Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
38B-025 (8)
20 FORT HILL TER BP-2019-1288 GIS a: COMMONWEALTH OF MASSACHUSETTS Milli 38B.025 CITY OF NORTHAMPTON Lot:.001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Cumgory:SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit4 BP-2019-1288 Proiectu JS-2019-002081 Est,Cost:529770.00 F c: $75.9 PERMISSION IS HEREBY GRANTED TO: const Class; Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111286 Lot Size(sp.R.): 4138.20 Owner. BUDDELIZABFIN Zoning;URC(100)/ Applicant: PIONEER VALLEY PHOTOVOLTAICS AT.- 20 FORT HILL TER Applicant Address: P tone: insurance: 311 WELLS ST-SUITE B (413) 772-8788 Workers Comoens ition GREENFIELDMA01301 ISSUED ON.3114/2019 0:00;,00 TO PERFORM THE FOLLOWING WORK.24 ROOF TOP SOLAR PANELS 8.28 KW POST THIS CARD SO IT IS VISIBLE FROM THE STR,FET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footingi: Rough: Rough: HOUR to Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough; 011 Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy signature: FeeTVpe: Date Paid: Amount: Building 5/14/'019040:00 575.00 212 Main Snpm,Phone(413)587-1240,Fax:(413)587.127? Louis Hasbrouck-Building Commissioner I r qw RECEIVED Deparb-nent use City of Northampton Status of Permit: Building Department Curb CuVDnveway Permit 212 Main Street Serer/Septic Availability ZMAY1 Room 100 Water/Well Availability Northampton, MA 01060 Two Sets of Structural Plans n . vvr.T se ne 1&587-1240 Fax 413-587-1272 PlollSite Plans NORTHAMPTA 010 Other$P@Gly APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1-SITE INFORMATION 1.1 Property Address This section to be completed by office 20 Fort Hill Terr, Northampton MA 01060 Map�13 Lot 0-1-5 Unit Zone Owrlay District Elm St District CB District SECTION 2-PROPERTY OW NERSHIPJAUTHORIZED AGENT 2.1 Owner of Record: BUDD ELIZABETH A&SEAN M CONDON 20 Fort Hill Ter Apt 2,Northampton MA 01060 Name(Prim) Current Melling Address: 413.834.4849 See attachment (A) Telephone Signature 2.2 Authorized Agent: Pioneer Valley PhotoVoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Print) /� Current Mailing Adtlress: /frQJ 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by Pennit applicant 1. Building $8,144 (a)Building Permit Fee 2. Electrical 21,626 (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5.Fire Protection 6. Total=(1 +2+3+4+5) $29,770 1 Check Number oy This Section For Official Use Only Data Building Perms[Number. Issued: a Signature: l -t C-1,4 I t 9 Building Commissioner/Inspector of Buildings Data SUUQ -1 AF a®.''O PV Squared Solar) Fax:4sgoared.coop Phone 413-772-87881 Far: I3-772-8668 311 Wells St.Ste.8 j Greenfield.MA 01301 '. MA Elm Lk A13761 j MANIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield,MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations.Our worksite guidelines are created with the intention of exceeding all safety,electrical,and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines,including electrical engineering, structural engineering,civil engineering,electricians, construction supervisors, roofers,and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30,2009 Massachusetts Board of State Examiners of Electricians(BSEE)judgements,and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers,such as CSLs and others. I have attached our Installation policy for your review,as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to Improve on what we do. Respectfully, Adam Thurrell Operations Manager Section 4. ZONING All Information hors[Be Completed. permlt Can Ile Denied Due To Inranplete Information Existing Proposed Required by Zoning Thi.ml.m.h filled in by Building Depamomr �FronLot Sim ` -- -� L ..------- Frontage ta a Setbacks Front O Side L:O R:O L:O R:= 0 Rear 0 Building Height O O Bldg.Square Footage Open Space Footage % (Lot area min.Wit&;rued #of Parkin Spaces Fill: vohme&laarim A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES,date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Pagel I and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: I E. Wil the construction acbdly disturb(cleanng,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over i acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ I Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doon Accessory Bldg. ❑ Demolition ❑ New Signs 10] Decks i0 Siding[[-I] Other(®] Brief Description of Proposed Work: Installation of Solar Panels on Roof of residence with reouired structural reinforcement Alteration of existing bedroom_Yes_No Adding new bedroom Yes x No Attached Narrative Renovating unfinished basement _Yes x No Plans Attached Roll -Sheet ea.H New house and or addition to existing housing, complete the following: a. Use of building:One Famlly Two Family Other b. Number of rooms in each family umt Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance farm attached? h. Type of construction I. Is construction within 100 If of wetlands? Yes No. Is construction within 100 yr. floodplain_Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank_ City Sewer Private well City water Supply SECTION 7s-OWNER AUTHORVATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I. Elizabeth Budd and Sean Condon ,as Owner of the subject property hereby authorize PV Squared to elf on my behalf,In all matters relative to work authorized by this building permit application. See Attachment A 5/6/2019 Sgnst n of Ower Data 1. PV Squared as Ensnar/Auawrized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Chris Krezmietn PrM Nara 5/6/2019 Signature of Owner/Agard Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable D Name of License Helder:Daniel Gomez Gonzalez CS-111266 license Number 43 Hatfield Street . Northampton MA 01060 03/14/2021 Address /A vvul� Expiration Date "°"' -D 413-772-8788 Signature Telephone 9.Registered Home Improvement Contractor: Not Applicable D Pioneer Valley Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Wells Street, Suite B. Greenfield, MA, 01301 09/15/2019 Address Expiration Date Telephone 413-772-8788 SECTION 10.WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.O.L.C.162,§25CS)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... 13 No--- D 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(l) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner 9tH as supervisor.CMR 780, Sixth Edition Section 1083.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year Period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be rresbonsible for all such work Performed under the buildine permit. As acting Construction Supervisor your presence on thejob site will be required from time to time,during and upon completion ofthe work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for persons) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusars General Laws Annotated. Homeowner Signature ATTACHMENT A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT 1 hereby agree to the Project as set out above, and 1 agree to pay the conbact price according to the Terms of Payment. 1 further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. 1 hereby authorize Ploneer Valley PhotoVobala Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Ploneer Valley PhotoVoltala Cooperative, or Its designated representative, to obtain required permits for this project on behalf of the Owner. 1 will allow any photographs or videos of this project to be used by Pioneer Valley PhotWoltala Cooperative for marketing purposes.A check for the First Payment is endorsed and I am returning this Agreement within 21 days of the Proposal date. Elizabeth Budd 2/26/2019 Primed Name Date slipliature Title Sean M Condon 2/26/2019 Printed Name// Date 15 Signature Title Pmpw a APeenw9.#MIW1 Pepe ad 12 WB -Fa q12.2019 Cotnmonweallh of Massachusetts �- Division of Protessronal Licensure Board of Budding Regulations and Standards Construction Supervisor CS-111266 ERplres 0311412021 DANIEL GOMEZ-GONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01060x1 Commissioner 'g✓ Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Type: Supplement Card PIONERegistration, 1400]] 311 WELLS ST SuEY n COOP Expiralmd. WI15=19 Ott WELLS ST SUITE GREENFIELD.MA 01301 UN.I.GEerm arta Rewrn Ged. pnm.a can-un.,an.r.a euvnese P. I.P.. HOME IMPROVEMENT COWRAMP Peglalnlon-141 lorinErvld.h uee only TYPE,S."Cfud panne the evpnallon dale. If found return to RedMrNon EEgrNon OMROI Cone—Affainnnd Buuneee Pe9ulMion '400T7 M"15i2019 10 Perk Plot-Sidle 5110 PIONEER VALLEY PHOTOVOLTAICS COOP Ron—, 0116 I CHRISTOPHER KREZM'EN f+ 311 WELLS ST SUITE B GREENFIELD.MA 01301 -Underaxrefary N Validetitho"nature AC RO O° CERTIFICATE OF LIABILITY INSURANCE vmrzMe THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: N the certificate holder is an ADDITIONAL INSURED,the policylbs)must have ADDITIONAL INSURED prorlelons or be endorsed. N SUBROGATION IS WANED,subject to the terms and conditions IN the policy,certain policies may require an mdpreemem. A statement on than,estrogens does not dealer dghs W the oertllid oe holder In)leu of such endereearent(s). PRooucen NALIE, Unds Porters.CRIS ou WebterItGNmrell vNoxe (413)588-0111 xP: N13)506-6181 B Noah King Street ippnEee, Ipowers�aebberendgrinnellsom NBURE BAIIMDINOdgyEMOE ..1 NMM1ampiM MA 01050 INBURERA: Con Cenailly/LitMy 21071 INDIRED INpMw B: ONo SesumyAbety 2AOB2 Pearson Valley PIDOVdbrp COOparelire,Ind. INSOMn C: Continental andemnityst" AM:Kim PInMMm INM mo: 311 Wi SeeeL SuiteB le ME: Granted MA 01301 IMURM III COVERAGES CERTIFICATENUMBER: MaMh Expl-2020 REVISION NUMBER: THIS IS TO CERRFYTHATTHE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUEDTOTHE INSURED NAMEDAII FOR THE POLICY PERIOD INDICTED. NOTWITHSTANDINGANYREQUIREMENTTEAMMCONDITNNOFANYCw UOlt OT "DOCUMENTWITHRESPECTTOWHICHMM CERDF"M MAYSE ISSUED OR IMY PERTAIN.THE INSURANCEAFFORDED BYTHE POLICIES DESCRIBED HEREIN IS SUB.IECTTO ALLTHE TERMS. IXCLU310NBAND COHDRIpI$OF SUCH POLICIES.UMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Lill TYROFEgU CE POLKI' UMBER mMngIYYYY 110Ia Ce1NlACMLDLI LLMBILRY EACH CCCURREXCE I 1.0001M CWA6ANCE ®OCCUR Esaa31101000 MEOEFP p 5.000 A BM570MU 01N1/201, 01D1/10m pS oNm.A YNA' S 1•�•� DwLAamaruTE L01RAPPree PPn OwERILAGGI✓EWTE { 2.000,000 Parc El M. ❑Lac PRooacrs-wLlNovrao { 2A0D.000 AUMW ILELWX1iY BINED SINGLE LIMIT E tegODDD ANY AUM BODaYINUNY1Perpewd { B CV,NED SOEDLLED eAsSTDTzz52 Willi 01,101(lom BOOILYINDIiYIItr RwYnU s AVMS ONLY AUMB usen NOMovmED RN aVAA AURIS OIILY AUmBMY { 51Kco{ 811(danp UM d.M handed { 300.000 U"N".. N' gCLU1• EACxC IAVAENCE 3.000.000 A wCEasll.V IgE US05TUT2202 O1MIM19 o1AT1/ZO20 AOCREDATE 3.000,000 DED I IRETEAnON S MMERe MMPENMTOI IPw AND EMPLOYMV=IU1Y YIN A ANY RNNYETCRNARINEAiEXECVIhEEL FACXMCIOwT i 1'�•D� C OFICEPAELEEREXUUMM O IIIAWDRBD/NYR 01,101/101, D1A)1/ZDm IM�erYM NI, E1.d5FABE-wEMR E { 1.000.000 { Nyaev4uMw 1,GOg,000 SOF OPFMMM$FLw E1.MSFAREFTADYLaR BWrsss Pers Property 51.]50,000 A CanmRcbl drop" BKS5T0T2282MYR O1111i Oiffil 020 Installation 5501000 TrensponeXon S75,000 DEBCRIPiN)X OOPEMTOIB/LDC.L1OMe IYLIMLLB MCMD 1p1,ACCMMFI MInW kM1Wuh mq ae WaCI,W Xmon yvab,pul,m5 Workers wmpemNi nuude0 Me.CT,and NY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE!EXPIRATION DATE THEREOF,NOME WILL BE DELNERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORR REPRESENTATIVE ©1,862015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks&ACORD The Commonwealth of Massachusetts Department oflnduslrialAecidents I Congress Street,Suite 100 Boston,MA 02114-1017 www-mass.gov/dia WIV,arkers'Compensation Insurance Affidavit:Builders/CootmctorsfElectricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name(easiness/OrganiratioMrdividualy.Pioneer Valley PhotoVoltaim Cooperaflve Inc. DBA PV Squared Solar Address:311 Wells Street,SUSeB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Areyoa ve empbyer?Clark the appropdate box: Type of project(required): LE1 l and a employes with 48 cm loym(fidl voter put4ime).' 7. ❑New construction 2E]I am a whe pmpriemr or paomership and have no ear,loyas working for me in 8. Remodeling my caPu'ay.[No workdi[ands,.insuarme "und.) 301 am a homeowner dote ell worksa If. open'co writhed.]t 1 Demolition p g yea Mow man.inammee rcyu ] 10 Building addition 4.❑tem a homeownerend will behiring continues bconduceell work ed my p sole . Twill tato that all eoo-wm nn eithereitherwo n.m worker compensation insurance,a me sole 11. Electrical repair or additions politician with no cmployas. 12.❑Plumbing repairs or additions 5r3I am a gdwol conbeddr and I have hind the subnonuadans listed on the strutted shat. 13.�ROOF repairs Those,subKaeanand have employees end ham workers'comp.insurance. 14,❑I Other Solar PV b.❑Weam.wandwehvend and indmcershaveo wormetheirrighta named, lin MOL e. 152,41(4),end we have an employcm.Ito workers'camp.inewana raryired.] aAdy applicant that checks box#1 most also 011 not the section below showing their wokere'compensation policy infomation. f Homeowners who sobmit this amdevit indicating they arc doing all work add then him outside corrosion must submit a new of idevlt indicating such. :Contocmn that check this box must attached an additional shed showing the name of the sub<odmec am add auto whether or not thder cmitics have employees. If the subwntradom have employees,they must provide their worm s'comp.policy number. lam an employer that is providing workers'compensaaon insumnre for my employees. Below is the policy and job.site information. Insurance Company Name:Ohio Casualty/Liberty Policy#or Self-ins.Lic.#:BKS57072282 Expiration Date:01/01/2020 Job Site Address:20 Fort Hill Ter, Ci ytSmWZip:Northampton MA 0108 Attach a copy of the workers'compenaatioa policy declaneon page(showing the policy number and expiration date). Failtm,to seem coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to SI,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to 5250.00 a day against the violator.A copy ofthis statement may be forwarded to the Office of investigations of the DIA for insurance coverage verification. 1 do hereby ce ! e arelpermhles ofper4i that the information provided above is true and correct signatu. Date: 5/6/2019 Phone#:413-7 -87 8 Oficial use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: PROJECT INFORMATION: " 9OU,44 • Owner. Se Budd a ^,'* Sean Condon • Address: 20 Fon VIII Terrace �y���� ,•f Northampton,MA 01060 •� • •°� • Phone: (413)834-4849 m wews°,eetsmc.e c,.e°Kele.MRm3m • Email: budd20e@gmaii.com Len%°@p' va,ed.c o smcondonll@gmail.com 41�nzaM • System Size: 8.28 kW DC-STC X1e: Budd • Modules: LG LG360Q1C-A5 sm: zo ron"nrt.•a<. • Rail: Ironridge XR700 eonm�1 O'w • Bases: Ecofasten Quikfoot • RfN 0M Snow Load: 40 lbs • Wind Speed: 117 mph ROOF STRUCTURE: 32°2x6 rafters @ 24'O.C. ROOF MATERIAL nateklan Asphalt Shingles PROJECT NOTES: 1. Framing location to be verified on site. Part Make/Model Qty- 2. Slide rail assembly as needed to avoid interfering with splices or bases. Base Ecofasten Quikfoot 71 3. Unless otherwise noted bases are staggered Flashing Ecofasten Quikfoot 71 and spaced not more than 48"O.C. L-Foot Ecofasten SCL-101-3 71 Site Plan 4. Additional or alternative bases may be used Fastener GRK RSS 5/16"X 3.1/8' 142 _ to meet actual roof conditions. Sealant Geocel 4 11'XRI00 Rail,Black Ironridge XR-100-1328 14 fONr: rzz3: 14'XR100 Rail,Black Ironridge XR-100-1688 9 R� 1c Rail Splice Ironridge XR-100-SPLC-M1 id o"1E x1019 Rall Clamp, Black Ironridge UFO-CL-01-81 56 ' "O$ .J. Rall Stopper,Black,40mm Ironridge UFO-STP-40MM-B 20 :01: 6112-xll' Rail Cap Ilronridge XR-100-CAP 10 Optimizer Bol[ Ilronridge Ml-BHW PV-01 B Mechanical Balance of S em(MBOS) oReert as 9OU4,1, Qa 32.2x6 rafters --}--E a @ 24"O.C. Use blocking or decking Array centered in �'1••� .•J Vent-120" at edges as needed. Southeastern roof. '' • `'� ,�'-- w squared soMr 3++WNhr SupeB Greenfieleid.MA 0130+ �p � deYpeprsAuered[eop N AI}Tt2lBB u JOB: Budd I> 'k (1/214) 3 SM: 20 H41 Ten �6R15/dd„ (1 ')-13 /a (11' 132 c NO awm MA010fi0 m i uvBo s o a o: 141141Y11, ( 1' -132" (11132 ,f Array 4033/16 ` Arra Roof-455" La ut r 4%" , 1%6"(40mm) TMMC Array layout RAIL SPECIFICATIONS - roru: n23z Make&Model: Ironridge XR100 Clamp Torque: 80 in4bs $ L-Foot Torque: 250 in-lbs Max Span: 69" - - - - - - ,� sold: ane••ra• Max Cantilever: 23" sex: e.+rrxn• MODULE SPECIFICATIONS: 0 66+Y,6" — Make&Model: LG LG360Q1 C•A5 Clamp Range: 7-7/8"to 15-3/4"on long side B LN360O1C-A5 Dimensions PV-02 up to 4-5/8'on short side Z� Module Size: 645-15/16"x 40"x 1-9/16"(40mm) 1s 2m2i i New England Construction Engineering, PLC 436 Campbell Street (NECE)Structural Construction Solutions White River Junction, VT 05001 Jonathan Rugg, P.E. 603-903-9798 i.nVgQNe nglandConalrucbonEngin ng,can March 22,2019 Ms. Madeleine Geschwind Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street,Suite B Greenfield, MA 01301 Re: Budd residence, Northampton, MA PV Squared Project No. 12232 NECE Project No. 19-001 T-19 Dear Ms. Geschwind, At your request New England Construction Engineering, PLC(NECE) has reviewed the information that Pioneer Valley PhotoVoltaics Cooperative, Inc.(PV Squared)provided on the roof and supporting structure at the Budd residence,at 20 Fort Hill Terrace,in Northampton, MA.The purpose of this review was to provide an opinion as to the structure's ability to support a proposed rooftop mounted photovoltaic(PV)array.The Information that you provided is attached to this letter for reference. You are proposing to erect PV panels on one side of the roof.The house is a two-story wood framed residence with an unfinished attic.The house measures approximately 24x38.The roof has a 30-degree pitch.The roof is supported by rough sawn rafters measuring approximately 176"xS%".These rafters are spaced approximately 24"O.C.These rafters span approximately 12' on the horizontal.The roof has solid board sheathing and asphalt shingles. NECE's review and analysis included controlling gravity load combination(dead load and snow load). In examining snow loads, both balanced,and unbalanced snow load conditions were considered. Lateral loads(wind and seismic)are excluded from this review. Recommendations: The existing roof rafters are slightly undersized for today's design loads. In order to remedy this, I recommend installing 2x6 rafter ties,approximately 1'-3" below the peak,on each rafter pair. Details for this installation, including fastening requirements,are provided on the attached Rafter Tie Reinforcing Sketch. New England Construction Engineering, PLC PV Squared—Budd Residence Jonathan Rugg, P.E. Northampton, MA Page 2 of 2 Conclusion: Based on the information that you provided, in my opinion, once 2x6 rafter ties are installed on each rafter pair,as discussed above and as shown on the attached Rafter Tie Reinforcement Sketch,the roof will support your proposed PV array. I base this opinion on the following assumptions. I assume that PV panels will be installed parallel to the roof,eliminating any additional wind load. I assume that,owing to their smooth surface,the PV panels will shed snow more readily than the existing asphalt shingles.The ground snow load (Pg)for Northampton is 40psf. According to the information that you have provided,the proposed PV panels weigh approximately 2.3 PA.. In summary, in my opinion,when rafter ties are installed on each rafter pair,as shown on the attached Rafter Tie Reinforcing Sketch, the roof will support your proposed PV array. Thank you for the opportunity to assist with this project. If we can be of further assistance, please contact Jonathan Rugg at NECE. i��te or Wf�+o Sincerely, o= 4 s^ � � onathan Rugg, P. 'q'Cp7Et(<• New England Construction Engineering, PLC. 019 Attachments: -Rafter Tie Reinforcing Sketch -Building Information INSTALL 2.8 RARER TIE. EACH DORMER RARER PAIR. 1'-8-t FASTEN RARER RES TO RAFTER WITH (B) FASTENMASTER 21 HeaELOK SIRUCTURNL WOOD SCREWS EACH M R TYP. E 2e8 RA TIE RAFIEII TIE R5TAt1A11011 SECTKNI tASMNING CONNECT 2KA'RKTER RE TO RKRFS WH (8) FASTENWSTER 2S Nec&OK STRUCTURAL WOOD SCREWS EACH RATTER SK-1 OATS W SQUARED 012093:BUDD RESIDENCE : 3/22/2019 PREVPwREMDmFOR: 20 FORTH HILL TERRACE.NORTHAMPFON. WA SCALE rvOrvE GROJ a9-WI-tl9 PREPARED BY: RAFFER TIE REINFORCING SKETCH NEW ENGLAND CONSTRUCTION ENGINEERING.PLC N ..NEWENGLANDCONSTRUCTIONENGINEERING.COM LGN ON R LG365Q1C-A5 I LG360Q1C-A5 I LG355Q1C-A5 I LG35OQ1C-A5 365W 1 360W I 355W 1 350W LG NeI R is new powerful product with global top level perfor- mance. Applied new cell structure without electrodes on the front, LG NeONO R maximized the utilization of light and enhanced as reliability. LG NeONa R demonstrates LG's efforts to increase customer's values beyond efficiency.It features enhanced warranty,durability,performance under real en- vironment,and aesthetic design suitable for roofs. C(@US Cc [gs "M j4 !14W. Wf4f,..A— Feature Enhanced Performance Warranty Extended Product Warranty LG NeON®R has an enhanced performance LG has extended the product warranty of the warranty. LG NeONe R to 25 years which is top level of After 25 years,LG NeONa R is guaranteed at the industry, least SBA%of initial performance. Aesthetic Roof lI High Power Output LG NeONe R has been designed ova The LG NeONO R has been designed to —- aesthetics m mind:no electrode on the front ` - -- -1 significantly enhance its output making it that makes new product more aesthetic.LG efficient even in limited space. NeONO R can increase the value of a property with its modem design. Better Performance on a Sunny Day --- Outstanding Durability LG NeON®R now performs better on a cannyi, With its newly reinforced frame design, LG days thanks to its improved temperature NeONa R can endure a front load up to 6000 coefficient Pa and a rear load up to 5400 Pa. About IG Electronics 111I.I [,.n. III) n1.a„��,,,��a,.amm.�. ® LG m[aes.•i,,_,i ryLsemsx[ss[,.pm,e.,nq,..mi<me�w.LCn[�emiarvaMnu[M@ma�meeln l0[O.Lsvw:u..,RuIH..Inn[Menu• m[bmrbt Nrc'nm MN6inll[eMm ANON•Ipmvvs.MOM•N,Q'Yf.IMOM},rypl•}&ia[W wnN,lmmpl�>WNg'm 10[},}0[5 M l0[6,,[KnpmmnmmaL45atrsk,lnvx[m X[emu[mmmtb Me[ry LG NeONOR LG365Q1C-AS I LG360QXC AS I LG355Q1C-A5 1 LG350QlC.A5 Mechaniol Rv emacs El rical Pro, miess(STCe) Ctlk 6.10 MOGeI IOWMAS XRy1LAf M�IOd3 IOYVIW CW tYtlor Mavmim6ow lWml :IW[6 }W 355 350 LeE)Ep .1617-16 Mag WtarylNrypl { ILa 3G] 3fi5 363 ]61 LW Oir�e I61.7W,1.]mm/6MW Ma9[unemlMWl M 995 901 9}9 9)0 fWeWm.IL.W.10 1.9Wv1,00.10mm Oven[irtut Poha5e1Vu0 [A] 108 <D 131 1all G7 fifi935100.I5J in SM1ort Grtm Cunem{Is[) I lAI 1080 1018 ,m . fi000Va/1x5,51• MadJe Emsiaoy I (%I }II � lOH 106 303 pLf1[1rm.VrRrggllatnntlrm T3p ____�� i60SwoNa3a,B/p11a3ttvO�Wet M1 10-0d0(l-U0L 9/J 1Ol9/10)9llOpnnm MU(.1).11 IPmI M-amainWawl mnri .nio IE C) D] -•3 CJYM 1,W]mm.}A/]9J)n.l ea eay.wynmmMMMermMpyLGFMlmrtrrtas✓lstlaevYra Erle, mrlmm N91rTanxmm,msnkwM Wns W 1f 1�aiMrrl MtCmdnm)Mmlm 1.W/mI.La-mM m11.1, MIS .g11re 1PluM 'alnoutmea ,e IFdnN Electrical Pry ertks(NOCa7 Cenlficl3tamis and Woman m1.1 7. wwlu3 wr M7%— IEC61315,IEL61]30-IL) MCMnIPoa.W Is•ee Wl]5 ])I x6] ]6! W.q7W MW MYp.Qfiry) IV) 366 361 363 360 LNIIYaIYe 61]01(5.1[msl mmtm Intl MWcm,,ImY IA] )39 73x IEC6x)16(Pn.mu.w--llmT) gaga W4g1(Wa M 10x 101 401 505W1 5M1TI. TMMM,1 pa 0)0 869 BEB 06] EbJL.fl.Wfu® ipellUL1]03) '1KKTIIrmm�riogenn9Unmlvatm3 Bm Wm�,nMlamau.AL, RepYq CIxt C10LCA C1)03,he 6)}30) mmra^dl Ma 15,mm M., nr I 1) ) 1ya— y' G •InntnM seu,11 W.rin W.ons,e...m.9Menmr,3psl.meen%—_.__— Dimenibns(nm/filch) miswrrnelYs6ali,yw.uXWX'XmmoX:m>nola.Me vemylion p Tem reture Characteristics em ( s Mx3 qm ly/Y] -03L0 M[ DHQ L310 P037 China naic CXNIS nr..ws a1zB �j IT m 15 u n n n W T1M1mm Yin.nlM1.MmeraltMmwmm919�^�ndin9M1eW. ® �� IGEYtVolu Ye FMul maakamn arc MEFlmtl`Mrtrout m,se O R. 6lalae Wlsur pSQI-6aL-G.r£X�aG51} Wam lle YmaGan'Yogluyory'$ae1 03018 LGElenrm�s AE nflSrtumE . Lines Good amaml9+ ,— IRONRIDGE XR100 Rail See Descri tion / Len. Rol Section ies PmwY Vow Total Cross-Secfbnol Area 0.5820 .66 Sedan Modulus X-ate 0.2970 •46 Moment of Inedb X-o* 0.3900 MornsM of Indio Ygds 0.085 in Tmbnal Corntont 0.214 in Polar Morten) of Inertia 0.1260 1 99 APPROVED MATERIALS: 2 44 6005-76.6005A-761,6105-75,6N01.76 234 134,000 PSI YIELD STRENGTH MINIMUM) 58 1.25 Clear Pad Block Pad Description/Length Material Weil} Nurnba Number XR-106132A XR-1061328 XRIOD, Rai 13Z 111 Feet) 7.50 bs. XR-1061684 XR-100-1688 XRI00, Rai 168"114 Feet ��� 9255 bs. XR-1062044 XR-1062048 XRI00, RaA204'117 Feet) Akwri� 11.60 bs. V1.1 Aalhil, IRONRIDGE XR100 Bonded Splice XR-100 RAIL 12.0 1 XR-100-SPLC-BD KR, XR100 BONDED SPLICE vw- 2 1) Splice, XR100, Mill 12" long 2) Screw, Sell Drilling 24 63 1.93 .31 T 0.42 .15 93 #12-14 TVPE'B'THREAD Property Value PropeAy Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish Clear vtD Un Z Q u i kFOO t PRODUCT GUIDE O Exploded Product View/B.O.M.- 1 Installation Instructions-2 Cut Sheets-3 Specifications-4 U a. r) Q w CL 0CL 1 w LU �-- oOEcoFasten Solar QuikFoot— Product Guide Exploded Product View, Bill of Materials Materials Needed for Assembly Item No. Description of Material/Part Quantity 7 1 QuikFoot Base Plate 1 6 2 Fastener(length to be determined) 2 5 3 QuikFoot Flashing 1 4 EPDM Washer 1 O5 L-102-3"Bracket.(other options available) 1 w G 6 5/15"EPDM Bonded 18.8 SS Washer i v� 7 3/8"Stainless Steel Hex Nut 1 3 Required Tools w 2 o � W f B]AB59-394) Ecol'asten So18r°All content protede9 under copyright.AN rights reaerveE.10l 1.1 EwFazten Solar pmeuct.am pmts "a Pebih:8,151,522828,15].]00828.1e1.898828.189,115828.118198B2B,209,914B28,NS,4UB2$,V2.1Y4828]25,55]B2 QuikFoot— Product Guide Cut Sheets: QF-AL-Base 2X 0.33in [8.38mm] V1 _cE 70 � E O NO M 0 w 1 .50in [38.10mm W3/8"-16 Stud E E O n P 7 f\ QF-M : 5F Q� 1..75" i WE� 8EwFasen SlarAl onent proeded undw wpydglO.Pl dgMs em .lMW14 3.1 Sderp uds ere PmtedeC by M.fdl m,U.S.F4Ynb'.8,151,52 W 8,153.7w 820.101,398 B28,186,713828,118199828.208.914 B2&US 454 828172.174828.225,55782 QuikFoot- Product Guide Cut Sheets: QFL-812 R.38in [9.53mm] 032in . . _ . [0.81mm] � V1 12.00in [304.80mm] u h; 3.00in [ 76.20mm] ■no5vadb .50in I 8.00in [ 12.70mm] [203.20mm] 877-858-3917 EwFnWn SolePPlc Mp�u cop/BgMANrWBrece .lN 14 31 EaR WnSderpe5 empmbck0By Ne Mwnng U.S.Pelen%: 8.151.522B28.153,YW820.181.39882B185,713B28,118,289B20.209.911B28.215.151B282]2171B28225.557B2 QuikFoot– Product Guide Cut Sheets: Bracket Options-SCL-101-3 3/8" A 46 SERRATIONS ih 11 V/ 17/8" R1/16" _ 1/4" t -o\o 3/4„ 1/16" —y H R.005 R.O10 2X R.01 tl! F 60.100° / p1 3/B°±.002 1� vs„ 0 7/8" X 820 MAL A SCALE 3:1 877-8590947 EwFwW SMe 4 wroeM We ea vker cogri^Al rights reserved.IG 14 3.7 EmFuen Sder 9Adum m galecb06/tla fa9owiiq V S.PBMh.8.151.58 93 8.153.TI0838,181.198 Bt 8.188.]13 B3B.1KS99 e3 e309.9N BZ BN5.454 B28.'P3.1]4038]]5,55]B] QuikFoot- Product Guide Specifications - PART1 -GENERAL 1.1 SUMMARY 1.3 SUBMITTAL A WORK INCLUDES A Submit manufacturers written specifications. B. Base plate is 6000 series aluminum with one 1. QuikFoot base plate attachment bracket thatB. Submit standard product ctio sheets. PEM Type Press-In Stud 18.8 SS. attaches directly rothe roof deck. G Submit installation instructions. C. Fasteners to becompatible with chosen roof 2. Pronde appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values for the roof system, ultimate and allowable load values specific to as shown in load test data. B. RELATED SECTIONS the roof deck specified for the project. D. Counter flashing is.032 gauge aluminum em- i.Section 07600:Rashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500:Roofing 1.4 QUALITY ASSURANCE plate 3.DMsion 1:Administrative and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4.DMision7.Thermal and Moisture Protection the area of the Project. 1.2 SYSTEM DESCRIPTIONA Bracket is mill finish aluminum A COMPONENTS: 1.5 DELIVERY/STORAGE/HANDLING B. Base flashing-Black-kynar painted 1. QuikFoot system consists of aluminum Inspect material upon delivery.Notify manufacturer bracket and base plate with(1)stainless Heel "min 24 hours of any missing or defective Rem& PART 3-EXECUTION stud,(1)stainless steel nut,(1)EPDM washer Keep material dry,covered,and off the ground until anbonded stainless steel and EPDM installed. 3.1 EXAMINATION d(1) - washer. A. Substrate:Inspect structure on which brackets (� 2. Fasteners PART 2-PRODUCTS are to be installed and verify that Rwill with- A.To be of metal compatible with Quikf-oot 2.1 MANUFACTURER a additional loadingthat m be Incurred. bracket. EcoFasten Solar° rn sy WB.Fasteners should be selected for comps[- 289 Hartel Street,Morrisville,Vi 05661 B. Not General Contractor of a deficiencies O Taste with the roof deck. fir DY CFastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar bracket& U equal to that of the allowable load of the wwmecofastensolar.com em.See test data at C Verify that roofing material has been installed 2.2 MATERIALS correctly prior t0 installing solar attachment wwwt(if required by brackets. 3. Sealant(if required by roof manufacturer), A Attachment Bracket to be roof manufacturerroved. 6000 Series Aluminum(choose one) aPP 3.2 INSTALLATION 4. Aluminum counter-flashing 1.CP-SQ-Sbtted A Comply with architectural drawings and project S. Aluminum attachment bracket 2.F-111-A 3.P-3-CSK engineers recommendations for location of B. DESIGN REQUIREMENTS: 4.SCLA 01-3 system.Comply with Manufacturers writtenlai stallation instructions for installation and layout. 1. Bracket spacing to be recommended by 5.L-102-3' project engineer. 6.L-1023' 2. Install a minimum of two fasteners per 7.2-101 base plate. 8.Comp Slide 3. It Is Important to design new structures or 8.Custom assess existing structures to make sure that they can withstand retained loads. 877-959-3947 EcoF9sten Solaemmmemprobded rmpyrl9M.A11d9Meree .10g9H4 4.1 EWFa Ba ixtxl ham Walepe8by8ekrow9p U.B.Pabm9:8.151,523828.153.709828.181.398B28.1B9,713B28.1181 M8.A9.914B28.MS.44829.272.174828.225.Sv7B2 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT#9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, leamer/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one leamer or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy If 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT N9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Eauipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local Jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a 'plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing Inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy k 9 Installation Crew Operating Policy Non Electrical Work at atypical Pv Squared installation: • All Material Handling tasks o Module prep and moving o ladder lift setup o Laddersetup o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not Including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work,earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Of options o Any"plug and play"devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building Inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onslte • Misc o Truck Organizing o Material List,ordering o Daily check-in o Customer Interaction and training activities Massachusetts Electric Company&NanNcket Electric Company(d/b/a National Grid) M.DT.U. 1320 Certificate of Completion for Simplified Process Interconnections Installation Information: ❑ Check if owner-installed Interconnecting Customer: ELIZABETH BUDD Contact Person: Mailing Address.20 FORT HILL TER APT 2 City,.NORTHAMPTON State: MA ZipCode:01060-4008 Telephone(Daytime):413) 834-4849 (Evening): Facsimile Number: E-Mail Address:budd20e@gmaii.com Address of Facility(if different from above): Electrical Contractor's Name(if appropriate): PV Squared Mailing Address: 311 WELLS ST. SUITE B City: GREENFIELD Stare: MA Zip Code: 01301 Telephone(Daytime): 413-772-8788 (Evening): SAME Facsimile Number: 413-772-8668 E-Mail Address: interconnection@pvsquared.coop License number: A13764 Date of approval to install Facility granted by National Grid: 3/14/2019 Application ID number: 00213480 Inspection: The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County): Signed (Local Electrical Wiring Inspector, or attach signed electrical inspection): Name(printed): Date: License#: As a condition of interconnection you are required to send/e-mail a copy of this form along with a copy of the signed electrical permit to National Grid: National Grid Attn: Distributed Generation 40 Sylvan Rd Waltham,MA 02451 E-mail: distributed.generation(a),nationalarid.com Massachusetts:hap'//www nationale6dus coni/maswicar c/home/enere cfudistributed eeneration.aso Nantucket:hnv-//www.nationaluidus.coni/nmwcket/home/enemeff/distributed eenmtion asp Page I of 1