headquarters. OYXe Office of Consumer Affairs and Business Regulation One Ashburton Place- Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Type: Supplement Card Registration: 178137 NORTHEAST SOLAR SERVICES INC. _ Expiration: 03/16/2020 D/B/A REVOLUSUN 1 NORTH AVE.SUITE A BURLINGTON,MA 01803 ,a.,. ,fie • Update Address and Return Card. SCA 1 O 20M�-0611(77 -'//!v {['ONt ilrnrtnM?�/�i n/�'/�n.ila�rul✓/• office of Consumer Affairs 8 Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:SUpOlernent Card before the expiration date. If found return to: Registration gxlLiration Office of Consumer Affairs and Business Regulation 178137 03/16/2020 One Ashburton Place-Suite 1301 NORTHEAST SOLAR SEHVICES INC. Boston,MA 02108 D/B/A REVOLUSUN LOUIS YARID 1 NORTH AVE.SUITE A it lid without signature BURLINGTON,MA 01803 Undersecretary ® Commonwealth Division of Prot-- Board of Budding RegL, Construction 5 CS-062112 Expires:01 212020 JOSEPH W VACCARO - 16 SUNNYSIDE AVE WNTHROP MA 02152 Commissioner �DocuSign Envelope ID:E6E5D335-5674-4F3C-839F-580D3DB8146D REVOLU�SUN a THIS HOME IMPROVEMENT SOLAR ENERGY CONTRACT(this"Contract")IS BETWEEN:Bradley Levay III("Client")located at 28 Sylvan Ln Northampton,MA 01062("Client's Property") -AND- Northeast Solar Services,Inc.®("Contractor")of 1 North Ave Suite A Burlington,MA 01803,with Home Improvement Contractor Reg.No.178137,which expires on March 16,2020,and Federal Employer ID 46 0569853.Contractor's Project Developer for this contract is Richie Bonney. The parties to this Agreement agree as follows: I.SCOPE OF WORK A.Installation of PV System.The above Client(s)has engaged Contractor to perform the following residential contracting work(the"Work")in connection with the installation of the following photovoltaic solar energy system(the"PV System"): 26 Panasonic-Panasonic N340 watt modules(or equivalent) with 1 Solar Edge-SolarEdge SE 7600H inverters(or equivalent)and all mounting, disconnects,and all other PV System components necessary for a National Electric Code compliant PV System,totaling 8.84kW,located at Client's Property. B.Other Inclusions The Work shall further include: •Installation of the PV System in accordance with all State of Massachusetts interconnection standards. •All reasonable engineering and permitting costs. •The following building permits are required and will be secured by Contractor as Client's agent:Building and Electrical Permit. •Client authorizes the contractor to procure any and all interconnection documents required by the utility. •Following the installation,Client will receive a PV System orientation and a PV System Client's manual. •Notice: It shall be the obligation of the Contractor to obtain all permits related to the Work. Clients who secure their own permits will be excluded from the guarantee fund provisions of Chapter 142A of the Massachusetts General Laws. It.COMPENSATION AND SCHEDULE A.Contract Price For Contractor's performance of the Work under this Contract,Client will pay Contractor a total of: $28,360.22(TWENTY EIGHT THOUSAND THREE HUNDRED SIXTY AND 22/100)DOLLARS USD(the"Contract Price"). B.Payment Schedule The Contract Price will be payable in accordance with the following payment schedule: Date Paid: $14.180.11 Initial Payment-50% (Due upon Contract signing,which is an amount less than the cost of the materials and equipment which must be specially ordered in advance of commencement of PV System installation) $12.762.09 Progress Payment-45% (Due upon Substantial Completion) $1.418.02 Final Payment-5% (Due upon Final Completion) C.Schedule The"Start Date"of this Contract is the date Contractor receives the full amount of Client's initial payment of 50%of the Contract Price. Subject to adjustment for any Force Majeure reason stated in Section IV.J.,the Work is estimated to begin within 12-16 weeks from the Start Date of this Contract.The parties agree that this date shall be automatically extended to the date of delivery of all materials and equipment which must be specially ordered. Substantial Completion is estimated to occur within 16-20 weeks from the Start Date of this Contract,but the parties agree that this date shall be automatically shortened or extended to the date on which all racking and electrical work are complete and the PV System is capable of generating power and ready and available for use subject to final government and utility approval. Final Com l� is defined as the date on which all punch list items are complete,all permits are closed,all other government and utility approvals are obtained and the Work is complete to the satisfaction of Contractor and Client. Client acknowledges and agrees that the Work involves permits,inspections and approvals from various government agencies and utilities,and therefore the timing of the Work may vary and is not within Contractor's control. Client further agrees that Contractor shall not be liable for any losses, costs or damages related to any delays for reasons beyond Contractor's control,including all causes noted in the Force Majeure section of this Contract below. ***3rd party Financing:Should the Client obtain financing from a 3rd party which is approved by the Contractor,the payment terms of the lender will apply.A$500.00 deposit paid by the client is required for all 3rd party financing options. 1 Northeast Solar 1 North Ave Suite A Burlington,MA 01803 OpRevoluSunxom 781.240.6555 158766 V425 10/31/1019 t DocuSign Envelope ID:E6E5D335-5674-4F3C-839F-580D3DB8146D REVOLU(SUN III.IMPORTANT NOTICES A.Contractor's Registration: All home improvement contractors and subcontractors engaged in home improvement contracting,unless specifically exempt from registration by provisions of Chapter 142A of the Massachusetts General Laws,must be registered with the Commonwealth of Massachusetts. Inquiries about registration and status should be made to the Director of the following state agency: Office of Consumer Affairs and Business Regulation Home Improvement Contractor Registration Ten Park Plaza,Room 5170 Boston,MA 02116 (617)973-8700 B.Client's Cancellation Rights: Client may cancel this Contract,without penalty or obligation,within three business days following the date on which Client signs this Contract. A Notice of Cancellation is attached hereto for Client's convenience. C.Warranties:For a period of ten(10)years from Substantial Completion,Contractor warrants that the PV System has been designed and installed in a good,workmanlike and substantial manner in accordance with all applicable building codes. In the event Contractor is required to penetrate the roof of the Client's property in the course of installation,and causes damage to the roof within a three (3)inch radius of a penetration,Contractor will repair such roof damage for a period of twenty(20)years from Substantial Completion or the remaining term of the roofs existing installation warranty,whichever is shorter,to prevent any water,rain or other moisture leak,seepage or entry directly caused by such penetration.These warranties are for normal use and conditions only.All warranty coverage to equipment and workmanship installed by Contractor will be VOID if any alterations or repairs are performed by any person or persons not expressly authorized,in writing,by Contractor.THIS WARRANTY DOES NOT COVER:(a)Damage caused by external forces such as,but not limited to,vandalism,theft,terrorism,fire or act of God;(b)Damage caused by weather effects exceeding manufacturer tolerances;(c)Normal wear and tear or aging of a PV System;(d)Any implied warranties:(e)Electric bills, water damages or any other consequential damages;or(f)Damage to the PV System or its efficiency due to adjustment,moving,or tampering with the PV System or any of its components by individuals not approved by Contractor. D.Change Orders: Any alteration or deviation from above specifications involving extra costs must be subject to a written change order signed by both parties,which shall be incorporated into this Contract,and Client shall be liable for any additional costs resulting from each change order. By initialing the space below,Client hereby specifically agrees to execute a change order,and pay the additional costs,if it becomes necessary for Contractor to repair or replace un-approved or non-code compliant electrical work in order to complete the PV System installation and satisfy code requirements. In the event the Contractor is required to dig a trench or footings,the Client agrees to pay the additional labor and materials costs if large and/or excessive rocks need to be removed and cause delays in the time required to complete the trench.If the presence of rocks prevents the driving of ground mount posts,the Client agrees to pay the additional costs incurred by the Contractor for concrete footings.All rocks uncovered during excavation will remain on the Clients'Propeq.The cost of such work is agreed to be on a time and material basis. Client's Initials: l" Client's Initials: ARBITRATION: CONTRACTOR AND CLIENT HEREBY MUTUALLY AGREE IN ADVANCE THAT IN THE EVENT CONTRACTOR HAS A DISPUTE CONCERNING THIS CONTRACT,THE CONTRACTOR MAY SUBMIT SUCH DISPUTE TO A PRIVATE ARBITRATION SERVICE WHICH HAS BEEN APPROVED BY THE DIRECTOR OF THE EXECUTIVE OFFICE OF CONSUMER AFFAIRS AND BUSINESS REGULATIONS AND CLIENT SHALL BE REQ IT TO SUCH ARBITRATION AS PROVIDED IN M.G.L.c.142A. 10/31/2019 ClieDate: Clie Date: Contractor: Date: 107 3112019 seSWAzecFa 5_ NOTICE: The signatures of the parties above apply only to the agreement of the parties to alternate dispute resolution initiated by Contractor. Client may initiate alternate dispute resolution even where this section is not separately signed by the parties. E.Incentive Guarantee: By Client's initials below,Client acknowledges and agrees that Contractor has not and does not guarantee Client's qualification for,receipt of or amount of any tax credit,rebate or other incentive amount in connection with the PV System,and any estimates of incentives(whether in a PV System proposal or otherwise)are not guaranteed to be accurate or available. Client is responsible for determining Client's and/or the PV System's eligibility for any incentives and should consult with tax,legal and other advisors regarding availability and possible tax consequences of claiming the same. Ire, Client's Initials:l�� Client's Initials: 2 Northeast Solar 1 North Ave Suite A Burlington,MA 01803 OoRevoluSunxom 781.240.6555 158786 V425 10/37/20 19 DocuSign Envelope ID:E6E5D335-5674-4F3C-839F-580D3DB8146D REVOLU(' IV OTHER TERMS AND CONDITIONS A.Access: To enable Contractor to perform its Work hereunder,Client shall grant during daylight hours adequate space on Client's property,as mutually designated by Contractor and Client,for the complete and proper installation,operation,maintenance and repair of the PV System as well as rights of ingress and egress to,through and from such property and the space designated for the PV System. B.Scarcity of Materials:Rights of Termination: The PV System components to be obtained under this Contract are scarce commodities.If,due to code requirements,equipment substitution,final engineering,space availability,etc.,the size of a PV System decreases,Contractor shall re-calculate the Contract Price using its standard pricing method and the Contract Price shall be automatically reduced.Client shall be credited by the reduced amount. If due to substitution the DC STC size of the PV System increases slightly,then Client shall not have to pay Contractor similarly. Contractor shall make every reasonable effort to ensure that PV System size does not decrease from the specifications. If the DC STC size of the PV System decreases more than 15%from the Contract's specification amount for any of the reasons stated in this paragraph,Client shall have the right to terminate this Contract within ten(10)days of Contractor's written notification to Client of such decrease,and Contractor shall then refund in full all funds paid to date under this Contract,but shall have no other liability to Client. Contractor reserves the right to unilaterally terminate this Contract within 45 days of its approval without any liability to Client if any of the PV System components required for the completion of Contractor's Work in a timely manner are not available. In the event of such termination,Contractor shall refund all monies paid by Client to Contractor as of the date of termination. C.Limitation of Liability:In no event shall Contractor be liable in an amount exceeding the compensation paid by Client to Contractor under this Contract. Contractor shall not be liable for any incidental,consequential or special damages or for economic loss or expense of for loss or profits or income of Client,or Client's consultants or agents or employees,or any of them,including but not limited to any electricity costs incurred should installation of the PV System be delayed beyond the commencement or completion schedule set forth above. D.Zoning:Client shall pay for all variances,special permits,or other costs related to zoning,including without limitation any fees or costs related to attorneys or engineers. E.Client's Property:Client agrees to remove or to protect any of Client's personal property,inside or out,which may interfere with or obstruct the Work, including but not limited to landscaping,and Contractor shall not be held responsible for damage to such property. Client understands and acknowledges that proper operation of the PV System purchased hereunder is dependent on Client's existing roof and equipment and Contractor shall have no obligation or liability for the condition thereof,or any other part of Client's improvements or equipment not purchased hereunder. Client expressly represents that the roof of the property upon which the PV System will be installed is in good condition,with no known water infiltration problems or other structural defects. F.Insurance:Client must carry all fire,casualty,hurricane,earthquake,theft,and other insurance related to Client's real and personal property. G.Cancellation of Contract: If Client cancels or breaches this Contract after the opportunity to execute three(3)day rescission has passed but before commencement of construction,Client shall pay Contractor the amount of expenses incurred to that date plus 20%of the Contract Price. If Client fails to pay said amounts within thirty(30)days of Contractor's demand for payment and Contractor files suit,Contractor shall be entitled to recover all of its damages including its loss of net profits and attomeys'fees and costs if Contractor is the prevailing party. H.Costs of Collection: If Client fails to pay any amounts owed to Contractor when due,Client shall be liable for all costs of collection,including reasonable attomeys'fees,plus 18%interest per annum on the unpaid balance. Contractor also shall have option of removing all or part of the PV System from Client's premises in addition to receiving payment equal to the value of the unpaid balance to cover all or a portion of Contractor's consequential damages. I.Liens:Contractor,any subcontractor(s)and any other persons or entities supplying labor and materials to Client under this Contract,have the right under applicable law to impose a lien on Client's real property for the value of the labor or materials provided. Upon Client's payment of all amounts due under this Contract,Contractor will provide,upon Client's request,a release and waiver of any liens. J.Force Maieure:Contractor shall not be liable for any delay in material and/or equipment delivery or for failure to deliver or failure to perform the Work which results from any cause beyond the Contractor's control. Such causes include but shall not be limited to:an act of God or of the public enemy;an act(or failure to act)of any government or utility;a fire,flood or epidemic;quarantine,restriction,strike,freight embargo,terrorism,theft or unusually severe weather;Contractor's inability to obtain necessary materials,labor or transportation;custom permitting caused by Client's site conditions; homeowner association review or approval;building or other code requirements relating to Client's existing electrical system or building characteristics; and any other impediments to the installation of the PV System arising from Client's acts or omissions and/or the condition of Client's property. 3 Northeast Solar 1 North Ave Suite A Burlington,MA 01803 OpRevoluSun.ftcom 781.240.6555 158766 w25 100112o19 DocuSign Envelope ID:E6E5D335-5674-4F3C-839F-580D3DB8146D REVOLU(SUN K.Legal Compliance and Severability:Contractor and Client acknowledge that the form,substance,content and notices contained in this Contract are intended to comply with Chapter 142A of the Massachusetts General Laws,and regulations promulgated thereunder. In the event of any instance of non- compliance,only such portion shall be invalid and the remainder of this Contract shall be in full force and effect. In addition,any such portion not in compliance shall be read and interpreted so as to have its intended meaning to the maximum extent allowed under such law and applicable regulations. L.Entire Contract:No Waiver Unless In Writing:This Contract constitutes the entire contract between the parties;there is no representation,warranty, collateral contract or condition affecting this Contract except as expressed in it. No provisions of this Contract shall be changed or modified,nor shall this Contract be discharged or waived,in whole or part,except in writing signed by both parties.This Contract shall not be effective until fully executed by Client and an Authorized Representative of Contractor. M.Client's Representation of Authority_:If this Contract is signed by less than all of the persons or entities who own the subject property,then Client who signs this Contract(or any of the provisions hereof)represents to Contractor that he,she or it has full legal authority to bind the other persons and/or entities. N.Governing Law:The laws of the Commonwealth of Massachusetts shall govern any proceeding or dispute related to this Contract. O.Production Gap Guarantee:This production guarantee covers 90%of estimated production(9,502.15 kWhs)in year one(1)and decreases at.5%of year one(1)production each year for a total term of twenty-five years(25).This guarantee is determined on an annual basis and payments are made when the aggregate system production falls below total cumulative production estimated.Payments will be made at the end of each anniversary of the system's in service date of interconnection and based on the retail rate at the time of interconnection.Payment will be made within 30 days of the Client's request of payment.Production Gap Guarantee is void if site conditions and solar access change after the date of interconnection. Client's Initials: Client's Initials: oocasgosa by by: Client: Ett �V M Contractor: f bwal Bradley Levay III Name: Matthew R Powers Date: 10/31/2019 Title: CEO Date: 10/31/2019 C•-„ The Contract is contingent upon the Contractor providing the Client with the Panasonic Enhanced Warranty. Should bx the a Contractor not be able to produce the warranty documentation the Client may cancel at no penalty. onftftft4 Northeast Solar 1 North Ave Suite A Burlington,MA 01803 OoRevoluSunxom 781.240.6555 158766 V425 10/318019 DocuSign Envelope ID:E6E5D335-5674-4F3C-839F-580D3DB8146D REVOLU(SUN NOTICE OF CANCELLATION If you decide that you do not want the goods or services described above,you may cancel this Contract by mailing or delivering a signed and dated copy of the cancellation notice,or any other similar written notice,to Contractor at the address set forth above no later than midnight of the third business day following the date on which you signed this Contract. If you cancel by the date and time indicated,any payment made by you under this Contract will be returned within ten(10)business days following receipt of your cancellation by Contractor,and any security interest arising out of the transaction will be released. If you cancel,you must make available to Contractor,at your residence,in substantially as good condition as when you received,any goods delivered to you under this Contract;or you may,if you wish,comply with Contractor's written instructions regarding the return shipment of the goods at Contractor's risk and expense. If you fail to make the goods available to Contractor,or if you agree to return the goods to Contractor and fail to do so,then you remain liable for performance of all obligations under this Contract. If we do not pick up,or attempt to pick up,the goods within 20 days of the date of your notice of cancellation,you may retain or dispose of them without further obligation. I HEREBY CANCEL THIS TRANSACTION: DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES. Client's Signature(sign here only if you wish to Date cancel this transaction) Client's Signature sign here only it you wish o Date cancel this transaction) CLIENT ACKNOWLEDGES RECEIPT OF ORIGINAL OF THIS CANCELLATION FORM: OmuSigmd by: �I' 10/31/2019 Aqua�SUf�BANE 7394US Date Signature Date 5 Northeast Solar 1 North Ave Suite A Burlington,MA 01803 OpRevoluSun.Mom 781.240.6555 158766 V425 10f31/1019 PROJECT DESCRIPTION: ROOF DESCRIPTIONSHEETINDEX 26x340W ROOF MOUNTED SOLAR ROOF � PROJECT MANAGER V PV-1 SITE PLAN&VICINITY MAP ROOF AZIMUTH PV-2 ROOF PLAN&MODULES UW CLIFFORD PHOTOVOLTAIC MODULES TILT PV-3 MOUNTING DETAIL&P.O.0 DETAIL SYSTEM SIZE: 8.84 kW DC STC aM 10' 70' PV-4 ELECTRIC LINE DIAGRAM& ARRAY LOCATION EQUIPMENT SUMMARY WIRING CALCULATIONS 26 PANASONIC:VBHN340SA17 MODULES 02 40' 1W PV-5 PLACARDS M REVISIONS 01 SOLAREDGE SE760OH-US(240)INVERTER 03 40, M. PV-6 LAYOUT MAP XSCR—M MSE IISV PV-7 MODULE DATA SHEET j M 40. M. PV-8 INVERTER DATA SHEET ` PV-9 OPTIMIZER DATA SHEET I PV-10 RAIL DATA SHEET PV-11 ATTACHMENT DATA SHEET REVOLU f I \ CONTRACTOR INFORMATION � I I ` EVOLUSUN MASSACHUSETTS! \ mtmeeeb�"u"f/.me.mti t' �p"a�crim�.aremmc� � ���atnuaraR, O � _ w�wM^nE usurr.mrM.0 I (E)POOL n � DATE:111082019 PROJECT NAME BRADLEY LEVAY III ROOF#3 i HOUSE PHOTO 26 SYLVAN LN (07)PANASONIC: / NORTHAMPTON,MA 01052 VBHN340SA17 PHONE: ROOF#4 / 6CALE:NTS -- '/ EMAIL: (05)PANASONIC: 85'-7" — - JOBA MA02-20-0025 VBHN340SA17 2-STORY APN NO:— ' _ HOUSE ROOF#1PROJECT MAIL LU (06)PANASONIC: PROJECT SITE -- S.8{KW STC Z — VBHN340SA17 -J 33'-7" T.eXwAc } (E)MAIN SERVICE/ OQ� ENGINEERING APPROVAL PANEL W Q aOROOF#2 / Q� I (08)PANASONIC: s VBHN340SA17 �^ W EXISTING 40 U) I DRIVEWAY ����ZH OF 414Se026 Sylvan Lane N O? JAMES A.''NNyG 11/20/2019 O? ADAMS STRUCTURAL ?� N No.49748 Eruc ural Review / \v, �sroNA020 LE� Structural Rwiaw BHEETNAM and Approval Only �srE PLAN& For penetration spacing and additional VICINITY MAP X36.95' n88.60'FRONT PROPERTY LINE attachment information see sheet 5-1 SHEET SIZE SYLVAN LN GOVERNING CODES ANSI B SITE OCCUPANCY ECATEGORY:SI 2017 NATIONAL 0 CMR,8th EDITION VICINITY MAP ELECTICAL CODE 11 11 X'17° 1 SITE PLAN WITH ROOF PLAN DESIGN WIND SPEED:117MPH UNDERWRITERS LABORATORIES(UL) SCALE:NTS SHEET NUMBER EXPOSURE CATEGORY:C STANDARDS PV-1 SCALE:M2"=1'-0' GROUND SNOW LOAD:40 PSF OSHA 29 CFR 1910.269 PV-1 LOAD CALCULATION PROJECT MANAGER MODULE TYPE,DIMENSIONS&WEIGHT N OF 14OJIAN CLIFFORD MODULE TYPE=PANASONIC:VBHN340SA17 ? h 11/20/2019 MODULE WEIGHT=40.81 LBS ?� JAMES A. G TOTAL 0 OF PANELS 28 ADAMS MODULE DIMENSIONS=62.6"x 41.5"=18.04 SF STRUCTURAL ^�,+L3.'�:X.n�_— AREA COVERED(SO.FT.) 489.04 ROOF DESCRIPTION 9No.49748 AVG.LOAD PER CONNECTION POINT(LBS) 18,78 REVISIONS ROOF TYPE-COMP SHINGLE ROOF o/STEPS Expir.06/30/2020 WEIGHT PER SO.FT.OF SOLAR ARRAY TOTAL ROOF AREA=1240.43 /ONAL Structural RevlaW (PSF) 2.50 and Approval Only TOTAL WEIGHT OF MODULES 1051.06 469.04/1240.43=38%OF ROOF PP Y FACE AREA COVERED BY ARRAY (E) BACK YARD For penetration spacing and additional TOTAL WEIGHT OF OPTIMIZERS 54.00 attachment information see sheet 5-1 TOTAL WEIGHT OF RACKING COMPONENTS 57.30 REVOLU�:UM TOTAL SYSTEM WEIGHT(LBS) 1172.98 Installers to verify rafter size,spacing and unsupported spans, TOTAL RAIL LENGTH(FT.) 117 and notify E.O.R.of any discrepancies before proceeding. 90 S,OF I T-17 CR-48 SHARED RAILS(188 18 TOTAL RAIL LENGTH FIELD OM 221.33 - PIPE ON ROOF(BACKSIDE) #OF CR48 RAIL SPLICES 5 CONTRACTOR INFORMATION ROOF#4 TOTAL#OF END-CLAMPS4 EVOLUSUN MASSACHUSETTS TILT-40• 2'-0" W" AZIM.-250° --10'-6" '-7" TOTAL#OF L-FOOT ASSEMBLIES 70 "oar" .Ga u REc mem ROOF#1 DATE:11/08/!010 -- _-- TILTPROJECT NAME . 70' F. BRADLEY LEVAY III ---- -- ----- ---------- _ MPTORMA01002 _ NORTHAPHONE: EMAIL: _________________ JOBt.MA02-20-0028 -- --- - APN NO:— o --- ---- __ WRING INArnc -- --- --- -------- ci -- 0 ED b ---- -- --- 7 ---- ----- ---- ----- --- -- ------- o b PROJECT DETAIL ---- --- ----- -- ----- --- -- -- ----- --- --- ------- • 8.84IKWSTC w ---- --- --- --- ----- -- -- -------------------------- 7.6 KW AC 11I -_--_--- ---_-_---_- ------ 7K �L ENGINEERING APPROVAL I ________ _______ IN)JUNCTION BOX 4 ' " -------- SIDEWALL RUN -- (N)SOLAREDGE SE76WH-US ------ (240)INVERTER I I I I __ ________ ______ (N)AC DISCONNECT m ROOF#a m i i i 1 -------------------- - (N)SMART METER N TILT-40° I ----------------- - -------- ----- (N)AC DISCONNECT AZIM.-250° I I I I ____ _____ (E)UTILITY METER ROOF#2 I PANASONIC: TILT-40• J�4-11w 1Q$w •-�w -1w -,w �-0 ,$w dD VBHN340SA17 SHEET NAME AZIM.-1Ba• ROOF PLAN 8r _ 2'-11"2'-4" LEGEND (26)OPTIMIZER MODULES (ROOF#1,#2.#3&#4) (N)LINE SIDE TAP 7 ■ -JUNCTION BOX — — -RAFTER - (70)PVATTACHMENT(ROOF#1,#2,#3&#4) M -UTILITY METER �� -r EMT CONDUIT SHEETSIZE ( SOLAR PANELS (E)200AMP MAIN SERVICE PANEL (N)CR 48 SHARED RAIL TYP. — (ROOF#1,#2,03&#4) � -MAIN SERVICE PANEL o -ROOF OBSTRUCTIONANSI B INV -INVERTER --EXTERIOR CONDUIT Ll 1"X 17" 1 ROOF PLAN &MODULES 2XS RAFTER 016.O.C. -AC DISCONNECT ® -CHIMNEY SHEET NUMBER PV-2 SCALE.1/8"=1-0" (E) FRONT YARD LST -UNE SIDE TAP SM -SMART METER PV-2 CONSTRUCTION NOTES PROJECT MANAGER IAN CLIFFORD 1.) CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO INITIATING CONSTRUCTION. 2.) CONTRACTOR SHALL REVIEW ALL MANUFACTURER INSTALLATION DOCUMENTS PRIOR TO INITIATING CONSTRUCTION. REVISION$ 3.) ALL EQUIPMENT SHALL BE LISTED BY U.L.(OR EQUAL)AND LISTED FOR 1°f10N °Ah "� ITS SPECIFIC APPLICATION. 4.) ALL EQUIPMENT SHALL BE RATED FOR THE ENVIRONMENT IN WHICH IT IS INSTALLED. 5.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE 18"MAX PV MODULE TYR MANUFACTURER'S INSTALLATION INSTRUCTIONS. REVOLU(Sum 6.) ACCESS TO ELECTRICAL COMPONENTS OVER 150 VOLTS TO GROUND 4'-0" - - - RAFTERS SHALL BE RESTRICTED TO QUALIFIED PERSONNEL. 7.) ALL CONDUCTORS SHALL BE COPPER,RATED FOR 600 VOLTS AND 90°C WET ENVIRONMENT,UNLESS OTHERWISE NOTED. —1'-4^ 8.) WHERE SIZES OF JUNCTION BOXES,RACEWAYS,AND CONDUITS ARE NOT SPECIFIED,CONTRACTOR SHALL SIZE THEM ACCORDING TO CONTRACTOR INFORMATION APPLICABLE CODES. EVOLUSUN MASSACHUSETTS 9.) PV MODULE FRAMES SHALL BE BONDED TO RACKING RAIL OR BARE COPPER G.E.C.PER THE MODULE MANUFACTURER'S LISTED INSTRUCTION SHEET. 1' II I III 10) G.E.C.PV MODULE RACKING VIA WEEB LUG,LISCO GBL-4DBAIL SHALL BE TLLAYDEN LUGD TO ,ARE COPPER p�n � OR QUIVLENT LISTED LUG. DATE:11A)SM19 11.) GROUNDING ELECTRODE CONDUCTOR(G.E.C.)SHALL BE CONTINUOUS PROJECT NAME AND/OR IRREVERSIBLY SPLICEDfWELDED. 12.)ALL JUNCTION BOXES,COMBINER BOXES,AND DISCONNECTS SHALL BRADLEY LEVAY III L-FOOT BE INSTALLED IN AN ACCESSIBLE LOCATION. 28 SYLVAN LN FLASHING 13.) ROOF ACCESS POINTS SHALL BE AT A STRONG POINT ON THE NORTHAMPTON,MA01052 BUILDING AND NOT REQUIRE THE PLACEMENT OF LADDERS OVER EXTERIOR PHONE: RACKING RAIL WALL OPENINGS. EMAIL JOBS:MA02-20-002$ 1 MOUNTING PLAN VIEW 14.)WORKING SPACE AROUND ELECTRIAL EQUPMENT SHALL COMPLY WITH APN NO:— NEC 110.26 -- PV-3 SCALE:NTS PROJECT DETAIL 8.84 KW STC SEE(3/PV-3)FOR 7.8 KW AC MID CLAMP ENLARGED VIEW ENGINEERING APPROVAL CR 48 SHARED RAIL EVEREST L-FOOT PV MODULE ALUMINIUM N ROOF6 FLASHING COMPO`'1t1O 16"O G LAG SCREW,HEX (E)COMP HEAD,5/16"X 4", SHINGLE ROOF �F tER 18-SSS (A OFAI4 SHEET NAME JAMES A. ym 11/20/2019 MO & STRUCTURAL - �3 .t.x_ POC DETAIL N0.49748 Expir.06/30/2020 PV QUICKMOUNT STRUCTURAL SCREW, SHEET 6Ig /pNAI ' Structural Review CLASSIC COMP MOUNT QMPV,T-30 HEX ANSI B and Approval Only WASHER HEAD,5/16"X I 1"X 1 7" 2 MOUNTING METHOD For penetration spacing and additional 3 MOUNTING METHOD 4-17',16-8ss $MEET NUMBER PV-3 SCALE:NTS attachment information see sheet 5-1 PV-3 SCALE:NTS PV-3 r ARRAY CONFIGURATION PV MODULE SPECIFICATIONS INVERTER SPECIFICATIONS POWER OPTIMIZER SPECIFICATIONS WIRE AND CONDUIT SCHEDULE AC SYSTEM SUMMARY PROJECT MANAGER NtlINAL wSTFJ1 v0.TA(E: 2<E VQTE AC SYSTEM:e.e1 KWeTC,7.0 KW AC MQ)13 N0 PANAEWX:'.ViSDQn7 YDDallo.raRATELxNE:EE7Eaow4 YODELra fqM®OE'P�0 COND COND COND OND d10 g COND ��T��K'1%O 32ALAN CUFFORD TOTAL PV MODULE CITY:20 vaABR NTNG:7E IOVAc MAX INPUT PONFR:4110w TAG Ow @ TYPE OTD ONO SIZE WULOURREIR PFJREM E(q(11: 40.00A DIMENSIONS:321MI.M1.1 NCH MOM-VOLTAGE:M MAX VOC:M V IIJVER7ER ID.S MIH YODl1LE PwATRO ETC.fOW YAX OIJTMCIT CURPEM:3xA OUTPUT CURRENT:ISA pC1 LSTIIINO AMA3H0 RI4MRE 1 ;AVAW �-AUT 7A VOC lOPB4CRCUIT VOLTAGE):71.3 V MCNEIGHEDEFFICENLY:M OUTPUT VOLTAGE:SOVOC2 4 AVAM10 TMVI-2 1 REVI&ONS NPOVAROONSTQ am VYP(MAJ4PONER VOLTAGE):M.7 V YNOMUY OCVOLTAGE:4MV MIN.STRING LEMONT:a DESCRIPTION DATEMODUIETOTNOTY M RIC(SNORTCRCIIR OIRREN�:O.tfA MVYERIER GIANTRY:1 MMX.STRING LEMONT:20AO7 f AV1pR TIRNI-I 1 OCAC RATIO 1.13 WP(YA%p°NER CURRENT):6.7A I MAX STRING POVAC am STRING STY: 1 PV SYSTEM MNOMUMI VOLTAGE CALCULATION PER NEC 090.7(A) MIND 11 VOC MAXSOF TEMPERATURE � ��� � COIOECTIOH X WL X YODULES N CORRECTED OPEN MAXOPENCIRCUTVOLTAOE 4M FACTOR SERIES CIRCIIRVOLTAOE MAX SHORT CIRCUIT CURRENT t0A N X 71.5 %1. Slti IrRI•n•rr OPERATING CURRENT 15 STRING CITY: 1 I I M STRING LENGTH 12 ONROOFTOP I INSIDE MSB.1v1T�i BLDG.EXTERIOR bVALL -- +- MAX OPEN CIRCUTVOLTAGE 400 I I TO UTILITY GRID CONTACTOR INFORMATION OPERATING VOLTAOE 400 YAX SHORT GROUT CURRENT 1N EVOLU=ra.Uaeea MNNIZOrCwam �B gAECT Int P2na<FA% OPERATING CURRENT 15 PgNT OF INTERCONNECTDN • (E)SI-DIRECTIONAL TAP SI +NDnHAwuVEIwRLawTDH 0 UNE DE INVERTER: O I PERNEC2<021(BXt)a TH.12(A) 1-PHASE.240V VIM Ea x SOLAR EDGE SE78WH-US LLBRGTH OF TAP CONDUCTORS n m OUTPUT:240 VAC,32A I SH/ALLNOI"MED1pFT 99.0%CEC WEIGHTED EFFICIENCY _ _____________ STRING 1:(1)PV MODULE PER OPTIMIZER NEMA 3R,UL LISTED,INTERNAL GFDI r DATE:1,MSM9 ITC7 I I ! INSIDE BASEMEN (14)OPTIMIZERS CONNECTED IN SERIES a AFCI PROJECT NAME 4.70 KW STC TOTAL OC2 UNGROUNDED,TRANSFORMERLESS (N6 JUNCTION BOX AC DISCONNECT: S°0 VDC,NEMA 3lX i M AC1 2401.00M1P FUSED ACI BRADLEY LEVAY III LISTED , NEMA 3R,UL LISTED ________________ i 0 0 o N Lt i UNE SIDE TOP I (E)MAIN BREAI�R TO 26 SYLVAN LN AC DISCONNECT: NCUSE24DV,25DAGP NORTHAMPTON,MA01062 24CV,60AMP Lt L, PHONE: NONIUSED (E)MAIN SERVICE EMAIL O O O L; PANEL,1 LLIL., NEMA 3R,UL LISTED N •N MUtRAY-PN.3-W. JOSE'.MA02-20-OM -- I L- ACt SMART F_ IG G 20DARATED,240/,2P APNNO-N h x 1 -- _--------- - DC1 I - a - o i G -'� G G I Act _ METER i PROJECT DETAIL L, t2 N G mANGMMAIN 6.64 KW STC I I BONDING JUMPER 7.6KWAC STRING 2:(1)PV MODULE PER OPTIMIZER I 1s (12)OPTIMIZERS CONNECTED IN SERIES L 4.06 KW STC TOTAL - _ Oo I ENGINEERING APPROVAL - - NEUTRAL CONDUCTOIR MAV BE OMITTED FIR DISPONNECT OR MAY i ASS THROUGH I _ L I L-7-1 EU CTTING ROGE GROUNDING SYSTEM LOAD 810E BOTTOM I iRREVERSABLE CONNECTION TO G.E.0 AMPACITY FORAC CONDUCTOR SPECIFICATIONS REQUIRED CONDUCTOR AMPACITY AMPACRY CHECK 01 DISCONNECT CONDUCTORS DISCONNECT CONDUCTORS TM CIRCUIT ORIGIN CIRCUIT AMPACINO ppTSmR 0OF MAX MAX MAX DEETIATM MATERNAL TFAIP' 30'C PER OUTPUT X PARALLEL CURREMPER X 12MPO _ CURRENT CURRENT <CONDUCTOR CONDUCTORS Mrs.<Y RATING SIZE H0.13(BX1R CURRENT STRIMO6 EMAWM EMAO)Xt) PER PER AMPACITY AMPACITY 4 SMIWI) MOAO9(1) SSAMPS OEMTE PER SHEET NAME DC7 PVSTRMO JUNCTION DOX COPPER 4r AWOS10 40 AMPS 151) x 1 15.0 AMPS X 170 . WE 10.75 AMPS< 40 AMPS 310.150(3W ELECTRICAL LINE WAN,X A•`A DIAGRAM 002 JUNCTION BOx INVERTER COPPER 90' MV0M70 40 NAP& 15.0 X 1 15.0 AMPS x I." • WE 10.75 AMPS< 40 NIPS 44AX'94")•4173A•0A0 SHEET SIZE CONDUCTOR SPECIFICATIONS REQUIRED CONDUCTOR AMPACITY AMPACITY CHECK#1 CORRECTED AMPACITY CALCULATION AMPACITY CHECK 02 ANSI B CIRCUIT CIRCUIT MAX MAX NA% TM AMPACT'0 INVERTER MAX CONDUIT DENTED DENTED N ORIGIN DESTINATION MATERIAL TEMP' TRADE f0'CPEI1 OUTPUT X SW CURRENTPER X I25%PER CURRENT CURRENT CONDUCTOR CONDUCTOR X TEMP X FILL CONDUCTOR CURRENT < CONDUCTOR �� X 17" MIND S� 31O.INeI(1R CURRENT IMVEIITERd SMA(AX3) EMAO7X1)• PER P!R < AM AM DENTE DENTE AMPACITY PER AMPACITY SIO E(RTX7) SM.E(BX1) SMOA(BXD SHEET NUMBER ACI INVERTER YN PANEL E COPPER MO' ANNA M MMP& - X 1 3x.0 AM_ X 170 40-00 40-00/IMlS s M AAMP& S0 X 0.34 - tlp • 51.70 4°.00 AMM < 01.70 AYPo PV-4 PROJECT MANAGER h IAN CLIFFORD DIRECT CURRENT WANING:PHOTOVOLTAIC PHOTOVOLTAIC POWER SOURCE ELECTRICAL SHOCK HAZARD •POWER SOURCEREVISIONS DESCRIPRON DAIS REV REQ'BY:NEC 690.31(G)(3) TERMINALS ON BOTH LINE AND MAXIMUM VOLTAGE: 480 VDC APPLY TO: LOAD SIDES MAY BE ENERGIZED DC WIRING CONDUCTORS OR ANY IN THE OPEN POSITION ENLOSURE CONTAINING DC WIRING, MAX CIRCUIT CURRENT: 30 AMPS SPACING SHALL BE NO MORE THAN 10 FEET R AtJM REQ'BY:NEC 690.53 APPLY T0: AC DISCONNECTS INTERIOR AND EXTERIOR REQ'BY:NEC 690.53(1-3) n APPLY TO: CONTRACTOR INFORMATION INVERTER AND ANY DC DISCONNECT LUSUN MASSACHUSETTS nomea".Ix Rmme.ml� aREcr Ps+_mAee•Nc S EM E ID SHUT- PHOTOVOLTAIC � �• •- DATE 71NYt01• DISCONNECT_._ . • PROJECTNAME REQ'BY:NEC 690.56(C) I 1 BRADLEY LEVAY III TURN RAPID SHUTDOWN APPLY TO: 26 SYLVAN LN SWITCH TO THE NORTHAMHONE A 01002 own.�R c INVERTER NEXT TO DC SHUTOFF IF RATED AC OUTPUT CURRENT: 40.00 AMPS PHONE: "OFF"POSITION TO ST INVERTER IS INSTALLED OUTSIDE, EMAIL SHUT DOWN PV SYSTEM OTHERWISE APPLY TO MAIN AC DISCONNECT NOMINAL OPERATING AC VOLTAGE: 240 VAC JOB•MA02-20-0020 AND REDUCE J SHOCK HAZARD APN N0=— IN THE ARRAY PROJECT DETAIL REQ'BY:NEC 690.54 8.81 KW STC APPLY TO: 7.e KW AC AC DISCONNECT AND LABEL VOLTAGE AND REQ'BY:NEC 690.56 C 1 A CURRENT WITH PERMANENT MARKER ENGINEERING APPROVAL 2 APPLY T0: INVERTER ONLY OR NO MORE THAN 3 FEET FROM INVERTER DUAL POWER SUPPLY SOURCES:UTILITY GRID SOLAR ELECTRIC CIRCUIT BREAKER IS BACKFED AND PV SOLAR ELECTRIC TRUN OFF PHOTOVOLTAIC AC SYSTEM DISCONNECT PRIOR TO REQ'BY:NEC 705.12 B 3-4 9 WORKING INSIDE PANEL REQ'BY:NEC 705.12(B)(3.4) SHEET NAME o APPLY TO: PLACARDS TO BREAKER OR AREA LABELING APPLY T0: BREAKER SUPPLYING POWER TO CIRCUIT LOAD CENTER,MAIN SERVICE PANEL AND METER INVERTER AND OR 2 CIRCUIT LOAD REQ'BY:NEC 690.54 CENTER SHEET SOCKET ANSISI B B APPLY TO: MAIN SERVICE PANEL AND METER SOCKET SHEET NUMBER PV-5 ROOF DESCRIPTION PROJECT MANAGER IAN CLIFFORD ROOF l� AZIMUTH t1 40• TO• $2 40• 1Q0• REVISIONS WE RIPDDN DAIS REV 4p 40• 250• u 4D• M. REVOLUIstBIBl CONTRACTOR INFORMATION REVOL MASSACHUSETTS m,no eev ruwµol ex w„ ecr ile,n7 mee rui nwwRevoww DAT A IM11 018 PROJECT NAME BRADLEY LEVAY 111 26 SYLVAN LN NORTHAMPTON,MA01082 PHONE: EMAIL: JOB,MA02-20-0020 APN NO:— PROJECT DETAIL 8.84 KW STC T.S KWAC ENGINEERING APPROVAL SHEET NAME LAYOUT MAP SHEET SIZE ANSI B 11"X 17' SHEET NUMBER PV-6 PROJECT MANAGER IAN CLIFFORD I H 1 T. + Po ft H 1 T. + REVISIONS hrotowN4k MWwle Mim,rduk Mduk OEaCRIPrION WTE REV N340/N335 N340/N335 PRELIMINARY Panasonic s unique heterolunct]on technology uses uttm-thin _'"`OtlMeX11 w.Wa•ry REVOLU�SUN amorphous silicon layers.These thin dual Layers reduce losses, ,esuiting in higher energy output than conventional panels. • '""'�'°O- x.wa"..w... - --ANCONTRACTOR INFORMATION r,•nwwc«a.an nw�,. e•n.-, .a•wee r«www c«•wx.,w, ono. .nnvrc LUSUN MASSACHUSETTS r .•..s»+..w.o- ..,.... n]ws. • >nrro wwfw"tan me min ..ec «.s< f wr.r see.rf IN—A EnlEmeuaLNc.o". � �vT t.•f,.�e", }}•. }25}] n'�-�Qxs rM REO n}n]} ..�,_.......,,« xwwk a.„w. •oa � ww.v.REwWM1N.cowV ® DATE:11108/2019 "•'"”'*"f"'�"fe e0w PROJECT NAME ..-.�. �„.w.wi.w,..r.i .roue• AManced bitaciat cell designed for increased energy output __ _ _. BRADLEY LEVAY III The cell utilizes sunlight reflected back from the rear side26 SYLVAN LN material which captures more light and converted into energy. ea NORTHAMPTON,I 01062 PHONE: MAL •www,wswv- uwiviw u. ; � JO&9:MA02-20-0026 rawA °`► o.r.,mx..w.r..e. .eewz•.,.mem,-. J��yy]^ �...r... •.. 'r -"` ore..+,. wnnc.wc•a .�� _ PROJECT DETAIL w roue �'ONV-wL ..,• •w,•rw*«G'] 8.84 KW STC Our competitive advantages °-"^�'° ,, ,,_ 7.6 KW AC ».,,.,.. • as wa«k,a k High at HighWarranty- A. • ENGINEERING APPROVAL b ry 9 Temperatures 25 Year Product and Performance Wrnnly' Aslemperaturc increases,H lT"continues to Industry leading 25 year product workmanship en«` our/4nERCt o,mxawAH(L 1� perlormat high levels due to the industry leading and performance warranty is backed by a century " b `"' iMp`" t• - temperature coefficient of-0.258%/-C.No other old company Panasonic.Power output is module even comes close to our temperature guaranteed to 90 76%after 25 years,far greater characteristia.That means more energy than other I.-Den- throughout the day. ompaniesthroughouttheday. o"nwi•].,,..•.,: .ew wirrr•.wcw•c� _- _ xY f/•'r w,n'wi•,w �"ar,,,nerx"•yelhVe � .. DuaUty and Reli.1:14 Higher Efficiency 20.3% OPanasonicsv m-t integration,21 years of Enables higher power output and greater energy �i.wa co-i.•x.. }msc rr�c 19pe�ul Lc experience manufacturing HIT'and 20 intern yields.HIT"promdes maximum production for your ]]"] tests beyond those mandated by current limited roof space. rr wa.w,^fo,•e.,.osov s..,� 'ws • • w • w • w • standards proides extreme quality assurance. Lowndation Enhanced Frame Desi n .. �,„ x« •n.c ...»..«. HIT-DN--ttype'cells result in extremely Low Light G� Anew GOmm frame increases durability and Induced Degradation 1-10)and zero Potential L strength.being able to handle loads of up to 5400Pa. muu*xwi R•e••'s's + rs•o-^.,«ro a^a,w. Induced Degradation lPIDI which supports Also,the water drainage system gives rain water ^^',i",,,,,,,,„,_„„»,,,,,"w,,,,,,,,•„-„,,,,�,,,,„,,,„» SHEET NAME rebabtllty and longevity.This technology reduces and snow melt a place to go.reducing water stains ”" °' ”' "••'""�"`”'- MODULE annual degradation to 0.26%compare to 0.70% and soiling.Less dirt on the module means more SPECIFICATION in comentional panels.guaranteeing more power sunlight getting through to generate power. for the long haul. +^«+ SHEET SIZE ANSI B 11"X 17" SHEET NUMBER PV-7 PROJECT MANAGER AN CLIFFORD I Single Phase Inverter Wit HD-Wave Technology for North America REVISIONS SE300OH-US/SE380OH-US/SE5000H-US/SE6000H-US/ 0E90"°"°" DATE Single Phase Inverter Z SE760OH-US/SE10WOH-US/SE1140OH-US with HD-Wave Technology rCn °"""' 3�x1 :4J •�" - �• _ REVOLUTANW 3L'Od_06v 000.106 gOm•Dxw IN for North America T "°�".A°°"'°"a' " ' '�=�° "•1°6Y 6�' WIXI14MZ M SE3000H-US/SE380OH-US/SE5000H-US/SE6000H-US/ "D.161) Af.!17xr WlA96 Mn.-NGm.M;, w« SE760OH-US/SE1000OH-US/SEI 140OH-US '' 91 M Aifawwxrlw",ruh 59.3 6D WN.5 CONTRACTOR INFORMATION Mtww.Ca".N"n Cour 2S .. f_ 475 A �1+ nU3U�N MASSACHUSETTS CM1wu•l'JPV •3 A n[er­.ireall rAx w L^ M1"R9rtvc Awa"�w.cwwAr v , UIIH Mav7w419Mw9gEGntMlt • lar 0 fM,Acyn_a�wil.-x•'guzble W. RYCUT DATE:11)(111i M.ewr•[C Are.d.+7v -a� Pio +3c0 6650 w PROJECT NAME ANmvn LL Me•a.:Oev - Pi0 6500 V BRADLEY LEVAY III •••• •••• 30D ft26 SYLVAN LN . 6av1d 0i I.pl xe.4 • Ma,nnn+I,pt Cu�wr p:arv. •: :0 21 X, - NORTHA PHONE:MA 01062 e PHONE: • • AIe•r,4r.11g6Curaq b;OeV - 0! 27 Alk EMAIL _.i t •, Mtr 1prtsl�r autcw•n 45 Aec JOBW MA02-20-MO • • R,.pfl pgAllylwpRxw % APN NO:— e � • � —.N.kV M,6.Tn Urechn fO�•SwWReip -- 1..ea,E1xwm P A2 h PROJECT DETAIL 4§•N0 rn',a E4uw"1 9Y sasexw 6.84KWSTC e e • • -P1na cw•nc•> 7.6 KW AC W W ADDITIONAL FEATURES RS445 Elr.Nt r9be We Glint WptldW1 ENGINEERING APPROVAL ox—,:, Optimized installation with HD-Wave technology Au an xRap051—n x-AC Go N-0 STANDARD COMPLIANCE SYr'r U1741 IV'41 SA L'L•936 CSA C22 2 C-1i.00 aa"tl3q!a 1LL M-01 I Specifically designed to work with I Extremely small u"Cunr _vtw.lrn W15a 1N.'t RW.N.N. power optimizers 6— KC 1.u Ct.•6 I Record-breaking efficiency I Built-in module-level monitoring MWALIATION SPECIFICATIONS K G.1Qit COmu'Sit: <4,� 3l4'rt.nnun!Nfi ANG 3fr nwMrun(NJ ANG R I Fixed voltage inverter for longer strings I Outdoor and indoor installation oC Reu c. S. •oS it 1,2 •n0.!W6 AWG 3N'.Nr 11.3 ftW,Nb ANG D.nwN"rR N�011.kry 5W¢� . _ Integrated arc fault protection and rapid shutdown for/ Optional:Revenue grade data,ANSI C7220 INAWO7 r11N 6.be 1450.310.01 213,N6,13(40+370.1% NEC 2014 and 2017,per article 690.11 and 690.12 Class 0.5(0.5%accuracy) W.W u1's»'.1 swlr^ 1 31,114 M2,n o Neer 116 bane .5 '50 AA SHEET NAME UL1741 SA certified,for CPUC Rule 21 grid c.9q Noy c_ compliance Nur-251-W't-01I.4aC Wkw iINVERTER N�wl�Rs g NfMAJ II W wa•sr.ns wm SPECIFICATION solar ,., �',vum nmw.swee:w.J,.w o., SHEET SIZE solaredge.com • � :�.,r... .�.N ",».,.,.ryr:mw..,,...Yw..-..M�.>n,,.»1.N,s..v� ANSI B NX. SHEET NUMBER PV-8 PROJECT MANAGER IAN CLIFFORD / Power Optimizer -� For North America REVISIONS Power Optimizer O P320/P340/P370/P400/P405/P505 WMW REY For North America C P320/P340/P370/P400/P405/P505 t7 REVL M INPUT Sly ., of Nk Adc CONTRACTOR INFORMATION --—- - - _- 171 Adc REVOLUSUN MASSACHUSETTS u_ __ r m�+bmesaw"perme.mn ti94 a ,wRN.vBUE�alluMarbl am _ "w.l.9cvowew.cwew OUTPU7 DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) DATE:77Afl2019 OUTPUT DURING STANDBY( WOt OPTIMMER DISCONNECTED FROM SOLAREDGE INVERTER ORSODAREDGE Ns PROJECT NAME 111,I01ERDER OFF) N aM � BRADLEY LEVAY III CE M STANDARD COMPUAN28 SYLVAN LN s.,.. _ NORTHAMPTON,MA D1O82 PHONE: EMAIL: INSTALLATION spwFICATIONS JOBS:MA02.20.0028 APN NO:— rv.w" .a�veww".•wo.: a,.,.naw,.anw"n.0 ana rn�er"Nafe,MiVY. PROJECT DETAIL P:nnw"9tW atvH W.Kisl:SlS t+b•�� 94+K3+f5f/ WSK!s ass- '2us Wts S9/ rolriln v.ae1J SJaatsl9 s.Ixasat.E 0.66 KW STC nn5aoy J Nol1A 61SO +061/1.+ le 7.0 KWAC 'roa CaRaaa MLa' clI,WN tV9ar Cr:— _v -A..t MU wry.,s w�R rr 0.95/30 IJ/T� nik ENGINEERING APPROVAL unu wire re a ia/052 m IR Cywatn9 iirora;.e -a0..m/U..195 'l/T PV power optimization at the module-level «,awn YM/NEMALP 9Maw.IN�WAy o•wo r +n.a s._p..w a«..,�,w w,e«.ew M.we.,.u.•rc.aw..0 / Specifically designed to work with SolarEdge I Fast installation with a single boR b»..�'""•^•,:n� .w+iwar"n°"� inverters / Next generation maintenance with module- I Up to 25%more energy level monitoring 95.tl, 3a0,'3711 Mmnum Stung lwptli ax y 8 10 b I Superior efficiency(99.5%) / Meets NEC requirements for arc fault *" WS/uses 6 9 u protection(AFCO and Photovoltaic Rapid "A°"^iun5tn^"""`^^ 25 n - / Mitigates all types of module mismatch losses, Shutdown System(PVRSS) ;m,,mm— from manufacturing tolerance to partial 5EwiiP.O-Allo ;no 0000 4:1v w SHEET NAME shading / Module-level voltage shutdown for installer A. OPTIMIZER and firefighter safety �a�uxmwn Flexible system design for maximum space .,« ••y,a.d .tt,Ha+..ya ,�,...wl, rRF�..w+�..a,,.r.9,�.ou� SPECIFICATION utilization i♦,.rq wr a"�•- �M�:�+W vub.-.i;w��wrtt Ml w. in W�.v..nwrn .sn..vvxa+2w%r..w.�.i...".u,..r .,ww.:.ns••M.•�,y,r..u,.«..„.rw�cnr.m2r r•,..�.�w,ru:n�s..a e. SHEET SIZE b rclraLLY.aF d 34nhtrAv.nl'rN axJflll b is eWrrl,u MY,q r�5,a6]"r t«Wry a'vn r Nryr•eanW W 4,n•mr,a�.w.5.fw v«roA06b11RAiR�I� .a.�.,��.,m..•.�r.�.,EN�..w..^.n..,.a"w..�o� ANSI B Solaredge.corr solar T 11"X17" orr+►�w+wrr�i.' ..••••" ."r.,.w.+,.a'.w iw.a'�aa,e w«c+.,a. CE obw SHEET NUMBER PV-9 PROJECT MANAGER IAN CLIFFORD REVISIONS � OEBCRiPrKN DATE REV Mounting systems for solar technology Mounting systems for solar technology ��solar tystemy' talar t Shared Rail for Pitched Roof: REVOLU(SW —:n—;.;tea Fast vmpie insta'laoon No dn!h rig,no bonding jumpers Pie-assembed unrvelsel module dw0s with CONTRACTOR INFORMATION mediated bon dug Robust bond,.ng ra,so,CeS REVOLUSUN MASSACHUSETTS Low PV Count mer nm arzna e,a A60 Compaub,ew-th hie,00fsuvng Nsrr" 1N0"T" iNCTON� ava,lab,e roof hooks u,.. nre,n UL 2703 LISTED COMPONENTS DATE.11/08'2018 Ai,Dlmponenls t%eluated Under UL 2703 and encompassed wahh Everest Solar Syslem S UL 2703 Listing shown below urn PROJECT NAME d you seek a UL listed System,only the parts shown m this page are acczptabie. Crossbil48-S/48/80 Y Bumdy WEEB lug B.0+Hardware BRADLEY LEVAY III 1 28 SYLVAN LN ateywan,,,, OrBurndyWEERLug 10.3+Hardware NORTHAMPTON,MA01082 rnnh mi!,oa'c amdcaa • All&*wEEe L"M "eepyW og" PHONE yrtleallCRMlytimEMAIL: --- - - JOB;,:MA02-20-0028 Rail Connector Set' rs■.s.e L-Foot with Hardware APN NO:— Mal-9 afurn,en, " Mat—eamrwm -- �mnh m.h.date amdum +.nish ni.,daleaW.. 2_ nerdwae s+mnesssuel_ �_--.___ f na,rl.:are..uMns steep PROJECT DETAIL Structural Rall Connector Set STC Optional:Array Skirt e e KW CR 49.5 Mae" � i'mish d aam mien Mae".aiumrem r�nen mh ax»a0 W lde�lt♦s!freed steel —d—names,steel ENGINEERING APPROVAL CrossRail Mid Clamp UL2703+Set' EverFlash eComp with Slide Kit JC 50 mm Mate al nenun.sta Na;steep Mater N nnnwss steel ..tSn�� rJt CrossRall End Clamp Set Everflash gComp with Slider Kit 30 50 mm McIPWI aumnun.na40 n�ass.tn Material ttbNe55 S:tel AJW N,nn s,ae ASSEMBLY INSTRUCTIONS m,snel�.d.s Q Y' Optional:Micro Inverter and Optimizer RESIDENTIAL ROOF SOLUTIONS Mounting Kit" w 'A,—al slanlese Stas' CROSSRAIL SHARED RAIL SYSTEM SMEETWWE ATTACHMENT ® SPECIFICATION ILL 2703 Listed System USA SHEET SIZE ANSI B Materials Required 1111111111111 a 1 15 11e1 X 17" SHEET NUMBER PV-10 PROJECT MANAGER UN CLIFFORD Im EverFlash gComp + Slide Kit REVISIONS oEsaevnaN DATE REV -� With Quick Mount PV® Elevated Water Seal Technology ► Fast,simple installation that � with most composition roof typeseS ► Minimal component count resulting in a li*i lower overall installation cost ly � �S��Q� ► Compatible with CrossRail Shared Rail System CONTRACTOR INFORMATION 11 Fused flute raised 0.3"above the metal fleshing USUN MASSACHUSETTS to stop water encroachment aa"mA w Ei a"uwma v.m DATE:11100=19 PROJECT NAME Components BRADLEY LEVAY III 28 SYLVAN LN NORTHAMPTON,MA 01082 PHONE: EMAIL: JOB":MA02-2(-0028 APN NO -- iS`� PROJECT DETAIL wt26 .i 8.84 KWSTC 7.8 KW AC Tools Required ENGINEERING APPROVAL t I ► 112"socket(for lag bolt) EverFlash gComp EverFlash L-Foot `5x16"Lag Bolt Slide Kit ► 7/32"aircraft extention Flashing 9x12" and Hardware Material.sralniess Material,aluminum ► Measuring tape -material,aluminum Material:aluminum steel FMnsh:mill,dark ants stainless steel ► Cordless drill Finish:moil,dark ► Torque wrench(0-50 ft/7b) ► Roofing bar SHEET NAME ► Sealant ATTACHMENT R E V4 LU(S U N. . String line SPECIFICATION SHEET SIZE cleaner, smarter. solar. N. ANSI B 11"X 17" (701)9480498 1 1 MwV,A—io.SURE A.6.1rVIM.MA OHO SHEETNUMBER PV-11 1.Installers to verify rafter size,spacing and sloped spans,and notify the E.O.R of any discrepancies before proceeding. r I—�`f RIDGE T T 2 Any rotted or damaged rafters shall be replaced prior to proceeding. 3.As a precaution,old or wet snow should be removed from the roof,if the snow builds up to 18"or more. 7`4F HORIZ.SPACING 1MAK AVERAGE SLOP�p SP HORIZ.SPACM COLLAR TIES SUPPORTS WHERE APPIES ROOF I (NO BEARING WALL LOW) I I SLOPE ( p INTERIOR WALLS (LOCATION MAY VARY) ` RAFTERfrRUSS CHORD SEE OVERALL SPAN LANDSCAPE ROOF STRUCTURAL INFO PORTRAIT I_L "SPACING NOT TO EXCEED MANUFACTURER'S SPECIFICATIONS ROOF ACCESS-' DETAIL 2 ROOF TYPE -COLLAR TIES DETAIL 1 STAGGERED ATTACHMENTS LAYOUT NTS SEE ARCH 4 STRUCTURAL INFORMATION SRC Job Id: 25672 Calling Type: 1/2 gyp.Bd. Collar Tle Space: 48 ROOF RAFTERS OR Coverage%: 50 SiRUCRRRAL MEMBERS Frame Size: 2x8(916 Ground Snow(psf): 40 Sloped Roof Snow Load(psf): 19.3 �ZN OF?,f Leg Screw Diameter(In): 5/16 �A S Lag Screw Embedment(In): 2.5 Overall Span(ft): 40 JAMES A. PV Orientation: Both MOR¢ONTA-DeTANCE vERT�ca DISTANCE ADAMS BETWEEN STANDOFFS BETWEEN SrANDOFFS PV Weight of: 3 STANDOFFS ARE BOLTED INTO ROOF STRUCTURAL y g IP ) RAFTERS OR STRUCTURAL MEMBER %n d97<$ Rafter Sloped Span(ft): 21 TYPICAL RAIL-LESS SYSTEM ,O\y v �. Rall System: RallLass 'G�CIST E9' F� Roofing Type: Comp.Shingle ATTACHMENT �ONAL ENG\ Roof Mean Height(ft): 20 PV MODULE PV PANEL Root Slope(degrees): 40 RCOF SHTG ROOF SHTG. moi% Root Type: COIIarTIM G�/� Jame@Digitally Signed by Sloped Calling?: No RAFTE JamM A.Adams,S.E. Date:20101 9.11.2011:43:45-0800 Standoff Max.Horz.Space(tt): 4 vEa MAX.AVERAGE Standoff Max.Vert.Space(ft): 5.417 M PPG`NG' HORIZ.SPACING Standoff Staggered?: Yes 4 Ft Wind Exposure: C Wind Speed(mph): 120 This sheet not to be used without permission from DETAIL(3 FLUSHMOUNT SOLAR-ROOF-CHECKCOM Current Renewables Engineering DESIGNER: SRC PROJECT NUMBER PROJECT NMIES­F65 BRADLEY LEVAY IIISHEET: DATE: 1960 Chicago Ave,Suite D-15 26 SYLVAN LN STRUCTURAL Riverside CA 92507 USA DRAFTER: SRC LEVAY III NORTHAMPTON MA 01062 DETAILS S-� 11-19-2019