Loading...
Fire Station Parking Lot Improvements_final 1 Fire Rescue Headquarters Parking Lot Improvement Project Presenter: Jessica Roberts, Senior Environmental Scientist Northampton Fire Department 2 City of Northampton Central Services Department Located at 26 Carlon Drive, Northampton, MA Fire Station original buildout circa 1998 Part of the Carlon Drive subdivision Requires Site Plan Review as “Intermediate Project” Section 350-11.2.B (6+ parking spaces created) Objectives Expand onsite parking to meet current demand Improve access to the onsite fuel tank for fire trucks Create a new backup power supply (solar canopy) Improve stormwater management Project details 3 The parcel is approximately two acres Zoning Highway Business (HB) Frontage on Carlon Drive and North King Street Waivers Requests: 10-foot tree belt requirement (pavement extensions on drive aisles) 12-foot tree belt depth requirement waiver request (Attachment 12) Resource Areas BVW in western portion of the site Proposed work avoids 10-ft no disturbance zone Work within the 100-ft buffer zone (WPA M.G.L. c. 131, Section 40) NOI filed with Conservation Commission No additional impacts to Resource Areas Vernal Pools, floodplain, drinking water, ACEC, protected open space, endangered species Existing Conditions 4 Existing Conditions Plan 5 Expand Parking 64 total parking spaces Allots parking for high response times and training Improved turning radius for refueling Stormwater Management New stormwater basin to mitigate the impacts of additional impervious area New treatment unit on the existing stormwater system to improve stormwater quality Solar Canopy and Backup Battery System DOER grant to install battery backup system Will power critical emergency response systems during power outages “Green energy” solution reducing the need to run the backup generators Second backup power source for redundancy Proposed Development 6 Site Design – Parking Lot 7 SITE DESIGN – GRADING, DRAINAGE & UTILITIES 8 Site Design – Solar canopy (NITC) **The Solar Canopy Array and Backup Battery system will be procured separately from the parking lot work. 9 Questions? 10