16B-001 Bear Hill Estates Permit Stormwater permitCity of Northampton Department of Public Works STORMWATER MANAGEMENT PERMIT Amendment to Permit Project / Site Name: Bear Hill Estates (previously Warner Hill Estates) Project Street or Location / Assessor ID: Bridge Road / 1613/001 Current Owner Name: Ziter Saloomey, Saloomey Construction, Inc. Current Owner Address/Phone: P.O. Box 1203 Westfield, MA 01086 / 413 - 259 -4360 Date of Original Permit Decision: 3/17/2005 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION FOR AN AMENDMENT OF AN ACTIVE PERMIT BASED ON INFORMATION PRESENTED: Approval of the Stormwater Management Permit Amendment. X Approval of the Stormwater Management Permit Amendment subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Amendment based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development of the proposed West Street Parking Area shall be conducted in strict accordance with the previously approved plans and information as referenced in the Stormwater Management Permit issued by the Northampton.Department of Public Works (DPW) on 3/17/2005 and as amended by the following plans and information and as amended by any conditions attached to this permit amendment. a. Drainage Modification Plan, Bear Hill Estates, Bridge Rd., Northampton, MA, Sheet SK1, dated 5/17/2010 and revised 11/12/2010, prepared and `'stamped by Mark B. Darnold, P.E., The Berkshire Design Group, Inc. b. Bear Hill Estates, Revisions to Stormwater Management System Modifications with Conservation Restriction, Letter and Drainage Calculations, dated 10/8/2010, prepared by Marc D'Urso, P.E., The Berkshire Design Group, Inc. c. Letter from Ziter Saloomey, Saloomey Construction to Doug McDonald, Northampton DPW, regarding East Detention Basin / Soccer Field, Bear Hill Estates, dated 11/16/2010. M: \Stormwater Permits \Permits_Active \Bridge RoadOear Hill Estates\Bear Hill Estates 1.doc Page 1 of 2 Specific Permit Conditions: 1. The construction and stabilization of the Stormwater Management System Modifications and the soccer field as specified in the approved plan cited above shall proceed according to the schedule outlined in the 11/16/2010 Letter from the owner, Ziter Saloomey cited above. The contractor must install appropriate erosion and sediment control measures during construction to prevent the discharge of sediment to the municipal drainage system. If the work does not proceed according to the specified schedule, the DPW may request a hold on issuance of additional building or occupancy permits until such time as construction and stabilization of the site has been completed to the satisfaction of the DPW. 2. The modified stormwater management system at Bear Hill Estates approved as part of this amendment is designed to correct offsite flooding problems at the JFK Middle School and mitigate and safely convey peak stormwater flows. If, after reconstruction of the stormwater management system at Bear Hill Estates, the flooding problems continue at JFK Middle School or other adjacent properties or roadway, the owner of the Bear Hill Estates Stormwater Mangement System must reassess the functioning and discharge point of the on -site stormwater system. If the stormwater management system at Bear Hill Estates is found to increase stormwater flows or volumes to adjacent properties or to the municipal storm drain system, or otherwise result in negative impacts to adjacent properties resulting from excessive offsite stormwater flows, the owner shall redesign and reconstruct the drainage system to correct these problems to the satisfaction of the DPW. C nature of tr gineer Dat ] V cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development M: \Stormwater Permits \Permits_Active \Bridge Road \Bear Hill Estates \Bear Hill Estates l.doc Page 2 of 2 rI L City of Northampton Department of Public Works STORMWATER MANAGEMENT PERMIT APPLICATION DECISION Project / Site Name: Bear Hill Estates (previously Warner Hill Estates)_ Project Street or Location / Assessor ID: Bridge Road i 1613 /001 Applicant Name: John Chakalos Applicant Address /Phone. 52 Overlook Dr. Windsor CT 06095 / 860 - 688 -5994 Application Submission Date: 2/25/2005 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). Approval of the Stormwater Management Permit Application. X Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: l . All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit, a. Stormwater Management Permit Application Packet including: Application, Site Locus Map, Draft Stormwater Pollution Prevention Plan for Warner Hill Estates dated 2122105 by Berkshire Design Group, Inc., Drainage Analysis and Report for Warner Hill Estates dated 1/10105 by Berkshire Design Group, Inc. b. Warner Hill Estates Erosion and Sediment Control Plans, Sheets 1 & 2 dated 2/22/05 by Berkshire Design Group, Inc. E: stormwater Permits\stormwater Permits'Termits Page] of 3 — ��cw application dgc Road -Bear Hill Estates doe IME • Bear Hill Estates Site Plans, Sheets L1 to L10 dated 3111105 by Berkshire Design Group, Inc. 2. The Northampton Department of Public Works (DPW) or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. Annual Reports that are stamped by a Registered Professional Engineer documenting the actions completed as required by the Operation, Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by November 1st of each year. 4. If construction of the proposed stonnwater system has not started within five years of the issue date of this permit, then the permit will expire and a new permit will be required. Construction is defined as clearing, grading, excavation, filling, and installation of drainage structures on the lots specified in this permit. Specific Permit Conditions: Prior to issuance of a building pennit, the applicant shall record an executed Stonnwater Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds. This agreement shall be signed by the applicant and approved by the Northampton DPW. Section 22 -85 of the Northampton Stonnwater Management Ordinance provides additional guidance for the requirements of this agreement. The Northampton DPW will supply a template to the applicant for this agreement if necessary. 2. The Operation, Maintenance, and Inspection Agreement shall include additional requirements that the owner provide documentation that the two retention /detention basins and the subsurface infiltration trench continue to function as designed. Regular inspection and maintenance of the infiltration trench shall be included in the Stormwater Operation, Maintenance, and Inspection Agreement. In order to inspect the infiltration trench, two observation wells shall be installed to deternine how quickly the infiltration trench drains after a storn. Ponded water inside the infiltration trench (as visible from the observation well) or in the retention basins after 48 hours or several days can indicate that the bottom of the trench or basins is clogged. The owner is required to repair, replace, or reconstruct the basins or infiltration trench if they fail to operate as designed. A system fails to operate as designed when water is standing 48 hours or longer following a storm event greater than 1 inch over 24 hours. The applicant shall submit to the Northampton DPW, within 30 days of the issuance of this pennit, revised plans specifying the installation of two observation wells in the infiltration trench as mentioned above. The observation wells should be perforated PVC pipe, 4 -6" diameter, extending to the bottom of the gravel bed where they are connected E; Permits\Stormwater Permits \Pennits new applications \Bridge Road - Bear Hill Estates.doc Page 2 of 3 to a foot plate. The observation wells should be capped and locked r p event vandalism or tampering. e to 4. The applicant shall submit to the Northampton DPW, within 30 days this permit, revised plans that give the exact specifications of the three chambers (STWC #1 -3 as shown on Sheet L4 of the s' °f the issuance of size of these structures has been determined to remove total storm site plans) and document t how ow the rate stated in the Drainage Analysis and Report. suspended solids at the 80% 5. This project will be required to submit one or more Notice of Intent EPA for coverage under the NPDES Stonnwater Construct ion Gener al Stormwater Pollution Prevention Plan � must l Pe rmit. A to the U.S. Copies of both the NOI and the final S(SWP shall be a Pe (SWppp be finalized and implemented. DPW prior to issuance of a building submitted to the Northampton Northampton DPW and may need o b a needed to the satisfaction be reviewed by the DPW' of the Northampton 6• The applicant shall be required to apply DPW to connect to the municipal s orrm drain separate permit from the Northampton Signature of City gineer Date cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development Page rn�water Pennits�Stonnwater Penn itsv Perm its new a ications`Brid =e Road - Page 3 of 3 PP l Bear Hill Estates.doc