32A-117 (2) 94 MARKET ST BP-2020-0446 GIS#: COMMONWEALTH OF MASSACHUSETTS ME:Block:32A- 1 17 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2020-0446 Proiect# JS-2020-000760 Est.Cost: $35796.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sa.ft.): 4356.00 Owner: SANFORD DAVID W&MARY C YUN Zoning: URC(100)/ Applicant. PIONEER VALLEY PHOTOVOLTAICS AT. 94 MARKET ST Applicant Address: Phone: Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON:10/9/2019 0.00.00 TO PERFORM THE FOLLOWING WORK.-SOLAR ON 2 ROOF SECTIONS - 28 PANELS TOTAL 10.22 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Skinature: FeeType: Date Paid: Amount: Building 10/9/2019 0:00:00 $75.00 212 Main Street, Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner 30 _ Department use only er . City of N rtha t E Statu of Permit: Building epa�.,,L I urb ut/Driveway Permit 212 M in Street ewe Septic Availability Roo 100 OCT - 7 Natef VVell Availability 9 "� Northampt MA 01060 wo Sets of Structural Plans .'"' phone 413-587-124 F - - lot/Sde Plans DEPT OF run DING IN " NORTHAMP?ON. Other Specify ^.^: APPLICATION TO CONSTRUCT,ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: ? This section to be completed by office Ja Map ,4 Lot L j 7 Unit Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Mary Yun and David Sanford 94 Market St,Northampton, MA 01060 Name(Print) Current Mailing Address: 413-537-5793 See Attachment A Telephone Signature 2.2 Authorized Agent: Miira Gates for Pioneer Valley Photovoltaics 311 Wells St. Greenfield, MAO 1301 Name(Print) Current Mailing Address: 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $35,796 (a) Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total= 0 +2+3+4+5) $35,796 Check Number This Section For Official Use Only Date Building Permit Number: Issued: rry Signature: lu Building Commissioner/Inspector of Buildings Date buildingpermits @ pvsquared.coop EMAIL ADDRESS (REQUIRED; EITHER HOMEOWNER OR CONTRACTOR) Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R:= Rear I Building Height , Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DON'T KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO 0 DON'T KNOW 0 YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained O Date Issued: C. Do any signs exist on the property? YES O NO 0 IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES O NO 0 IF YES, describe size, type and location: E Will the construction activity disturb(clearing, grading,excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES, then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5- DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alterations) Roofing ❑ Or Doors 0 Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [0 Siding [O] Other[ED] Brief Description of Proposed Installation of racking system for solar PV on two roof sections Work: Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building : One Family Two Family Other Solar PV b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? In. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . 1. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, Mary Yun as Owner of the subject property PV Squared (Pioneer Valley Photovoltaics) hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. See Attachment A See Attachment A Signature of Owner Date Miira Gates for PV Squared as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Miira Gates Print Name 10/2/2019 Signature of Owner/Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Daniel Gomez Gonzalez License Number CS-111266 Address Expiration Date 03/14/2021 Signature Telephone 413-772-8788 9. Registered Home Improvement Contractor: Not Applicable ❑ Pioneer Valley Photovoltaics Cooperative Company Name Registration Number 311 Wells Street, Suite B, Greenfield, MA, 01301 140077 Address Expiration Date 413-772-8788 Telephone 09/15/2019 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes...... 1 No...... ❑ Attachment A PV Squared is committed to providing a high quality product and service and we look forward to working with you on your renewable energy project. Sincerely, Pioneer Valley PhotoVoltaics Cooperative CT Chris Krezmien Design and Sales Team Attachments: A—PV Array Sketch General Terms and Conditions Right of Rescission AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above,and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement.I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley Photovoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley Photovoltaics Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. Mary C Yun & David W. Sanford 8/20/19 Printed Name Date Signaty a �� � Title Proposal and Agreement k 00014954 Page 6 of 12 Mary Yun-July 28,2019 City of Northampton Massachusetts ���5 C'<< i 'tv �, w DEPARTMENT OF BUILDING INSPECTIONS yr 212 Main Street • Municipal Building yJti CDS .,,,. Northampton, MA 01060 AFFIDAVIT Home Improvement Contractor Law Supplement to Permit Application The Office of Consumer Affairs and Business Regulation("OCABR")regulates the registration of contractors and subcontractors performing improvements or renovations on detached one to four family homes. Prior to performing work on such homes,a contractor must be registered as a Home Improvement Contractor("HIC"). M.G.L.Chapter 142A requires that the"reconstruction, alteration, renovation, repair, modernization, conversion, improvement, removal, demolition, or construction of an addition to any pre-existing owner-occupied building containing at least one but not more than four dwelling units....or to structures which are adjacent to such residence or building"be done by registered contractors. Note:If the homeowner has contracted with a corporation or LLC, that entity must be registered Type of Work: Solar installation Est. Cost: $35,796 Address of Work: 94 Market St, Northampton,MA 01060 Date of Permit Application: 10/2/2019 I hereby certify that: Registration is not required for the following reason(s): Work excluded by law(explain): Job under$1,000.00 Owner obtaining own permit(explain): Building not owner-occupied Other(specify): OWNERS OBTAINING THEIR OWN PERMIT OR ENTERING INTO CONTRACTS WITH UNREGISTERED CONTRACTORS OR SUBCONTRACTORS FOR APPLICABLE HOME IMPROVEMENT WORK ARE NOT ELIGIBLE FOR AND DO NOT HAVE ACCESS TO THE ARBITRATION PROGRAM OR GUARANTY FUND UNDER M.G.L.Chapter 142A.SUCH OWNERS ALSO ASSUME THE RESPONSIBILITES FOR ALL WORK PERFORMED UNDER THE BUILDING PERMIT.SEE NEXT PAGE FOR MORE INFORMATION. Signed under the penalties of perjury: I hereby apply for a building permit as the agent of the owner: 10/2/2019 PV Sqaured 140077 Date Contractor Name HIC Registration No. OR: Notwithstanding the above notice,I hereby apply for a building permit as the owner of the above property: Date Owner Name and Signature City of Northampton Massachusetts ,bar y Af DEPARTMENT OF BUILDING INSPECTIONS ?i 0` -s 212 Main Street •Municipal Building vd•., 4� Northampton, MA 01060 Debris Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. The debris from construction work being performed at: 94 Market St, Northampton, MA 01060 (Please print house number and street name) Is to be disposed of at: 311 Wells St,Greenfield,MA 01301 in Alternative Recycling Systems dumpster to go to 77 West St,West Hatfield,MA 01088 (Please print name and location of facility) Or will be disposed of in a dumpster onsite rented or leased from: (Company Name and Address) 10/2/2019 Signature of Permit Applicant or Owner Date If, for any reason, the debris will not be disposed of as indicated, the Applicant or Owner shall notify the Building Department as to the location where the debris will be disposed. \ The Commonwealth of Massachusetts Department of Industrial Accidents 0 1 Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name(Business/Organization/Individual):Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): 1.E]I am a employer with 48 employees(full and/or part-time).* 7. ❑New construction 2.❑I am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 9. El Demolition 3.F�1 am a homeowner doing all work myself.[No workers'comp.insurance required.]t 10 ❑Building addition 4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. 1 will ensure that all contractors either have workers'compensation insurance or are sole 11.[]Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.M 1 am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.❑ p Roof repairs These sub-contractors have employees and have workers'comp.insurance.: 14. Other Solar PV 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that isproviding workers'compensation insurance for my employees. Below is thepolicy and job site information. Insurance Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lic.#:BKS57072282 Expiration Date:01/01/2020 Job Site Address:94 Market St City/State/Zip:NorthamptonMA 01060 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cer ,, r t e ai s nd penalties of perjury that the information provided above is true and correct. Si natu. . Date: 10/2/2019 Phone#:413-772-8A8 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: AC" 12/28CERTIFICATE OF LIABILITY INSURANCE DATE /28//20182018 Y) �� THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Linda Powers,CRIS NAME: Webber&Grinnell PHONE (413)586-0111 FAX (413)586-6481 A/C No Ext): A/C,No 8 North King Street E-MAIL (powers@webberandgrinnell.com ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURER A: Ohio Casualty/Liberty 24074 INSURED INSURER B: Ohio Security/Liberty 24082 Pioneer Valley PhotoVoltaics Cooperative,Inc. INSURER C: Continental Indemnity/AUW Attn:Kim Pinkham INSURER D: 311 Wells Street,Suite B INSURER E: Greenfield MA 01301 INSURER F COVERAGES CERTIFICATE NUMBER: Master Exp 1-2020 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR AUUL bUBR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MM/DD/YYYY MM/DD/YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE ❑X OCCUR UAMAUL R N 300,000 PREMISES Ea occurrence $ MED EXP(Any one person) $ 5'000 A BKS57072282 01/01/2019 01/01/2020 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: X GENERAL AGGREGATE $ 2'000'000 PRO OC O2.000,000POLICY JECT DUCTS $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 Ea accident X ANYAUTO BODILY INJURY(Per person) $ B OWNED SCHEDULED BAS57072282 01/01/2019 01/01/2020 BODILY INJURY(Per accident) S AUTOS ONLY AUTOS X HIRED �/ NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident X $1 K coll X $1 K comp Underinsured motorist BI $ 300,000 UMBRELLA LIAB 3,000,000 OCCUR EACH OCCURRENCE $ A EXCESS LIAB CLAIMS-MADE US057072282 01/01/2019 01/01/2020 AGGREGATE $ 3,000,000 DED I I RETENTION $ $ WORKERS COMPENSATION X STATUTE PEREORH- AND EMPLOYERS'LIABILITY Y/N 1,000,000 C ANY PROPRIETOR/PARTNER/EXECUTIVE NIA WC/TBD/NYR 01/01/2019 01/01/2020 E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ Commercial Property Business Pers Property $1,750,000 A BKS57072282/NYR 01/01/2019 01/01/2020 Installation $50,000 Transportation $75,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Worker's compensation ncludes Ma,CT,and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD Cornmonweallh cit f0assachu-sells Division of Professional Loeensure Board of Building RegUlatluns and Standards (�Or,,struction Supervisor CS-111266 Expires; 0311412021 DANIEL G+OMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060 Commissioner Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Type: Supplement Card 0077 PIONEER VALLEY PHOTOVOLTAICS COOP Registration: 311 WELLS ST SUITE B Expiration: 099/15/2/15/2 079 GREENFIELD.MA 01301 Update Address and Return Card Office of Consumer Affairs d Business Reguiation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Sumlemeni Cad before the expiration date. 11 found return to Registration Expiration Office of Consumer Affairs and Business Regulation 140077 09 152019 10 Park Plaza-Suite 5170 PIONEER VALLEY PHOTOVOLTAICS COO;' Boston,M 0 116 1 CHRISTOPHER KREZMIEN 311 WELLS ST SUITE 8 `— GREENFIELD MA 01301 Undersecretary N t valid witho t 'anature Aull Office of Consumer Wet- and isetts ril Business Data. t •.t.. .4. Housing ,Reg I ion (OCABR) It. t wat I EC Lemon L . . Home Improvement Contractor Registration Lookup To search by registration number,enter the registration number in the textbox below and click the'Search'Button. Please note pressing the Enter key will clear fields. Search by Registration Number'140077 Search You must click the"Search RegisUant"button to search by name of location. Please note pressing the Enter key will clear fields. Search by Registrant Company name Search Registrant Search by Registrant Last name City/Town State Zip code �I Click on the registration number to view complaint history. You can also view arbitration and Guaranty Fund history The list is current as of Thursday, September 12,2019. Search Results RESPONSIBLERegistrantName • . . EXPIRA71ON DATE NUMBER PIONEER VALLEY PHOTOVOLTAICS Dick, Evan 140077 311 WELLS ST SUITE B 09,'15/2021 Current COOP GREENFIELD. NlA01301 ,—QUA J R�` a Yun - Northampton 10/2/2019 'L�4RT a SOAP J - - _— :_7­77— Addition Array lV House Array Owner: Mary Yun and David Sanford Address: 94 Market St Northampton, MA 01060 phone: (413) 537-5793 e-mail: maryyun.architect@gmail.com — System size: DC STC kW: 10.22 Array: (28) LG 365 Neon Modules. 4 rows of five in landscape on SE facing main roof. 1 row of 8 in Addition House portrait on SW facing addition roof Mounting: Ironridge Racking on L 1. feet on Quickfoot bases. See data sheets. rr Roof Structure: See rafter design attached. SE main roof 29'and SW addition roof is 16'. Roofing Material: Asphalt composite. New England Construction Engineering, PLC 436 Campbell Street (NECE) Structural Construction Solutions White River Junction, VT 05001 Jonathan Rugg, P.E. 603-903-9798 j.rugg@NewEnglandConstructionEngineering.com September 12, 2019 Ms. Miira Gates Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street, Suite B Greenfield, MA 01301 Re:Yun &Sanford Residence, Northampton, MA PV Squared Project No. 12350 NECE Project No. 19-001 T-82 Dear Ms. Gates, At your request New England Construction Engineering, PLC(NECE) has reviewed the information that Pioneer Valley PhotoVoltaics Cooperative, Inc. (PV Squared), provided on the roof supporting structure of the Yun and Sanford residence in at 94 Market Street, in Northampton, MA.The purpose of this review was to provide an opinion regarding the roof's ability to support a proposed rooftop mounted Photovoltaic (PV)array. The information that you provided is attached to this letter for reference. You are proposing to erect solar panels on two roof surfaces.These include the original house and an addition. The original house is a two-story,wood framed residence with a gable roof. The roof has a 29- degree pitch. The original house roof is supported by full sawn 2x6 rafters at 24" O.C.These rafters span 9' on the horizontal. Ceiling joists,which connect to the rafters slightly above the top of wall resist the outward end reaction of the rafters on the walls. These ceiling joists impose additional bending on the rafters.Town tax records suggest that the original house was built circa 1900. Based on the age and construction I assume that the walls are balloon framed. For analysis I have assumed #2 Douglas Fir for rafter species and grade.The roof has solid board sheathing that has been overlain with plywood,and asphalt shingles. The addition has a monoslope roof. You have provided an architectural building section of the addition drawn by Mary Yun,Architect, dated July of 2005.The roof has a 4/12 pitch.The roof is supported by 2x12 rafters at 16" O.C. These rafters span approximately 16' on the horizontal.The roof has asphalt shingles. NECE's Analysis included controlling gravity load combinations (snow, and dead load combinations). Lateral loads (wind and seismic)are excluded from this report. Consideration of snow load included both "balanced" and "unbalanced" snow load conditions. Conclusion: Based on the information that you provided, I conclude that,the roof will support your proposed PV array. I base this opinion the assumptions discussed above and the following additional assumptions. I New England Construction Engineering, PLC PV Squared—Yun & Sanford Residence Jonathan Rugg, P.E. Northampton, MA Page 2 of 2 assume that, owing to their smooth surface,the PV panels will shed snow more readily than the existing asphalt shingles. I assume that snow will be permitted to shed off the main house array(that snow stops will not be employed). I also assume that the addition roof was constructed as shown on the architectural section that you provided. I further assume that PV panels will be installed parallel to the roof, eliminating any additional wind load.The ground snow load (Pg)for Northampton is 40psf. According to information that you provided,the proposed PV panels weigh approximately 2.3 psf. In summary, in my opinion, and predicated on the assumptions and analysis described above,the roof will adequately support your proposed roof mounted PV array. Thank you for the opportunity to assist with this project. If NIECE can be of further assistance, please contact Jonathan Rugg at NECE. Sincerely, 2��P��Hor M4 sS4. 7 7 JONATHAN A m o RUGG No. 5982 /jo�athan Rugg, P.E. New England Construction Engineering, PLC. /20 9 Attachments: -Building information snug 1X10 Q :���"'O , a ea. 2X6 Full Dimension PV barb mar 24" OC \ 311 Greenflda MSuite 01 deeignepvequared.coop 2X8 Full Dimension /Sg., 413-772-6788 Joe: Yun — Sanford Residence SITE: 94 Market St Northampton, MA 01060 a 168" ` REVISION& 218 TITLE: Framing MODULE SPECIFICATIONS: FDNB 12350 Make & Model: LG ———— Clamp Range: 7-7/8" to 15-3/4" on long side DA up to 4-5/8" on short side DATE: e/22/2019 1e Module Size: 66-15/16" x 40" x 1-9/16" (40mm) SCALE: 3/6' - 1- RAIL SPECIFICATIONS SIZE: 6-1/2•x 11' Make & Model: Ironridge XR100 Clamp Torque: 80 in—lbs L—Foot Torque: 250 in—lbs PV- 02 Max Span: Max Cantilever:" (Sheet 2 of 2) 20 1A A T R00r SHN¢L5 w J15 w MYL A A'RMI SKAiHMG Y M»v¢ 1r rxa>w M 4� rrrt euro w/1a r/GM aH GrBIB ntv. 2.12 Tav7D�1a'oc .Spm VW Ac 1Rw2 r 1•-e No 1Nsu. r' EDa Z � ---------• ---- -- 1A!IW n' .50®m 50E70 1fNf I/2-PID - > W=D DONN LIGHT.. �Y KIR /2-PL 9rtAi C ,Amo ow O20 MSUU UN Z U wsoa s1N1a (2 Z w /2'G'wB of s DrG IIJOE corsrRUGraN 0 w < MTCH AS IFLUPED G ROOT CON51R1C110N; Q K f NEW BEDROOM MA]1/6 K0. >j tn 2.10 J061 WEAE0 A Dr'G(OR MK) Q 0 FO UiZ W / O�w •� Df c UG Q a PULL 2 V WOS Z LnZ[CO Ex1'G J Cxr'G DTG p m VI SCREENED PORCH I7 H SCREENED PORCH 1 G SUB DH CNLE [ATG rkM ■M ON OVAK C PIH.LW 1Ni1 07 DTG O15E1[N1 t..sro BUILDING SECTION PERMIT SET A6 i 7/!--1'-0- PROJECT INFORMATION: " SQUq 4110 • Owner: Mary Yun 4y a *10 David Sanford � Address: 94 Market Street s Northampton, MA 01060 • PV Squared Solar Phone: 413-537-5793 311 Wells Street,Suite B Greenfield,MA 01301 • Email: maryyun.architect@gmail.com design@pvsquared.coop dsanford@mtholyoke.edu 413-772-8788 • System Size: 10.22 kW DC-STC JOB: Yun • Modules: LG LG365Q1C-A5 SITE: 94 Market Street • Rail: Iron ridge XR100 Northampton,MA 01060 • Bases: Ecofasten Quikfoot(Addition) REVISIONS: Ecofasten ECO-44R-NDD(House) • Snow Load: 40 lbs • Wind Speed: 117 mph Addition House ROOF STRUCTURE: Site Plan A No Scale • House: 29°2x6 rafters @ 24"OC • Addition: 16°2x12 rafters @ 16"OC Description Item Qty- ROOF tyROOF MATERIAL: EF-44R-SS EFL-44R-NDD 8-hole SS Base 40 EFL-44R-1214-BLK EFL-44R-NDD 8-hole Flashing Black 40 • Asphalt shingles throughout XHDO02B 2in Extra Heavy Duty Roofing screw 320 QF-AL-M QuikFoot AL Base 16 PROJECT NOTES: QFL-BLK-812 QuikFoot Flashing BLACK 16 1. Framing location to be verified on site. GRKRSS2 5/16x3-1/8in fastener 32 2. Slide rail assembly as needed to avoid SCL-101-3-ANODZD Slotted L-Foot 3in BLACK 56 interfering with splices or bases. PROFLEX26100 GEO-CEL clear 9 TITLE Site Plan 3. Unless otherwise noted bases are staggered XRL100-168BLK Ironridge XR100 Rail 168 BLACK 14 ---- and spaced not more than 48" O.C. SPLIC2 Ironridge XR100 Splice 2 4. Additional or alternative bases may be used to UFO-CL-001-B Ironridge Universal Module Clamp BLACK 68 FDN#: 12350 meet actual roof conditions. UFO-STP-40MM-B Stopper Ironridge Sto er Sleeve 40mm BLACK 24 BY: JG XR100ENDCAP (1 Pair L/R) IR XR100 End Cap Rail 12 DATE: 10/1/2019 IRN 29-50TB-005 1/4-20 x 3/4 T-Bolt OPT mount kiT 28 SCALE: No Scale IRN GD-LUG-003 Ironridge Low Profile Grounding Lug 6 SIZE B-1/2"x11 TW029-4000-077 Ironridge Plastic Clip 56 DCS-1307 Wire Management Clip 112 PV-01 B Mechanical Balance of System (MBOS) (Sheet 1 of 2) " goluq R� -,�---* Array 661%6" NOTE:Vertical rail required because Q ^ p attachment flashingwould interfere at ridge with horizontal rail. Is 1�ef II II �.wr • sem`' ;0PV Squared Solar 311 Wells Street,Suite B Greenfield,MA 01301 I I design@pvsquared.coop 413-772-8788 Roof-354" JOB: Yun N Array 335%$' frl N ---- M SITE: 94 Market Street $ Q I I I I = all I I I Northampton,MA01060 41 r'l _� _� _ REVISIONS: LA t I I �° O L r— Q Lai II II II II II II II II II II House: Ecofasten ECO-44R-NDD Addition: Ecofasten Quickfoot fastened to decking. fastened to rafters. - 40" — 15%" Array Layout 15%$" *— — — — I TITLE: Array Layout 73/$" -- RAIL SPECIFICATIONS FDN#: 12350 Make&Model: Ironridge XR100 Clamp Torque: 80 in-lbs I 1 L I BY: JG I. ) L-Foot Torque: 250 in-lbs — — — DATE: 10/1/2019 Max Span: 65" 1 I I I _ _ _ SCALE: As Shown Max Cantilever: 21" 19/6' SIZE: 8-1/2^x11^ MODULE SPECIFICATIONS: _ 661/6„ _ o (40mm) Make&Model: LG LG365Q1C-A5 ^` ,_O� Clamp Range: 7-7/8"to 15-3/4"on long side r v up to 4-5/8"on short side LG365Q1 C-A5 Dimensions Module Size: 66-15/16"x 40"x 1-9/16"(40mm) B 1/4^=1'-0^ (Sheet 2 of 2) R, LG N ONOR A a •, t a. LG365Q1C-A5 I LG360Q1C-A5 I LG355Q1C-A5 I LG350Q1C-A5 365W 1 360W I 355W 1 350W LG NeON® R is new powerful product with global top level perfor- mance. Applied new cell structure without electrodes on the front, LG NeON° R maximized the utilization of light and enhanced its reliability. LG NeON®R demonstrates LG's efforts to increase customer's values beyond efficiency.It features enhanced warranty,durability,performance under real en- vironment,and aesthetic design suitable for roofs. wE C ��O US CC � Feature Enhanced Performance Warranty Extended Product Warranty IE! 25y LG NeONO R has an enhanced performance LG has extended the product warranty of the warranty. LG NeON®R to 25 years which is top level of After 25 years,LG NeON°R is guaranteed at the industry. least 88.4%of initial performance. * Aesthetic Roof High Power Output LG NeON°R has been designed with The LG NeON®R has been designed to aesthetics in mind:no electrode on the front significantly enhance its output making it that makes new product more aesthetic.LG efficient even in limited space. NeON®R can increase the value of a property with its modern design. Better Performance on a Sunny Day Outstanding Durability -= LG NeON°R now performs better on a sunny , With its newly reinforced frame design, LG days thanks to its improved temperature NeON®R can endure a front load up to 6000 coefficient. Pa,and a rear load up to 5400 Pa. About LG Electronics LG Electronics is a global big player,committed to expanding its operations with the solar market.The company first embarked on a solar energy source research program (qLG in 1985,supported by LG Group's vast experience in the semi-conductor,LCD,chemistry and materials industries.In 2010,LG Solar successfully released its first MonoX^ series to the market,which is now available in 32 countries.The NeON°(previous.MonoX•NeON),NeON02,NeONO2 SiFacial won the"Intersolar AWARD"in 2013,2015 and 2016,which demonstrates LG Solar's lead,innovation and commitment to the industry LG NeON® R LG365Q1C-A5 I LG360Q1C-A5 I LG355Q1C-A5 I LG350Q1C-A5 Mechanical Properties Electrical Properties(STC*) Cells 5 x 10 Model 1.1336501C-AS LG360QIC-AS LG355Q1C-AS-1b350Q1C.A5 'Cell Vendor LG Maximum Power(Pmax) [W] 365 360 355 350 Cell Type ! Monocrystallme/N-type MPP Voltage(Vmpp) [V] 36.7 i 36.5 36.3 36.1 Cell Dimensions j 161.7 x 161.7 mm/6lnches MPP Current(Impp) [A] 9.95 j. 997 9.79 9.70 Dimensions(L x W x H) _ 1,700 x 1,016 x 40 mm Open Circuit Voltage(Voc) [V] 42.8LL 42 7 42.7 42.7 __ _ 66.93 x 40.0 x 1.57 in Short Circuit Current(Isc) [A] 1080 1 10.79 10.78 10.77 _Front Load _ - 6,000Pa/125 psf* Module Efficiency [%] 211 120.8 20.6 20.3 Rear Load - 5 40OPa/113 psf* Operating Temperature ['C] --40-+90 Weight _ _ 18.5 kg/40.79 Ib Maximum System Voltage [V] - - 1,000(UL/IEC) Connector Type MC4(MC),05-8(Renhe) Maximum Series Fuse Rating [A] 20 .Junction Box 1P68 with 3 Bypass Diodes Power Tolerance 1 [%] 0-3 3 Cables - .. .. - 1,000 mm x 2 ea/39.37 in x 2 ea The nameplate power output is measured and determined by LG Electronics at its sole and absolute Glass - - High Transmission Tempered Glass discretion. •STC(Standard Test Condition):Irradiance 1000 W/m',Cell Temperature 25•C,AM 1.5 F1 an � �� Anodized Aluminium •Please reser to the installation manual for the details Certifications and Warren Electrical Properties(NOCT) Model f LG36WC-AS 1G360Q1t-AS LG355Q1C-AS IG350Q1GA5 IEC 61215,IEC 61730-1/-2 u m -- { _ _ Maximum Power(Pmax) [VV] 275 271 267 - _-264 UL 1703 MPP Voltage 9e(VrnPD) �. - '[V'] 36.6 36.4 t--36.2 36.0 _. Certifications J IEC 61701(Salt mist corrosion test) MPP Current(Impp) - [A] 7.51 7.45 7.39 732 IEC 62716(Ammonia corrosion test) Open Circuit Voltage(Voc) [V]. 40.2 40.2 40.2 40.1 ISO 9001 Short Circuit Current(Ix) [A] 8.70 8.69 8.68 8.67 Module Fire Performance - Type 1(UL 1703) •NOCT(Nominal Operating Cell Temperature):Imdiance 800 W/m°,ambient temperature 20 Fire RatingI Class C(ULC/ORD C1703,IEC 61730) wind speed 1 m/s Pmduct Warranty 25 years Output Warranty of Prolix - Unear Warranty'. •1)First year 980A,2)After 1st year 0.4%p annual degradation,3)25 years 88.4% Dimensions(mm/inch) •This warranty shall apply to all NeON'R modules manufactured after July 1,2017 Temperature Characteristics NOCT' [ °C] 44 3 3 Pmax I%rC] -0.300 Voc [%PC]! 0.240 1W [%rC] 0.037 Characteristic Curves 1000W iaa U tt00\ eu.Os i- •i AOW .max.•u 400w oae�.:r,n y $$ e. 200W F F' a. ... Voa.ge IV) s .. .. �� � , X 140 S 120 _ &3 100 ...-.--_. 'kC" � 80 t 60. 40 . ..0 Temperature(°C) s -40 -25 0 15 - 50 A The distance between the center of the mounting/grounding holes. LG LG Electronics Inc. Product specifications are subject to change without notice. � Q ® Solar Business Division DS-Q1-60-C-G-F-EN-80517 LG Twin Towers,128 Yeoui-daero,Yeongdeungpo-gu,Seoul 07336,Korea ®2018 LG Electronics.All rights reserved. Lifes Good www.lg-solarcom IRONRIDGE XR100 Rail She Descri #ion / Lengtl Rail Section Properties Property Value Total Cross-Sectional Area 0.582 int .66 Section Modulus (X-axis) 0.297 in' 46 Moment of Inertia (X-axis) 0.390 in" Moment of Inertia (Y-axis) 0.085 in Torsional Constant 0.214 in Polar Moment of Inertia 0.126 in" 1.99 APPROVED MATERIALS: .2;44 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) _I .58 T Clear Part Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132"(11 Feet) 7.50 lbs. Aluminum XR-100-168A XR-100-168B XR100, Rail 168''(14 Feet) 6000-Series 9.55 lbs. XR-100-204A XR-100-204B XR100, Rail 204''(17 Feet) 11.60 lbs. V1.1 IRONRIDGE XR100 Bonded Splice XR-100 RAIL 12.0 1 X R-100-S P LC-BD KIT, XR100 BONDED SPLICE � 2 1) Splice, XR100, Mill 12" long 2) Screw, Self Drilling 1.24 63 1.93 .31 0.42 .15 �— .93 #12-14 TYPE "B"THREAD Property Value Property Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish Clear v1.0 Z OuikFootPRODUCT GUIDE Exploded Product View/B.O.M. - 1 Installation Instructions - 2 _ Cut Sheets -3 Specifications -4 +, CL + V) Ii �r 'I ' a EcoFasten solar v QuikFoot— Product Guide Exploded Product View, Bill of Materials Materials Needed for Assembly 7 Item No. Description of Material/Part Quantity 1 QuikFoot Base Plate 1 2 Fastener(Length to be determined) 2 3 QuikFoot Flashing 1 4 EPDM Washer 1 5 L-102-3"Bracket*(other options available) 1 !� 6 5/16"EPDM Bonded 18.8 SS Washer 1 7 3/8"Stainless Steel Hex Nut 1 3 Required Tools w 2 0 V 1 W 877-859-3947 EcoFasten Solar-'All content protected under copyright.All rights reserved.10/09/14 t.t EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 132 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 132 8,245,454 132 8,272,174 132 8,225,557 132 QuikFoot— Product Guide Cut Sheets: QF-AL-Base 2X 0 .33in [8.38mm] O E E O 7 M N LO O N V) 00 CD u u 0 w O 1 .50in [� V [38.1Omm] 3/8"-16 Stud E E E c E o ''0r-Ir? o u u QF-M : 1 .5" QF-L : 1 .75" 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved.10/09/14 3.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 QuikFoot— Product Guide Cut Sheets: QFL-812 R.38in [9.53mm] .032in [0.81 mm] r� V1 12.00in [304.80mm] w 0 3.00in [76.20mm] sa„p►�«, .50in 8.00in [ 12.70mm] [203.20mm] 877-859-3947 EcoFasten Solar-All content protected under copyright.All rights reserved.10/09/14 3.2 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 QuikFoot— Product Guide Cut Sheets: Bracket Options-SCL-101-3 I 3/8" 46 SERRATIONS O LO 1 7/8 R1/16" 114" co 3/4,. � 1/16" R.005 R.010 r� 2X R.O1 ©► 60.00 + 006 0 3/8' -.002 /8„-.002 '1/ 1/8" Q' 0 7/8" X 82° CAA s i I �-877-859-3947 EcoFasten Solaro'All content protected under copyright.All rights reserved.10/09/14 3.7 i EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 82 8,153,700 132 8,181,398 62 8,166,713 132 8,146,299 62 8,209,914 B2 8,245,454 62 8,272,174 132 8,225,557 B2 i Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 553 through SS60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work, earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List,ordering o Daily check-in o Customer interaction and training activities 5 n u,q 4 PV Squared Solar I www.pvsquared.coop Phone:413-772-8788 J Fax:413-772-8668 311 Wells St., Ste. B I Greenfield,MA 01301 S�"AT So�P MA Elec.Lic.A13764 SMA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager