22B-043 (28) aa � �3 RescueNorth . . Departmentn Fire IN : Memorandum To: Larry Eldridge, Plumbing and Gas Inspector CC: Captain Andrew Pelis, Peter Jeswald From: Chief Duane Nichols Date: March 27, 2017 Re: Approval of Dual Fuel -192'Nonotuck St. 29CP Given the fact that Columbia Gas is not allowing any new installations or increase in demand of natural gas in the City I am approving the installation of propane in the building at 292 Nonotuck St.The following restrictions will apply to the installation. • All gas piping will be dearly labeled in accordance with the gas code.This is for safety,to dearly identify which gas is being transported in the piping. • Signage is needed at the main front entrance and both locations of the natural gas meter and where the propane enterers the building. • Contact the Fire Prevention Officer for wording on the signage and inspection after installed • Permit is secured from the Fire Department for the storage of propane • As the tank location is in the flood plan,tank will need to be strapped down to the cement pad to provide additional stabilization in the case of high water. • Bollards are needed around the tank to provide bump protection. aluinbia Gas of Massachusetts A NAS Company 2025 Roosevelt Avenue Springfield,MA 01102 March 15, 2017 Peter Jeswald Re: Request for Dual Fuel Dear Peter, This letter is to confirm that there is an existing gas service to 296 Nonotuck Street in Northampton, MA 01060. The natural gas delivered to this customer has a specific gravity of 0.60 and a heating value of approximately 1,000 BTU/scf. Columbia Gas of Massachusetts understands your need to use propane due to the new gas load moratorium in this market and does not oppose the installation of natural gas and propane within the same building If you have any additional questions, please contact me at the phone number and/or email address below Sincerely, Bryan Meccariello Field Engineer Columbia Gas of Massachusetts Phone 413.326.0636 Email: bjmeccariello@NiSource.com CHARLESCommonwealth of Massachusetts JOHN C.CHAPMAN D.BAKER MNDERSECRETARr OF p RNOR Division of Professional Licensure COMSI MER AFFNRS AN. KARYN E.POLITO BOARD OF STATE EXAMINERS OF PLUMBERS ROSINESS RSCMLATpN uEmENANT CAVERNDR AND GAS FITTERS CHARLES BORSTEL JAY ASH 1000 Washington Street • Boston F Massachusetts • 02115 dRESSIONAI EN IJ 9 pRORMOR,1LLSEN OF SECRETA OF HOMERIC AND ECONOMIC DE LOFMENT March 8,2017 Matthew R. Bousquet - 5B Heritage Way South Deerfield,MA. 0161001373 Unlisted Equipment Re: Variance DAGV 248-Yup Coffee Roasters, Inc.-296 Nonotuck Street-Northampton Dear Mr. Bousque[ The Board of State Examiners of Plumbers and Gas Fitters has granted your request to allow the installation and testing of the unlisted gas equipment at the above referenced location. Work on this project may commence,subject to the approval of the Local Plumbing&Gas Inspector. I have attached a copy of the outline for the field evaluation test which should be followed. The unlisted gas equipment shall be operated for testing purposes only. During this period of operation the parties involved shall be responsible for assuring all safety precautions. Final authorization to allow full operation of the equipment is pending the approval,by this office, of a Thud Party test agency report or,Massachusetts Registered Professional Engineer's test report. Sincerely, - Charles Kilb Board Counsel Board of State Examiners of Plumbers& Gas Fitters © TELEPHONE: (617)727-9952 FAX: (617)727-6095 TTYITDD: (617)727-2099 http:liw .mass.gov/dpl The Field Evaluation Final Test Report shall include Name and address of where equipment is installed, along with variance number. Name, address, and contact information of third party certified testing agency or Massachusetts registered engineer. Date of testing. Reference the standards and codes to which the equipment is designed. Description of the gas equipment or product(type, manufacturer, BTU input, nameplate,etc.) Sequence of operation Summary of the test results(all gas safeties and related components,venting, etc.) Confirm that air for combustion and ventilation is adequate. Confirm that combustible clearances are correct. Diagrams, sketches and pictures of gas trains and equipment. Other related pertinent information. SUPPLIED BY THE CUSTOMER ... _.________ __________ ___..._-___ ____________________ _ __.__ SUPPLIED WITH I11E ROASTER ___..--' --_-_ - ___-______ _._.I DY 25 / ON 30 Woh Pessme 5 20 mbar (NATURAL GAS) 5-30 mbar (PROPANE GAS) ,as burner (POuocea NP 20) Manometer \/ Manometerbw 0-411 A O(ety valve 0-60m 0-0,004 VPAI /XS0-0.006 MPA 0-0.580 PSI '.. 0-0,870 PSI woi na simsm Monometer , 0-4bar ' cux i '� ;u suwtr I ruiaeuaauaew[ g Fil00-5 MPA Iter 0-58 PSI ' dON 15 ' ww wK ve as wa Middle regulator ------ High regulator Outlet pressure LNG 20 mbar LPG 30 mbar (✓I I I r 3 R rf g Gas aPd Liquid separator OPTIONAL ------------------------------------------------------------------------------ AuID CAD kle bx HIM � SCXFME CF T4 Gl9 flE[i�I11UH JOPER swrorro rrsicaermrEnairoEn 15.001.GINP_BPR oa z 000 0 0 00 0 00 03 0 o H o N o ,V ;U , j 20 LIN -13 ro � � � P D C04,t W od° omi s <so :ul� s Yu P GaP�EG Ga . Jeswald Design Associates Mtr. 283 O:d Cricket Hill Rd. • Conway, Mo 01341 t• DEMON. g VFIEELAND CIVIL ^, NO."8917 W a 9 T!� m •l O 3/10/17 &n o H 3 Q o � U 'N p. (SOF L�ILIIJG 'a � U ' AFI�-I��WCr�D gScrL 3 O • 60x4, ror- Jolsr,9 Iln m W N • Zn FOAL �p �NblJWQ1Ul.1 —' TAPED r7CAU L ID • 7 5rFH^, FY J , WA�O�.ti PI/�ffoRH ezUCR&M, PLAt(92M t7 1 _ _ _9IL DD(ib '�IECf T AI jo Sit Jeswald Design Associates 283 Old Uckel Hill Rd. • Conway, Ma 01341 Phnnc IA 17I 7A0-A'IA 9 V— IAII AQ A O I A