Loading...
37 -001 27159-DENNO-RKH-020812-SEALS24 West St.West Hatfield, MA 01088 r.k. Miles, Inc. (413) 247-8300 WORK ORDER # Attn: 27159 Job:RICH DENNO Ordered On:02/07/12 551 FLORENCE RD. NORTHAMPTON, MA WAYNE HELMS MANUFACTURERS OF ROOF & FLOOR TRUSSES 181 GOODWIN ST PO BOX 51027 INDIAN ORCHARD, MA 01151 Phone (413) 543-1298 Fax (413) 543-1847 Toll Free (800) 456-0187 PO:RU40039-DENNO Brian TetreaultOur Salesman: Cancellation Date: Sold To: Contractor Copy of Order Phone: Ordered By:WAYNE HELMS 02/10/12 ** ** Truss Engineering's Shipping Department should be contacted 5 business days before your optimal delivery date. "Projected Delivery" dates are NOT scheduled ship dates. 02/18/12Projected Delivery By: QTY TYPE SPAN LUMBER TOP BOT OVRHG / CANT LEFT RIGHT PITCH TOP BOT TRUSS ID TOTALPRICEPRICEUNITPROFILE ROOF TRUSSES LOADING TCLL-TCDL-BCLL-BCDL 40.0,10.0,0.0,10.0INFORMATION ROOF TRUSS SPACING:24.0 IN. O.C. (TYP.) PLY O/ABASE SPAN SHIPPING WIDTH UNIT WEIGHT LAYOUT BY: / /ON: T1 7.00 0.00 22-01-00 01-00-00 01-00-00 2 X 4 2 X 4 FINK 14 22-01-00 07-05-05 98 T1GE 7.00 0.00 22-01-00 01-00-00 01-00-00 2 X 4 2 X 4 GABLE 2 22-01-00 07-05-05 105 ROOF SUB-TOTAL: SUB-TOTAL GRAND TOTAL ***** IMPORTANT NOTE ***** It is the sole responsibility of the retailer to supply all attached drawings and information to their customer for review and approval. Any and all changes must be received by Truss Engineering prior to the cancellation date. Any changes received after cancellation date may result in added charges and delay of order. No response before cancellation date will be perceived as a full approval of order. Truss Engineering is responsible for supplying only the material as listed on the order. Deliveries are F.O.B. our truck to jobsite. Inability to access the jobsite or take delivery of order may result in additional charges. *** THESE DRAWINGS HAVE BEEN REVIEWED AND ARE APPROVED AS AN ORDER *** Approved By: Approval Date: PO #:Requested Delivery Date: Job 27159 Truss T1 Truss Type FINK Qty 14 Ply 1 551 FLORENCE RD. NORTHAMPTON, MA Job Reference (optional)7.250 s Nov 19 2010 MiTek Industries, Inc. Tue Feb 07 06:23:31 2012 Page 1 Truss Engineering Corp., Indian Orchard, MA 01151 ID:YaA3BHnqblsrREHqYWxfv5znwu4-DIwLH2vyYxhMI4cKyilTgk8xm_rtxVP3CQqs8VzndVA Scale = 1:42.5 B2 T1 T1 W3 W4 W4 W3 W1 W2 W1 W2 B1 1271#/-195#1271#/-195# 1 2 3 4 5 6 7 11 10 9 8 14 15 16 17 18 19 20 21 12 13 6x6 4x6 3x4 4x4 4x4 4x4 3x6 3x6 4x4 13-11- 5 7-1-0 7-1-0 15-0-0 7-11-0 22-1-0 7-1-0 -1-0-0 1-0-0 5-2-7 5-2-7 11-0-8 5-10-1 16-10-9 5-10-1 22-1-0 5-2-7 23-1-0 1-0-0 1-0-07-5-51-0-07.00 12 Plate Offsets (X,Y): [9:0-3-0,Edge] LOADING (psf)TCLL(Ground Snow=40.0)TCDLBCLL BCDL 30.8 10.00.0 * 10.0 SPACING Plates IncreaseLumber IncreaseRep Stress IncrCode 2-0-0 1.151.15YESIRC2009/TPI2007 CSI TCBCWB(Matrix) 0.860.690.40 DEFL Vert(LL)Vert(TL)Horz(TL) in -0.22-0.350.05 (loc) 9-109-108 l/defl >999>742n/a L/d 240180n/a PLATES MT20 Weight: 99 lb FT = 10% GRIP 197/144 LUMBERTOP CHORD 2 X 4 SPF No.2BOT CHORD 2 X 4 SPF No.2WEBS2 X 4 SPF Stud *Except* W1: 2 X 4 SPF No.2BRACING TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORDRigid ceiling directly applied or 10-0-0 oc bracing.WEBS1 Row at midpt 3-11, 5-8 REACTIONS (lb/size)11 =1271/0-3-8 (min. 0-2-0)8 =1271/0-3-8 (min. 0-2-0)Max Horz 11 =-185(LC 6) Max Uplift 11 =-195(LC 8) 8 =-195(LC 9) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown.TOP CHORD2-14=-333/122, 3-15=-1503/247, 15-16=-1420/253, TOP CHORD2-14=-333/122, 3-15=-1503/247, 15-16=-1420/253, 16-17=-1383/257, 4-17=-1375/270, 4-18=-1375/270, 18-19=-1383/257, 19-20=-1420/253, 5-20=-1503/247, 6-21=-333/122, 2-11=-407/185, 6-8=-407/185 BOT CHORD 10-11=-133/1307, 10-12=-8/930, 12-13=-8/930, 9-13=-8/930, 8-9=-108/1307WEBS3-10=-318/177, 4-10=-88/593, 4-9=-88/593, 5-9=-318/177, 3-11=-1372/139, 5-8=-1372/139 NOTES (11)1) Wind: ASCE 7-05; 100mph; TCDL=4.2psf; BCDL=5.0psf; h=25ft; Cat. II; Exp B;enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) -1-0-0 to 2-0-0, Interior(1) 2-0-0 to 8-0-8, Exterior(2) 8-0-8 to 11-0-8, Interior(1) 14-0-8 to 20-1-0 zone; cantilever left and right exposed ;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.33 plate grip DOL=1.33 2) TCLL: ASCE 7-05; Pg= 40.0 psf (ground snow); Pf=30.8 psf (flat roof snow);Category II; Exp B; Partially Exp.; Ct=1.13) Unbalanced snow loads have been considered for this design. 4) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 timesflat roof load of 30.8 psf on overhangs non-concurrent with other live loads. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads.6) * This truss has been designed for a live load of 20.0psf on the bottom chord in allareas where a rectangle 3-6-0 tall by 1-0-0 wide will fit between the bottom chord andany other members, with BCDL = 10.0psf.7) All bearings are assumed to be SPF No.2 . 8) Provide mechanical connection (by others) of truss to bearing plate capable ofwithstanding 100 lb uplift at joint(s) except (jt=lb) 11=195, 8=195.9) This truss is designed in accordance with the 2009 International Residential Codesections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 10) "Semi-rigid pitchbreaks with fixed heels" Member end fixity model was used in the analysis and design of this truss. 11) All Plates 20 Gauge Unless Noted LOAD CASE(S) Standard Job 27159 Truss T1GE Truss Type GABLE Qty 2 Ply 1 551 FLORENCE RD. NORTHAMPTON, MA Job Reference (optional)7.250 s Nov 19 2010 MiTek Industries, Inc. Tue Feb 07 06:23:12 2012 Page 1 Truss Engineering Corp., Indian Orchard, MA 01151 ID:YaA3BHnqblsrREHqYWxfv5znwu4-HeHAIYg105I2W9fgKDv0OkstMKV4_z2GqzkMz6zndVT Scale = 1:45.0 B2 T1 T1 W1 W1 B1 ST6 ST5 ST4 ST3 ST2 ST1 ST5 ST4 ST3 ST2 ST11 2 3 4 5 6 7 8 9 10 11 12 13 14 15 28 27 26 25 24 23 22 21 20 19 18 17 16 31 32 29 30 2x4 4x4 2x4 3x4 3x4 5x6 22-1-0 22-1-0 -1-0-0 1-0-0 11-0-8 11-0-8 22-1-0 11-0-8 23-1-0 1-0-0 1-0-07-5-51-0-07.00 12 Plate Offsets (X,Y): [20:0-3-0,0-3-0] LOADING (psf)TCLL(Ground Snow=40.0)TCDLBCLL BCDL 30.8 10.00.0 * 10.0 SPACING Plates IncreaseLumber IncreaseRep Stress IncrCode 2-0-0 1.151.15YESIRC2009/TPI2007 CSI TCBCWB(Matrix) 0.100.070.19 DEFL Vert(LL)Vert(TL)Horz(TL) in -0.01-0.010.00 (loc) 151516 l/defl n/rn/rn/a L/d 12090n/a PLATES MT20 Weight: 105 lb FT = 10% GRIP 197/144 LUMBERTOP CHORD 2 X 4 SPF No.2BOT CHORD 2 X 4 SPF No.2WEBS2 X 4 SPF No.2 OTHERS 2 X 4 SPF StudBRACING TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORDRigid ceiling directly applied or 6-0-0 oc bracing. REACTIONS All bearings 22-1-0.(lb) - Max Horz28= 185(LC 7)Max UpliftAll uplift 100 lb or less at joint(s) 23, 24, 25, 26, 21, 20, 19, 18 except 16=-106(LC 7), 28=-155(LC 6), 27=-147(LC 7), 17=-114(LC 6) Max Grav All reactions 250 lb or less at joint(s) 16, 28, 25, 26, 27, 19, 18, 17 except 22=278(LC 1), 23=367(LC 2), 24=319(LC 2), 21=366(LC 3), 20=318(LC 3) FORCES (lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES (16) 1) Wind: ASCE 7-05; 100mph; TCDL=4.2psf; BCDL=5.0psf; h=25ft; Cat. II; Exp B;enclosed; MWFRS (low-rise) gable end zone and C-C Corner(3) -1-0-0 to 2-0-0,Exterior(2) 2-0-0 to 8-0-8, Corner(3) 8-0-8 to 11-0-8, Exterior(2) 14-0-8 to 20-1-0 zone;cantilever left and right exposed ;C-C for members and forces & MWFRS for reactionsshown; Lumber DOL=1.33 plate grip DOL=1.332) Truss designed for wind loads in the plane of the truss only. For studs exposed towind (normal to the face), see MiTek "Standard Gable End Detail"3) TCLL: ASCE 7-05; Pg= 40.0 psf (ground snow); Pf=30.8 psf (flat roof snow);Category II; Exp B; Partially Exp.; Ct=1.1 4) Unbalanced snow loads have been considered for this design. 5) This truss has been designed for greater of min roof live load of 16.0 psf or 1.00 times flat roof load of 30.8 psf on overhangs non-concurrent with other live loads. 6) All plates are 1.5x4 MT20 unless otherwise indicated.7) Gable requires continuous bottom chord bearing. 8) Truss to be fully sheathed from one face or securely braced against lateral movement(i.e. diagonal web).9) Gable studs spaced at 2-0-0 oc.10) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrentwith any other live loads.11) * This truss has been designed for a live load of 20.0psf on the bottom chord in allareas where a rectangle 3-6-0 tall by 1-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 12) All bearings are assumed to be SPF No.2 . 13) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 23, 24, 25, 26, 21, 20, 19, 18 except (jt=lb) 16=106,28=155, 27=147, 17=114.14) This truss is designed in accordance with the 2009 International Residential Codesections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1.15) "Semi-rigid pitchbreaks with fixed heels" Member end fixity model was used in theanalysis and design of this truss. 16) All Plates 20 Gauge Unless Noted LOAD CASE(S) Standard