Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
C3.0 R2 2018.09.25 Grading and Drainage Plan (1)
PARK HILL ROAD ZONE:WSP/FE MA Z ONE C HANNUM B R O O K HANNUM BROOKThis drawing shall not be used or reproduced in any manner for any purpose without written permission from Beals Associates, Inc.Copyright © Beals Associates, Inc. - All Rights ReservedDesigned by:Checked by: Proj. No.: C-991.02 Drawing Scale: Sheet Title Sheet NumberSyncarpha NorthamptonSolar ProjectPark Hill RoadNorthampton, MA2 PARK PLAZA SUITE 200 BOSTON, MA 02116PHONE: 617-242-1120sPLANNING sENGINEERINGsPERMITTING sMANAGEMENTNot for Construction Permit Drawings Issue Date: 18.08.17No.RevisionDateSyncarphaSolar, LLC 250 W 57th Street,Suite 701New York, NY1 inch = ft. ( IN FEET ) GRAPHIC SCALE 050 50 100 50 20025 PATH:H:\C-991.02 Northampton\Autocad\2018.09 Revised per Town Comments\grading and drainage plan.dwg Plotted by Devin Howe on September 25, 2018 GRADING AND DRAINAGE PLAN C3.0 1"=50' DPH TPM GRADING EXTENSION SCALE:1"=50'1.Relocation of solar panelswithin 200' Riparian Zone2018.09.102.Addition of stone trench toRoad B and Road C Sections2018.09.25