Loading...
11A-055 (4) 17 VILLONE DR BP-2019-1333 GIs s: COMMONWEALTH OF MASSACHUSETTS Mau:Block: I]A-055 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Buildina DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Category SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permits BP-2019-1333 Proiect s JS-2019-002146 Est.Cost:$36880.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot size(sp. R.): 26920.08 Owner. MCKUSICK ALICE zoning: URA(100V Applicant: PIONEER VALLEY PHOTOVOLTAICS AT: 17 VILLONE DR Applicant Address: Phone: Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON:5/28/2019 0:00.00 TO PERFORM THE FOLLOWING WORK.ROOF MOUNTED SOLAR SYSTEM INSTALLED ACROSS 3 ROOFS WITH AN INVERTER IN THE BASEMENT; 40 PANELS 12.6 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Mouthing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: Houses Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Sigmtare: FeeType: Date Paid: Amount: Building 5/28/20190:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner I �Lfg GL. Department use only City of Northampton status of permit: Building Department Curb Cut/Ddveway Permit I�AY 21 2019 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability orthampton, MA 01080 Two Sets of Structural Plans }IPHPec IONS r. maoapne 41 587-1240 Fax 413-587-1272 PloVSite Plans - Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISHA ONE OR TWO FAMILY DWELLING SECTION 7 -SITE INFORMATION p-,P /� 1.1 Property Address: This section to be completed by office � 17 Villone Dr, Leeds MA 01053 Map� Lot Unit Zone Ovaday District Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Alice McKusick 17 Villone Dr,Leeds MA 01053 Nemo(Pant) Current Mmling Address: 413.834.7254 See attachment (A) Telephone Sgnatwe 2.2 Authorized Anent: Pioneer Valley PhotoVoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Print / Current Madam,Misses: /fy�J 413-772-8788 Signature Ir TebPhone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cast(Dollars)to be Official Use Only completed bpermit applicant 1. Building $13,976 (a)Building Perri Fee 2. Electrical 22,904 111 Estimated Total Cost of Construction from 8 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) S. Fire Protection B. Total=(1 +2+3+4+5) $36,880 Check Number 101 Jv This Swum For Official Use Only Building Permit Number: Data Issued: Signature: 'f Z Building Commissionerllnspectur of Buildings Date ZQUq � qP Phone:413-771-87881 Fax:413-772-8668 311 Welts St,Ste.81 Greenfield,MA 01301 +•yr �o MA Elec.Lic.A137641 MA HOC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA41eadquarters since 2002. PV Squared Is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the Intention of exceeding all safety,electrical,and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering,civil engineering,electricians,construction supervisors, roofers,and their associated helpers. We are a company that values training and education.We make certain that every individual is qualified for the roles and responsibilitles that they assume. It is our policy to pay for the employees travel and training time and cost of the education,including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30,2009 Massachusetts Board of State Examiners of Electricians(BSEE)judgements, and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers,such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager Section 4. ZONING7 At Information Must Be Completed. Permit Can Be Dented Due To Incomplete Info atbn Existing Proposed Required by Zoning Thu column b be WIA in by Building Dcpummt Lot Size —� - - Frontage L --- Setbacks Front j— Side L:= R:= LL R: _ L-1 Rear �� C Building Height O Bldg.Square Footage Open Space Footage (td m®mines bldg&paved XofPuking Spaces -- Fill: xnbwc&. l.. A. Has a Special Permit/Valiance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES,date issued: _ I IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document N B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES,describe size,type and location: D. Are there any proposed changes to or additions of signs Intended for the property? YES O NO O IF YES, describe sin,type and location: E. NII the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a Common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) Now House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors ]] Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [O Siding] Other[= Brief Description of Proposed Work: Installation of Solar Array on southeast and southwest facing roof of the residence Alteration of existing bedroom_Yes_No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement _YM __?-No Plans Attached Roll -Sheet ga.If New house and or addition to existina housing,complete the following: a. Use of building One Family Two Family Omer b. Number of rooms in each family unit. Number of Bathrooms c. is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? I. Method of heating? Fireplaces or Woodstown, Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction I. Is construction within 100 h.o/wetlands?_Yes _No. Is construction within 100 yr. floodplain_Yes_No ]. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION•TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I. Alice McKusick ,as Owner of the subject Property hereby authorize PV Squared to act on my behalf,in all matters relative to work authorized by this building permit application. 5/13/2019 signature M oiwer Dare 1. PV Squared ,as fwneNAuthorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under tiro pains and penalties of perjury. Chris Krezmieln Pike Nome _ 5/13/2019 Sgree,re of O~Agwe Dee, SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction SuoarWaor. Not Applicable ❑ Name of License Holder: Daniel Gomez Gonzalez CS-111266 License Number 43 Hatfield Street . Northampton MA 01060 03/14/2021 Address EmIratlon Date 413-772-8788 Signature Telephone 9. Registered Homo Improvement Contractor: Not Applicable ❑ Pioneer Valley Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Wells Street, Suite B. Greenfield, MA. 01301 09/15/2019 Address Expiration Date Telephone 413-772-8766 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(Ill C.162,II 211 Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached yes....... 0 No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended m include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 1083.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shag not be considered s homeowner. Such"homeowner'shal I submit to the Building Oficial,on a form acceptable to the Building Official,that he/she shall be resoornible for all such work Performed under the building Permit As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General laws Annotated,You may be liable for person(s) you hire to perform work for you under this permit The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature ATTACHMENT A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Pmject as set out above,and I agree to pay the contract price according to the Terms of Payment I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement I hereby authorize Pioneer Valley PhotoVoltalu Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow arty photographs or videos of this project to be used by Pioneer Valley PhotoVoltsics Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. AI:[e ):Ck Printed Name Date 59 even Title - P,., nWrnd Nrnm aM14271 P.,]0113 N McKusick NurrmMr 1},}019 Commonwealth of Massachusetts Division ❑t Professional Licensure Board of Budding Regulations and Standards Construction Supervisor CS-111266 Expires 03/1412021 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060 Commissioner Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Typo. Supplement Card PIORe9isvatIM 1400]) 311 WELLS ST SUPHGTGVGETAICS COOS E�mWn: 09/15=19 311 WELLS of SURE 0 GREENFIEIb,MA 01301 UN.I.Mdren eM Rewrn LGd. OINK MConwwr EME 4 a ONTR P.Oublbn IbMF ITYPE:S EN CaO d4CTOP WW.Mien vaY for ln0lvl ff au[d oMy TYPE:Simkmptl CaG M. 1 apnnlen tt*. . S. .nvm ro 9AIEktl100 10 Pwk §-Su e5170 Meuvrne.s Reguln�en 14WC ACS=19COO 1a P_n.R4.-suNano PIONEER VALLEY PIgTOVOLTAICSL0OP BMOIL M� d 116 1 CHRISTOPHER"EMNEN 311 WELLS ST SUITE e GREENFIELD.MA 01331 Undersecretary Ndt valid wltb0 nature The Commonwealth of Massachusetts Department of Industrial Accidents I Congress Streets Smile 100 Boston,MA 02114-2017 www mass gosydia IV\\brkers'Compensation Insurance Affidavit:Builders/Contractors/ElecMcians/Plumbcm. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Leaibly Name(BusineWOr,morstionlndividua0:Pioneer Valley PhotoVolteics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employee Check the appropriate boa: Type of pmject(required): LE)l an a=player with 48 employees(fell mdlor part-time).' 7. ❑New construction 2,oi mawlcproprietarwpm,erahipaM venoengloyewwmking garment g. ❑Remodeling my capacity.[No workers'comp.insurance required.] 3M an a honamwmer doing all work myself.[No workers'wrap.insurance required.]t 9. ❑Demolition 4.❑1 an a homeowner and will be hiring contractors m conduct all work on on, nopaay. 1 will 10❑Building addition unsure that all comracmrs citbeer have worker'comsencemon insurance or am sole 1L❑Electrical repairs or additions pmpncuss with no ens leyecs. 12.❑Plumbing repairs or additions SC]new gmemlcantmetoreemplohave ehired and have workers'crs, insursted on the attached sheet. 13.E]Roof airs Them cub-contrecmre have employees and love workers comp.imurencea � 6.❑Weare ac,willw handiboiFcenhaveexercised tho right urexemptionper MGL c. 14.mother Solar PV 132,41(4),ad we have m employe.[No workers'warp.insurance requirea.] •Any appliemt Net checks has#1 most also fill cot the section below showing their workersecan,w ssfien policy information. I Hemwwncrs who submit this affidavit indicating they are doing all work and then him outside contractors most submit a new amchoen indicating inch. tComramnrs that check this box most attached an additional sheet showing the name of the sub-eonrcecmn and sem whether or not those amities hove employees. If the wbwntactors have employees,thr,must provide their workemti comp,policy number. I am an employer that is providing workers'compensation insurance for my employees Below is the policy andjob site information. Insurance Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lic.#:SKS67072282 Expiration Date:01/01/2020 Job Site Address: 17 Villone Or City/Sete/Zip:Leeds MA 01053 Attach a copy of the workers'compensation policy declaration page(showing the poffcy number and expiration date). failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. 7 do hereby c r(fre a' s ndpenalties ofperjuy that the information provided above is true and correct. Sime Date: 5/13/2019 Phone#: 413-772-87h8 Official use on/v. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector b.Other Contact Person: Phone#: ACORO° CERTIFICATE OF LIABILITY INSURANCE Dare1-Nmpmvrl 12/2812018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: H the carURcata holder is an ADDITIONAL INSURED,UY pollcy(les)must have ADDITIONAL INSURED provisions or be endorsed. H SUBROGATION IS WANED,subject to the terms and conditions oI the policy,certain policies may rapuhs an Endorsement, A statement on this camncate time not Confer rights to the cemgcate holder In bee of such encorssmen s. PRODUCER NAME: LIM.PGrtla.CRIS Webber B Grinnell PxONE (d13)586-0111 (f13)BS66E81 8 NOM KPW Steel AouREee: IPwwls®webberaMpinnall.rom INSU AFFORDINGCOYERAGE xam, NoMempicn MA 01080 INSURER,: OhMCastraltylLlbRy 2014 INSURED W9uRERe Ohl.SeaskyllbKy 2d0B2 Pioneer Malay Phnovollaics Cooperative.Inc. saw.D. commnal IMater yAUW Ahn:pm wnldlam WwRERo: 311 Web Street.SuRe a MMMFRE: Grserdield MA 01301 .a l: COVERAGES CERTIFICATE NUMBER: Master ENpl-2020 REVISION NUMBER: THIS ISTD CERTIFYTHAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMEDABOVE FORTHE POLICY PERIOD INDICATED. NOTMTHSTANDINGANY REQUIREMENT,TERM OR CONDITION OFANYCONNtACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE IMY BE ISSUED OR 1MY PERTAIN.THE INSURANCEAFFOROEO BYTHE POLICIES DESCMBED HEREIN IS SUWECTTOALL THE TERMS, EXCLUSIONSAND CONODIONS OF SUCH POLICIES.LIMITS SHOWN MAY NAVE BEEN REDUCED BYPAIDCLAIMS. LIR TYPEOFIN.E samq/Or YNIER Wls cMAMBICYLGE1EAaL WMOrr EACH OCCURRENCE a 7.(b.M CWMSAMDE ®OCCUR pREMI5E9 3 300'01)) MEDEXp an ens 3 5•ODO A BK55]0]22B2 01N112019 D1IDt13020 pERSCNALBAwaMIM 3 1,000.000 cwtADOREGAE WITAPRIEspw GENERN-AGGRS". E 2.00,000 IwLKr❑ 7M ❑Loc PRoacrs-cow,opAoc E 2.00000 O ER: s AU BILE UAMUTY .�mlNED Ix L U s 1.000,000 BODIL IN1UFY(PsrPNU11B0IWYAUTO oeNEn SCHEDULED N55]0]2202 01,1112019 01DIMM BODRVINJURvtRRWeNaI 3 AUTESCra.r OTOS HPEDNON NEo PERrY 3 AUTm Crlr AVIOSGNLv $11(col $IKmmp UndednsumU mumriM IN s 380.00 wMELSAIMa occur EACNacURAENCE s SIXI Do A ENCEISUae CWM9MApE US05]0]2282 DIMM19 01DM2140 AOGRSOATE 3,800,000 OED I I RETESMON I $ WONmrscoxPwua Prw+ .EMPLOYERSuaeuW INr PPOPPoETg4PMMEPhl1ECU11VE YIN El FACXApGIDwT S 1.000.000 D CFFN KrMI ABEREXCLUCED? O xIA MMIfBDMYR ovalmt9 g1AVM0 E1.GISEASE. EAVNPUWEE s 1.000,000 OBSCRrrob Rax 1.000.000 DESCRIRNRI OF OPEMTgNS EMw Bunnness Far Pno rty 3 CommemMl Pmparry Business Pere Pmperiy S5,75D000 A BNS5]0]2282MYR 0710112019 01101020 Installation 350,000 Transporation S75,000 111CRPTEMOF.SIUM URNSIVEHICU tAGMD101.AaaWYMW WYOY.MbFafIMaMSFpfaYIFYYMI Worker 5 Compensstlm neWes Me,CT and!NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence pi Insurance ACCOROAROE WITH THE POLICY PROVISIONS. AUTHORIZED REPRE5ERTANVE �/d /L 01NS-2076 ACORD CORPORATION. All rights rws wd. ACORD 25(2016103) The ACORD name and logo are registered marks OIACORD y rw � a r" � t PROJECT INFORMATION: B0 u4 H • Owner. Al McKusick • Address: 17 Villone Drive Leeds,MA 01053 �•��// •� • Phone: 413-8347254 w sa�a.ea J11we4 s • Email: amekusiekl9@gmaiLeom ,e. enReKm..nDI e 0 mm+ des,,@p,a,m.mep • System Size: 12.8 kW DC-STC 413-n24M • Modules: Hanwha Q.Peak DUO-GS.320 a ioe: McKusick • Rail: Ironridge XR1 DO • Bases: Ecofasten Quickfoot sm nvam,e D. &Ecofasten Simplegrip ie Worm • Snow Load: 40 lbs RMIONS • Wind Speed: 117 mph +. Revuce Rec modmes wlm • Q.ReaY. ROOF STRUCTURE: • House:23'rafters @ 16"O.C. • Garage:5"rafters @ 16"O.C. See PE Letter for details ^C, A t�Jan aR ROOF MATERIAL • House:Asphalt Shingles Part Make Model Qty • Garage: EPDM Base Ecofasten Quikfoot SS Flashing Ecofasten Quikfoot 55 PROJECT NOTES: Fastener GRK RSS 5/16"X3.1/8" 110 1. Framing location to be verified on site. Base Ecofasten Simplegrlp 30 2. Slide rail assembly as needed to avoid Flashing Ecofasten Slmplegrip 30 interfering with splices or bases. Fastener OMG#15 XHD 2"w/washer 120 m+c Site Plan 3. Unless otherwise noted bases are staggered L-Foot Ecofasten SCL-101-3 85 _ and spaced not more than 48'O.C. Sealant Geocel 6 4. Additional or alternative bases may be used 1 V XR100 Rail,Black Ironridge XR-100.1326 11 roxr + to meet actual roof conditions. 14'XR100 Rail,Black Ironridge XR-100.1686 12 w Rail Splice Ironridge XR-100.SPLCW1 10 snsaor• Rail Clamp,Black Ironridge UFO-CL-01-B1 96 ' w$e Rail Stopper,Black.32mm Ironridge UFO-STP-32MM-B 32 saz: V .1+- Rail Cap Ironridge XR-1 DO.CAP 16 Optimizer Bolt Ironridge Ml-BHW PV-01 BMechanical Balance of System(MOOS) nRRR+1 wy MODULE SPECIFICATIONS: Make B Model: Hanwha Q.Peak DUO-G5.320 -� # Roof-297" 4 00 V'4A0 Clamp Range: 9-7/8"to 17-5/8"on long side .,r Array 277'/8" e O up to 9-7/8"on short side ^ Module Size: 66-5/16'x 39-3/8"x 1.1/4"(32mm) #- went-93" -�- # I` vent-7433/4" �M11�'f RAIL SPECIFICATIONS „ Make&Model: ironndge XR100 •"T • •' Clamp Torque: 80 in-lbs 1 1 7 (1 4 L-Foot Torque: 250 in-lbs (72117-41�'e" 311 wads so-°"eec�suxee Max Span: 64" m Q.e.�nNe.kum2ol Max Cantilever. 21" 1 o m a9kk�avrswarteseao 0 412.ma2u xw: McKusick snE: 17 a oa. Garage Layout Array centered in roof. c«a4.W 1v33 vile:l Ecofasten Sim le rl fastened to "'oras: P B P 1. ep.c49Ec moalH..m Roof-376" T- decking with(4)OMG#15 XHD 2" Qlnk. w/washer. # Artay73RN2" Ecofasten Quikfoot fastened to rafters with (2)GRK RSS 5/16"X 3-1/8'. 1 ( 1 230 rafWs 17s/s" m � 016"O.0 TME Array Layout 4 (1 7 1 1 wrw. 12202 e x SGIE: W-1'-0• 1}�4"(32mm) SIZE: sirs•:n• may 317%" Array centered between drip edge and #— 39%8" PV-02 ridge and flush with North gable to avoid ^Nouse layout ^Q.Peak DUO-G5.320 Dimensions AOFIa chimney and shade from vents. vn>.rra o 2cr2) Vreeland Design Associates An integrative approach to design engineering and site planning Date: March 2,2019 To: Adam Thurrell Pioneer Valley Photovoltaics Cooperative 311 Wells Street, Suite B Greenfield,MA 01301 From: David Vreeland, P.E. Vreeland Design Associates Re: Alice McKusick, 17 Villone Dr,Leeds, MA: Structural assessment of existing house roofs to support proposed solar arrays. On 2/14/19, 1 conducted a site visit and investigated the existing roof framing in the area of the proposed PV solar panel installations. The origina130'x 341,2-story,contemporary saltbox style house was constructed in 1955.A 16'x 12' kitchen addition was constructed off the south gable end with a 24'x 20' 1-1/2"-story garage attached to the south end of the kitchen addition. 25 PV solar panels are to be installed on the west facing long roof of the main house, 3 solar panels on the west facing roof of the kitchen addition and 12 solar panels on the south facing full shed roof of the garage.The ridge of the main saltbox is located 8'4"from the east exterior wall. A bearing wall is located 8'4"west of the ridge.The west facing rafters between the ridge and bearing wall are 2x4(1-5/8"x 5-5/8") Douglas-fir No.I&Better, installed 16"on-center,spanning 8' at a 5/12 slope.The rafters between the bearing wall and the west exterior wall are 2x6(1-5/8"x 5-5/8") Douglas-fir No.I&Better, installed 16"on-center, spanning 12'-6"at the same 5/12 slope. The kitchen rafters are 2x10 installed 16"on-center,spanning T-T'.The roofing of the main house and kitchen is composite asphalt shingles.The shed roof of the garage is framed with 2x6 rafters installed 16"on-center,spanning 9'-6"at an 1/12 slope. The shed roofing is an EPDM membrane. I have reviewed the mounting details for the proposed array.Based on my calculations and a PV solar panel unit weight of 40f lbs,with the attachment points of the array placed at a maximum of 4' on center and staggered to minimize the load to any one rafter, all the existing roof framing is adequate to support the proposed PV solar army and the snow and wind load requirements of the current MA State Building Code. Please contact me if you have any questions or need additional information. Sincerely, �ytu OFki a� EELANO z �/ DAVID N. f( VRCIVIL CIVIL David Vreeland,PE No.48317 Vreeland Design Associates 1 116 River Road, Leyden, MA 01337 Phone: (413)624-0126 Email: dvreeland@verizon.net Fax: (413) 624-3282 ,�r�r Duo 4 aorn.rory a+r.n...a set 70U 7019 to.muse. CYCLONE TESTING • STAT70N 1 . S lar Power, O.ANTUM TECHNOLOGY:LOW LEVELISED COST OF ELECTRICITY lYo(/ HiB6er YielC per sunecee•ee.bxerBOS mals,N91w power clasws,entl en enlciency rete of up ro 20.2%. INNOVATIVE ALL-WEATHER TECHNOLOGY {/J�` OptlmM Yiepo,wfietever Me weeMerwM exrelaM low-IigM end lempereture beMNcur. P yy_ ENDURING HIGH PERFORMANCE + i 0 Lor,-term yieb eecurily wlM AM LID TechnobgY AM PID Technobgy'.HN.Spot Protect end Traceable G u,11hy Tre O^x. Y._ y. EXTREME WEATHER RATING sILT'4M�JE H,Mtxbelliminumeby hems. at tea MaexMme in pudrelie air sVellen brs et Cordit James Cook UNYAHitY Cyc Testir,Stenon. A RELIABLE INVESTMENT Incbslye 12-year product warranty aW 26-year lirwr perbrmelKe wener%y'. STATE OF THE ART MODULE TECHNOLOGY 0 ANTUM DUO cormines cNtN,adge o NFeWim eM Yln MibYe wirii,wiVi OAKUM Technology. 4R IMcw40mrwwbpb lEC/R.all.l Are.mWa .,uri0V,'sap Sx 6u Ymr m n�br Nller FMimr�m. THE IDEAL SOLATION FOR: nod�m.i.rsm i . mm.na msmm.ewinnasnnei ��WUUJJJ emuler Lngineered in Germany CELLS MECHANICAL SPECIFICATION FpmN Ia6mm.lDwmm.ummfro,aM°mM WWN 1Bllp. 1 Mco..� asmnm Mae-enneeea ymewun - edHelbc l IecnmkpY ° � ° !e Ir Ca.er Cbrpwnnl e•�errem� F __ Tran e G! le Armn'c yes O°NiVM v°sMw4 Q AMbnCm 64101 ]1.80 .16.18 _ __. e. Ruclbn PoJ wXngya ONu __ _.. u+-0 c 6M4uM8der wllxvpomm lixtlpamm Caxxebr 6NWiMc4,Ivea . L �T�Iee� ELECTRICAL CHARACTERISTICS POWp OLY• - m em aee am M MINIMUM MWORMANCE AI STANDARD TEST WkMION8.SW IPOWER TOLMANCC•6 W/-0 W1 Ramu M11, N,e MI 316 We Y!6 490 aY anmwcuxcuv.m' k W 14W 10W W. w0 Wall EoRencscr,nyW.w' ym M WA? QA3 41140 wm W.@ cmnnln MFy yr W am &80 am an an VOXepa el MR° Vre. M WAS 99.34 3986 33.0 - &.81 __ EllkbroYr 1 IRI e1G1 elaa EIA3 °w Eme MINIMUM PERFORMANCEATWD LWERATIWO NMTONS.NWr P—I.MW Pre• IWI MILS 2806 SIS] We =7 L smno—Ic.. k W NOS 8.13 Ell &U ss own Mrnun valNH Vc M War 3184 3BAe 3634 3460 cun.mn MPP y. W )u 16e NO 164 1.w VaM1 oMPP V— M 3L36 4160 um u31 um �YrwvrrXwerv.-�P�z3i4:yve6aW BIC WONTrr'.Ae35IYllOrmlYbB WOWi-r6W WM.MpL¢w W 180 OQW IMFORYAMGMAMAIIIY IVOYMM11[YLONYBPMMOe �E • _—• uwlpefamMWw+mne- �� �•�� NIMw.IIreMr raLOus �1 -�- --•----' •- -• eee r UgpNYn R•Wer.A1W W.1\ ' tl MXUMFYV Wro IOnnM � - e r • .._......... •r. .FJ�MYeWM Wm r _ rr Y k r r • MiyuNNrr�r.w�vn�m� � m wurwew.s. pNM1,mYYMmedrM r r r r r OCFL9MNMgNnrmd ' • wa r.��Y iWMlrroU.YP�Ip^rM.NUNVMMnMYnMMITn �•w.ri.�.er.�rn •yrpMrb3TC W4•(16tl.100DV11mr1 1WIBAFI6MOBICO110 TNrrR..wncaNneNmw4 R/q MOL inR..lunce.fllcMrnaya< a R11q TMPM•Iun Cpab Vp— 1 VIM y36 xwmel MOCubopreMTEmryreWrE 1MOT ICI 43.3 PROPERTIES FOR SYSTEM DESIGN Mnlmum By.Mm VMge Vm M I SNNYcw.. X .....C. 1. IN -- 10 FWR." C R Mu.0..Ipn Lotl.lu.~ P.1 3BOD13M1 Pum111M Y.GUMTnpenO,r. y0•C-M6•C a Mu.i.0 Lwn.Pu.X/FY - - _.IPe1 640p140M ^^Cmlbuou.OulY QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION VMOWIY➢60,1[CN116:'NIb:IEC 61)]0101fi Cp(tiGMCM4 Numnerol MOGUN.p.,lella. 81 1NOYSMm{YwNrCYi FH 5NR0 Mum6erWPeller.p.r irelMr114N 3fl D� � � xumarwP.IMI.P•r 4Dxcsonunr.rpeq __ a9 I.IMOIm.rkbnal.W.HI IIDII•IlEO.110(Imm PMa WMlM e41ep IMV Mebl4rbXr um.rrW m ILLvetl.SeaMMWrmsn,pmlp,wwMvm.crd.IMnRelrrNce WPv,mem Iw NUr vearmennmpvue.mMrnm YSrMYe• x.nwolsuMeX.R•SIF W 3ub1,lvtl l.l5&ue5nas49Np'.NBW 1LM,Ii,.n[F Il6 rfi1NI1POlBJOJJII.V•33 NW WIBD]V IIWLpcM-nwlreAe'IDR-uMmml'MFxwwq-ctl•mmeu EWIneered In Germany a CELLS rmMm /lam IRONRIDGE XR100 Rail See Descri tion/Length i Rol Section Propertles Propedy Vabe Total Cross-Sectional Am 0.582n Section Moduhn X-ate 0.297Monent of Inertia X-axit 0.390 k? Mornent of Inertia Yam 0.085Torsional Constant 0.214EPolar Moment of lnertio 0.126k FA46 APPROVED MATERIALS: 2.446005-76,6005A-T61,6105-T5.6N01-T6 )34,000 PSI YIELD STRENGTH MINIMUM) Clear Part Block Part Descripibn/Length Material Weight Number Nurber XR-1OD-132A XR-100-132B XRIOD. Rag 132 (11 Feeti A~rr7.50 bs. XR-100.168A XR-100-168B XRIOD.. Ra0168"114 Feetl kjn* r� ies 9.55 bs. XR-10D-204A XR-10D-2D4B XRIOO. RcU "Il7Feetl 11.60 bs. v1.1 /lr IRONRIDGE XR100 Bonded Splice XR-100 RAIL 12.0 1 XR-100•SPLC-BD KIT, XR100 BONDED SPLICE ar 2 1) Splice, XR100, Mill 12" long 2) Screw, Self Drilling 1.24 63 1.93 .31 TEME 0.42 .15 93 #12-14 TYPE'B'THREAD Property ValueProperty Vatue Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish Clear v1.0 V) FF Z Quik FOO 1. PRODUCT GUIDE O Exploded Product View/B.O.M.- 1 Installation Instructions-2 — Cut Sheets-3 r Specifications-4 U a W o � LU w �— ,U,EcoFasten Solar QuikFoot— Product Guide Exploded Product View, Bill of Materials - Materials Needed For Assembly 7 Item No. Description of Material/Part Quantity 6 1 QuikFoot Base Plate 1 t—, 2 Fastener(Length to be determined) 2 5 3 QuikFoot Flashing 1 �y 4 EPDM Washer 1 0 5 L-102-3"Bracket*(other options available) 1 6 5/16"EPDM Bonded 18.8 SS Washer 1 vl 7 3/8"Stainless Steel Hex Nut 1 � 3 Required Tools w z - o W 1 f 877-869-384] EwFaskn 9daPM mO m protected under mpyrlgM.All dgMs reserved,iQ109114 1.1 Em Fut.,Sdarp udaempmlapM by MBfdbw U.S.Ptl ,ft.8,161,52282 8163,700 B2 e.1B1398 B28,166913 B2 9 146298 920.208.914 B28.245454B28272,174 828,225557 B2 QuikFoot— Product Guide Cut Sheets: QF-AL-Base 2X 0.33in [8.38mm] r�0 V1 � E cE LO ® '0 in N OD I� 1.50in O [38.10mm] 3/8"-16 Stud c E ,c E P 10 Cl) Nr ^ P < n QF-M : 1.5" u QF-L : 1.7Y 8]7454396] EooFe nSiler-Alcant 0"edetlui eopftM.A rWftrc3ervetl.laIM10 EfoFWen SOW popkb Ye gdx88 Ey"kkw U.S.Pam 8,151,513838.1".?WB28.181.MW8,1l8,713838.WK B38388.8189t B2054S 828272.174B2822555]B2 QuikFoot— Product Guide Cut Sheets: QFL-812 R.38in [9.53mm .032in r. 0.81 mm � r� 12.00in [304.80mm] u 3.00in [76.20mm] 50in 8.00in _ _ [ 12.70mm] [203.20mm] 877-859-3867 EmFasbn Solar'Pl6pMerRgoleolBtlu reopyrigM.Nlrighlsre0ery 10109/14 - — 32 EwFasOm Sa4rp6 ..pabcYE by BBrlalo U.S.Pa W:8.151.523828,153700 B29,101,39BB28IN 713828,146.28a 528.208,914MSB 5.456028p2.174828,225.557 B2 QuikFoot— Product Guide Cut Sheets: Bracket Options-SCL-101-3 3/8" A 465ERRATIONS M I � � T h � 1 7/8" /� R1/16" 114 60 — 3/4" r— 1/16" / N R.O05 R.010 2X R.OI 60.`00°/ 0 3/8"+'006 Y 1/8' P 7/8" X 820 sDETALat 877-859-3907 EmFasten Solara A6 content prOaded urM copyngN.A4 ngW reserved.ldM14 3.7 EWF SaWp uzare gd byem klaom,11.5.PaM4:0,151,522828,153,700 B28.181.M 826.16,713 B28.146189828.209.914 82 8,246454 02 8.222174 82 8225 557 B2 Foot- Product Guide Specifications RT 1 -GENERAL SUMMARY 1.3 SUBMITTAL WORK INCLUDES A. Submit manufacturer's written specKications. B. Base plate is 6000 series aluminum with one 1. QuikFoot base plate attachment bracket that B. Submit standard product cut sheets. PEM Type Press-In Stud 18.8 SS. attaches directly to the roof deck. C. Submit installation instructions. C. Fasteners t0 be compatible with chosen roof 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values 1.1�rfor me roof system_ ultimate and allowable load values specific to as shown in bad test data. !�� 8. RELATED SECTIONS the roof deck specified for the project. D. Counter flashing is.032 gauge aluminum em- J 1.Section 07600:Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500:Roofing 1.4 QUALITY ASSURANCE plate O 3.Division 1:Administrative and Procedural Installer to be experienced In the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4.Divisi arirmal and Moisture Protection the area of the project. 1.2 SYSTEM DESCRIPTIONA Bracket is mill finish aluminum A COMPONENTS: 1.5 DELIVERY/STORAGE/HANDLING B. Base flashing-Black-kynar painted 1. Quikfoot system consists of aluminum Inspect material upon delivery.Notify manufacturer bracket and base plate with(1)stainless steel within 24 hours of any missing or defective dints PART 3- EXECUTION Keep material dry,covered,and off the ground until stud,(1)stainless steel nut(1)EPDM washer and(1)bonded stainless steel and EPDM installed. 3.1 EXAMINATION washer. A Substrate:Inspect structure on which brackets 2. Fasteners PART 2-PRODUCTS are to be installed and vely rt that it will with- A.To be of metal compatible with QuikFoot stand bracket. 2.1 MANUFACTURER any additional loading that may be incurred, W B Fasteners should be selected for compat- Hanel Sitar 289 Harre ibill[y with the roof deck. 289 l Street Morrisville,ur 05661 B. Nobly General Contractor of any deficiencies O C.Fastener strength should exceed or be (877)859-3947 - before installing EcoFasten Solar brackets. equal to that of the allowable load of the sw A.ecofastensolar.com U em.See test data at C. verify that roofing material has been installed WAA 2.2 MATERIALS correctly prior to installing solar attachment W www ec required by coin bradcetz 3. Sealant(A required by roof manufacturer): A. Attachment Bracket to be roof manufacturer approved. 6000 Series Aluminum(choose one) 3.2 INSTALLATION 4. Aluminum counter-flashing 1.CP-SQ-Slotted A. Comply with architectural drawings and project S. Aluminum attachment bracket 2.F-111-A engineers recommendations for location of y 3.P-3-CSK system.Comply with Manufacturers written in- B. DESIGN REQUIREMENTS: 4.SCL-101-3 stallation Instructions for Installation and layout. 1. Bracket spacing to be recommended by 5.LA 02-3' - project engineer. 6.L-102-6' 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. it is important to design new structures or 8.Custom assess existing structures to make sure that they can withstand retained loads. 877$5&3967 EmFasten Solar AB content lndeCed abates copyrigl8.A1 rilift reserved.IWW14 4.1 Emaabn stlarp vAa an pidxlai by Ne k6wraiiUS.Pai 8.151.523 M 8.153.785 B28.181.398828.186.713828.145.298W8.219.814825245.454828273.174825,225.55782 i 1 A 46 SERRATIONS io I LO T L v I 1 7/8" R1/16" 4" 60 3/4" t� 1/16' R.005 R.010 2X R.01 4 F 60.`00° / 3/8"±.002 Y 1/8 .X = +/- .1 U 7/8" X 820DETAIL ALE 3:1 .XX = +/- .01 .XXX= +/- .005 289 Harrel Street na Morrisville, VT 05661 SCL-101 -3 EcoFasten Solar`p' Toll Free Phone 1.877.859.3947 00 E - - Toll Free Fax 1.888.766.9994 MATERIAL: 6000 SERIES ALUMINUM .4 M V web www.ecofastensolar.com e-mail info(o3ecofastensolaccom SCALE: 1:1 1/6/2012 SHEEP 1 OF 1 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, leamer/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy#9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT#9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Eauioment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy #9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared Installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder setup o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not Including"bonding/grounding related activities' o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work earth moving o Trenching/digging o Construction of racking up to but not Including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Sackers • Power Board o Build wall,hang plywood o Stickers • Interconnection o Stickers • Monitoring o WIfl options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List,ordering o Daily check-in o Customer Interaction and training activities Massachusetts Electric Company&Nantucket Electric Company(d/b/a National Grid) M.D.P.U. 1320 Certificate of Completion for Simplified Process Interconnections Installation Information: ❑ Check if owner-installed Interconnecting Customer:ALICE MCKUSICK Contact Person: Mailing Address: 17 VILLONE DR City:LEEDS State: MA Zip Code:01053-9719 Telephone (Daytime):413.834.7254 (Evening): Facsimile Number: E-Mail Address:amckuslckl 9@9tllall.com Address of Facility(if different from above): Electrical Contractor's Name(if appropriate): PV Squared Mailing Address: 311 WELLS ST. SUITE B City: GREENFIELD State: MA Zip Code: 01301 Telephone(Daytime): 413-772-8768 (Evening): SAME Facsimile Number: 413-772-8668 E-Mail Address: interconnection@pvsquared.coop License number: Al 3764 Date of approval to install Facility granted by National Grid: 1/10/2019 Application ID number: 205209/SMART#27724000 Inspection: The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County): Signed(Local Electrical Wiring Inspector,or attach signed electrical inspection): Name(printed): Date: License#: As a condition of interconnection you are required to send/e-mail a copy of this form along with a copy of the signed electrical permit to National Grid: National Grid Ann: Distributed Generation 40 Sylvan Rd Waltham, MA 02451 E-mail: distributed.eenerationna.nationalerid.com Massachusetts:hru,//www naConaleridus com/masselectr c/home/enera eff/distributed eeneration.aso Nantucket:htto'//www naConaleridus com/nantucket/homc/cneroef/distributed eeneration.aso Page 1 of 1