24C-007 281 Prospect 2018-05-16DEMO. SCOPE OF WORKSUN PORCH
1.REMOVE & DISCARD (2) STORM WINDOWS
2.REMOVE & SAVE STORM DOOR AND HARDWARE FOR
REUSE
EXTERIOR
1.REMOVE & DISCARD STAIRS TO SUN PORCH
2.REMOVE & DISCARD (1) DOOR TO BASEMENT
3.REMOVE & DISCARD GUTTERS FROM SUN PORCH ONLY
4.REMOVE & DISCARD SIDEWALKS TO HOUSE AS SHOWN
WALL KEY= EXISTING 2x4 INTERIOR WALL= EXISTING 2x6 EXTERIOR WALL= EXISTING 2x4 HALF WALL= DEMO. 2x4 INTERIOR WALL= DEMO. 2x6 EXTERIOR WALL= DEMO 2x4 HALF WALL
REMOVE &
DISCARD STAIRS
REMOVE &
DISCARD THIS
DOWN SPOUT
REMOVE & DISCARD
CONCRETE WALK
TO THIS POINT
REMOVE & DISCARD
CONCRETE WALK
TO THIS POINT
WALKWAY
ETR
WALKWAY
ETR
SPECIFICATIONS
DIVISION 1 – GENERAL REQUIREMENTS:
1.CONTRACTOR WILL OBTAIN ALL NECESSARY PERMITS FOR
CONSTRUCTION, EXCEPT THAT OWNER SHALL BE RESPONSIBLE FOR
WATER, SEWER, ELECTRIC, AND CABLE FEES, IF ANY.
2.CONTRACT EXCLUDES APPROVALS BY ZONING BOARD OF APPEALS,
PLANNING BOARD AND/OR CONSERVATION COMMISSION.
3.CONTRACT EXCLUDES ARCHITECTURAL OVERSIGHT.
4.ANY OTHER REQUIREMENTS FROM TOWN NOT EXPLICITLY INCLUDED IN
THE PLANS OR SPECS ARE NOT INCLUDED IN THIS CONTRACT.
5.SITE SURVEY IS NOT INCLUDED
6.CONTRACTOR HAS NOT TESTED FOR ASBESTOS AND OTHER
HAZARDOUS MATERIALS AND CONTRACT DOES NOT INCLUDE ANY
REMEDIATION OR ABATEMENT WORK.
7.ALL OWNER-SUPPLIED ITEMS ARE NOT UNDER WARRANTY BY
INTEGRITY OR INTEGRITY’S SUB-CONTRACTORS AND SUPPLIERS. ANY
OWNER-SUPPLIED ITEMS THAT ARRIVE DAMAGED, LATE OR
INCOMPLETE MAY CAUSE DELAYS TO THE SCHEDULE AND INTEGRITY
WILL NOT BE HELD LIABLE FOR SUCH DELAYS.
8.ALL CONSTRUCTION DEBRIS WILL BE PLACED IN AN ONSITE DUMPSTER
PROVIDED BY CONTRACTOR AND REMOVED BY CONTRACTOR AT
CONTRACTOR’S EXPENSE.
9.ALL UTILITIES USED DURING CONSTRUCTION ARE THE OWNER’S
RESPONSIBILITY.
10.CONTRACTOR SHALL PROMPTLY REMOVE ALL CONSTRUCTION
EQUIPMENT AND MATERIALS FROM SITE AT CONCLUSION OF
CONSTRUCTION.
11.WHEREVER CONTRACTOR DRAWING OR SPECIFICATION STATES,
“MATCH EXISTING,” SUCH LANGUAGE SHALL MEAN “MATCH EXISTING AS
CLOSELY AS POSSIBLE FROM CURRENTLY AVAILABLE STOCK ITEMS
PURCHASED LOCALLY”.
12.ALL DIMENSIONS ARE TO THE FACE OF FRAMING UNLESS OTHERWISE
SPECIFIED.
13.ALL EXISTING STRUCTURAL COMPONENTS TO REMAIN UNLESS
OTHERWISE SPECIFIED.
14.ALL APPLIANCES, FURNITURE, ETC. SUPPLIED BY OWNER. Development & Construction, Inc.110 Pulpit Hill RoadAmherst, Ma 01002413-549-7919 FAX: 413-549-7918 EMAIL: INFO@INTEGBUILD.COMDESIGN BY
HFARMSTRONG-PRASHADRESIDENCE1INTEGRITYA-
SHEET:
DATE:
5/23/2018CONTRACT &BUILDING SET281 PROSPECT ST, NORTHAMPTON, MA 01060DECKCONTRACT AGREED BY:
____________________________________________________________________________
LISA ARMSTRONG - OWNER OF 281 PROSPECT ST, NORTHAMPTON, MA 01060
____________________________________________________________________________
VIJAY PRASHAD - OWNER OF 281 PROSPECT ST, NORTHAMPTON, MA 01060
____________________________________________________________________________
HEIDI FLANDERS - VICE PRESIDENT FOR INTEGRITY DEVELOPMENT & CONSTRUCTION, INC.
ARMSTRONG-PRASHAD
RESI DENCE
281 PROSPECT ST, NORTHAMPTON, MA 01060
INDEX
A-1
A-2
A-3
A-4
A-5
A-6
A-7
TITLE PAGE
EXISTING FOUNDATION & FIRST FLOOR PLANS
PROPOSED SITE PLAN
PROPOSED FOUNDATION & FIRST FLOOR PLANS
PROPOSED SCHEDULES AND FRAMING PLANS
PROPOSED RAIL DETAILS AND WINDOW
SECTION
PROPOSED ELEVATIONS, STAIR SECTION, AND
WINDOW ELEVATION
REMOVE & SAVE
REMOVE & DISCARD REMOVE & DISCARDTO REMAINTO REMAINUP
3'-7"5'
6'-3 3/4"8'-7"
3'-8 3/4"1'-7 3/4"5'-5"
4'-1 1/4"10'-9 1/2"5'-3 1/2"2'DEMO. SCOPE OF WORK
SUN PORCH
1.REMOVE & DISCARD (2) STORM WINDOWS
2.REMOVE & SAVE STORM DOOR AND HARDWARE FOR
REUSE
EXTERIOR
1.REMOVE & DISCARD STAIRS TO SUN PORCH
2.REMOVE & DISCARD (1) DOOR TO BASEMENT
3.REMOVE & DISCARD GUTTERS FROM SUN PORCH ONLY
4.REMOVE & DISCARD SIDEWALKS TO HOUSE AS SHOWN
WALL KEY= EXISTING 2x4 INTERIOR WALL= EXISTING 2x6 EXTERIOR WALL= EXISTING 2x4 HALF WALL= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
REMOVE &
DISCARD STAIRS
REMOVE &
DISCARD THIS
DOWN SPOUT
REMOVE & DISCARD
CONCRETE WALK
TO THIS POINT
SUN PORCH
REMOVE & DISCARD
CONCRETE WALK
TO THIS POINT
WALKWAY
ETR
WALKWAY
ETR
SPECIFICATIONS
DIVISION 1 – GENERAL REQUIREMENTS:
1.CONTRACTOR WILL OBTAIN ALL NECESSARY PERMITS FOR
CONSTRUCTION, EXCEPT THAT OWNER SHALL BE RESPONSIBLE FOR
WATER, SEWER, ELECTRIC, AND CABLE FEES, IF ANY.
2.CONTRACT EXCLUDES APPROVALS BY ZONING BOARD OF APPEALS,
PLANNING BOARD AND/OR CONSERVATION COMMISSION.
3.CONTRACT EXCLUDES ARCHITECTURAL OVERSIGHT.
4.ANY OTHER REQUIREMENTS FROM TOWN NOT EXPLICITLY INCLUDED IN
THE PLANS OR SPECS ARE NOT INCLUDED IN THIS CONTRACT.
5.SITE SURVEY IS NOT INCLUDED
6.CONTRACTOR HAS NOT TESTED FOR ASBESTOS AND OTHER
HAZARDOUS MATERIALS AND CONTRACT DOES NOT INCLUDE ANY
REMEDIATION OR ABATEMENT WORK.
7.ALL OWNER-SUPPLIED ITEMS ARE NOT UNDER WARRANTY BY
INTEGRITY OR INTEGRITY’S SUB-CONTRACTORS AND SUPPLIERS. ANY
OWNER-SUPPLIED ITEMS THAT ARRIVE DAMAGED, LATE OR
INCOMPLETE MAY CAUSE DELAYS TO THE SCHEDULE AND INTEGRITY
WILL NOT BE HELD LIABLE FOR SUCH DELAYS.
8.ALL CONSTRUCTION DEBRIS WILL BE PLACED IN AN ONSITE DUMPSTER
PROVIDED BY CONTRACTOR AND REMOVED BY CONTRACTOR AT
CONTRACTOR’S EXPENSE.
9.ALL UTILITIES USED DURING CONSTRUCTION ARE THE OWNER’S
RESPONSIBILITY.
10.CONTRACTOR SHALL PROMPTLY REMOVE ALL CONSTRUCTION
EQUIPMENT AND MATERIALS FROM SITE AT CONCLUSION OF
CONSTRUCTION.
11.WHEREVER CONTRACTOR DRAWING OR SPECIFICATION STATES,
“MATCH EXISTING,” SUCH LANGUAGE SHALL MEAN “MATCH EXISTING AS
CLOSELY AS POSSIBLE FROM CURRENTLY AVAILABLE STOCK ITEMS
PURCHASED LOCALLY”.
12.ALL DIMENSIONS ARE TO THE FACE OF FRAMING UNLESS OTHERWISE
SPECIFIED.
13.ALL EXISTING STRUCTURAL COMPONENTS TO REMAIN UNLESS
OTHERWISE SPECIFIED.
14.ALL APPLIANCES, FURNITURE, ETC. SUPPLIED BY OWNER. REMOVE & DISCARDTO REMAINTO REMAIN TO REMAIN2'-9"2'-3 1/2"2'2'-0 1/4"6'-1 1/2"2'-4 3/4"1'-10 1/8"7'-11 3/4"5'-0 1/8"14'-10"2'-0 1/4"8'-6 1/4"5'-0 1/2"2'STORAGE
BASEMENTDEMO. SCOPE OF WORK
SUN PORCH
1.REMOVE & DISCARD (2) STORM WINDOWS
2.REMOVE & SAVE STORM DOOR AND HARDWARE FOR
REUSE
EXTERIOR
1.REMOVE & DISCARD STAIRS TO SUN PORCH
2.REMOVE & DISCARD (1) DOOR TO BASEMENT
3.REMOVE & DISCARD GUTTERS FROM SUN PORCH ONLY
4.REMOVE & DISCARD SIDEWALKS TO HOUSE AS SHOWN
WALL KEY
= EXISTING 2x4 INTERIOR WALL
= EXISTING 2x6 EXTERIOR WALL
= EXISTING 2x4 HALF WALL
= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
REMOVE &
DISCARD STAIRS
REMOVE &
DISCARD THIS
DOWN SPOUT
REMOVE & DISCARD
CONCRETE WALK
TO THIS POINT
REMOVE & DISCARD
CONCRETE WALK
TO THIS POINT
WALKWAY
ETR
WALKWAY
ETR
SPECIFICATIONS
DIVISION 1 – GENERAL REQUIREMENTS:
1.CONTRACTOR WILL OBTAIN ALL NECESSARY PERMITS FOR
CONSTRUCTION, EXCEPT THAT OWNER SHALL BE RESPONSIBLE FOR
WATER, SEWER, ELECTRIC, AND CABLE FEES, IF ANY.
2.CONTRACT EXCLUDES APPROVALS BY ZONING BOARD OF APPEALS,
PLANNING BOARD AND/OR CONSERVATION COMMISSION.
3.CONTRACT EXCLUDES ARCHITECTURAL OVERSIGHT.
4.ANY OTHER REQUIREMENTS FROM TOWN NOT EXPLICITLY INCLUDED IN
THE PLANS OR SPECS ARE NOT INCLUDED IN THIS CONTRACT.
5.SITE SURVEY IS NOT INCLUDED
6.CONTRACTOR HAS NOT TESTED FOR ASBESTOS AND OTHER
HAZARDOUS MATERIALS AND CONTRACT DOES NOT INCLUDE ANY
REMEDIATION OR ABATEMENT WORK.
7.ALL OWNER-SUPPLIED ITEMS ARE NOT UNDER WARRANTY BY
INTEGRITY OR INTEGRITY’S SUB-CONTRACTORS AND SUPPLIERS. ANY
OWNER-SUPPLIED ITEMS THAT ARRIVE DAMAGED, LATE OR
INCOMPLETE MAY CAUSE DELAYS TO THE SCHEDULE AND INTEGRITY
WILL NOT BE HELD LIABLE FOR SUCH DELAYS.
8.ALL CONSTRUCTION DEBRIS WILL BE PLACED IN AN ONSITE DUMPSTER
PROVIDED BY CONTRACTOR AND REMOVED BY CONTRACTOR AT
CONTRACTOR’S EXPENSE.
9.ALL UTILITIES USED DURING CONSTRUCTION ARE THE OWNER’S
RESPONSIBILITY.
10.CONTRACTOR SHALL PROMPTLY REMOVE ALL CONSTRUCTION
EQUIPMENT AND MATERIALS FROM SITE AT CONCLUSION OF
CONSTRUCTION.
11.WHEREVER CONTRACTOR DRAWING OR SPECIFICATION STATES,
“MATCH EXISTING,” SUCH LANGUAGE SHALL MEAN “MATCH EXISTING AS
CLOSELY AS POSSIBLE FROM CURRENTLY AVAILABLE STOCK ITEMS
PURCHASED LOCALLY”.
12.ALL DIMENSIONS ARE TO THE FACE OF FRAMING UNLESS OTHERWISE
SPECIFIED.
13.ALL EXISTING STRUCTURAL COMPONENTS TO REMAIN UNLESS
OTHERWISE SPECIFIED.
14.ALL APPLIANCES, FURNITURE, ETC. SUPPLIED BY OWNER. Development & Construction, Inc.110 Pulpit Hill RoadAmherst, Ma 01002413-549-7919 FAX: 413-549-7918 EMAIL: INFO@INTEGBUILD.COMDESIGN BY
HFARMSTRONG-PRASHADRESIDENCE2INTEGRITYA-
SHEET:
DATE:
5/23/2018CONTRACT &BUILDING SET281 PROSPECT ST, NORTHAMPTON, MA 01060DECK2
A-02
2
A-02
EXISTING FIRST FLOOR PLAN
1/2" = 1'-0"
1
A-02
1
A-02
EXISTING FOUNDATION PLAN
1/2" = 1'-0"
UPN
31'50'
33'
50'34'PORCH
EXISTING HOUSE
DECK
SUN PORCH
GARAGE
81'
80'
125.3'
138.5'
FRONT SETBACK
REAR SETBACK
SIDE SETBACK
SITE LEGEND
REQUIRED EXISTING PROPOSED
PROPERTY MAP #24C 24C
PROPERTY LOT #0 0 7 0 0 7
ZONE URB URB
LOT SIZE (IN SQ FT) 2,500 10,600 10,600
LOT FRONTAGE 50'81'81'
LOT DEPTH 75'125'125'
OPEN SPACE 40%68%67%
FRONT SETBACK 10'33'33'
SIDE SETBACK 15'31'31'
ZERO LOT LINE 0'6'6'
REAR SETBACK 20'50'50'
NO WORK
PROSPECT STADARE PLACE
NO WORK
EXISTING
DRIVEWAY
TO REMAIN
NO WORK
EXISTING SIDEWALKTO REMAINDevelopment & Construction, Inc.110 Pulpit Hill RoadAmherst, Ma 01002413-549-7919 FAX: 413-549-7918 EMAIL: INFO@INTEGBUILD.COMDESIGN BY
HFARMSTRONG-PRASHADRESIDENCE3INTEGRITYA-
SHEET:
DATE:
5/23/2018CONTRACT &BUILDING SET281 PROSPECT ST, NORTHAMPTON, MA 01060DECK1
A-03
1
A-03
PROPOSED SITE PLAN
1" = 10'
REUSE SAVED
W02 - 5553 W03 - 5254W01 - CENTERIN OPENINGTO REMAINTO REMAINUP
3'6'3'-7"3'-7"3'3'4'-10 1/2"3'-10"2'-0 3/4"7'-3 1/2"WALL KEY= EXISTING 2x4 INTERIOR WALL= EXISTING 2x6 EXTERIOR WALL= EXISTING 2x4 HALF WALL= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SPECIFICATIONS
DIVISION 6: WOOD & PLASTICS
DECK FRAMING
1.SUPPLY & FASTEN (3) PRECAST SQUARE PIERS WITH SIMPSON ABW44Z POST BASES
2.SUPPLY & INSTALL (3) 4 X 4 PT POSTS
3.FASTEN POSTS TO BEAM USING (1) PAIR OF SIMPSON LPC4Z TWO PIECE POST CAPS PER POST
4.SUPPLY & INSTALL (2) 2 X 8 DROP GIRDER PER PLAN 2 ON A-05
5.SUPPLY & INSTALL 2 X 8 PT JOISTS @ 16" O.C. PER PLAN 3 ON A-05
STAIRS FRAMING
1.SUPPLY & INSTALL (3) 2 X 12 PT STRINGERS
2.BUILD (7) TREADS @ 11" DEEP, WITH 6 3/4" RISERS PER SECTION 1 ON A-07
DIVISION 7: THERMAL & MOISTURE PROTECTION
1.SUPPLY & INSTALL GRACE VYCOR TAPE AROUND (1) NEW WINDOW TO BASEMENT
DIVISION 8: DOORS & WINDOWS
1.SUPPLY & INSTALL (2) FIXED GLASS WINDOWS PER PLAN AND DETAILS 2 ON A-06 AND 4 ON A-07
2.SUPPLY & INSTALL (1) WINDOW PER SCHEDULE IN PLACE OF BASEMENT DOOR; EXISTING
HEADER TO REMAIN
3.INSTALL SAVED STORM DOOR IN EXISTING LOCATION
DIVISION 9: FINISHES
DECKING
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER DETAIL 1 ON A-06
3.FASTEN NEWEL POSTS TO RIM JOIST WITH FASTENMASTER THRU-LOK BOLT REPLACEMENT
4.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW DECK
6.PROVIDE ACCESS PANEL IN LATTICE PER PLAN
7.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
8.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
STAIRS
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER SECTION 1 ON A-07
3.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
4.SUPPLY & INSTALL (1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL IN BRONZE MOUNTED
INSIDE IPE RAILINGS
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW STAIRS
6.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
7.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
OTHER
1.SUPPLY & INSTALL FLAT 1 X INTERIOR TRIM AROUND NEW WINDOW IN BASEMENT; ACTUAL TRIM
WIDTH TBD BY MASONRY OPENING
DECK
SUN PORCH
APPROX.
MOVE GUTTER
DOWNSPOUT HERE
APPROX.(2)- 2 X 8 PTDROP BEAM4 X 4 POST
CONCRETE
TO REMAIN
CONCRETE
TO REMAIN
NEW CONCRETE
SIDEWALK HERE
2 X 6 IPE RAIL CAP4 X 4 IPE NEWEL POST2 X 2 IPE VERTICALCLEAT1 X 6 IPE BALUSTERSSPACED APPROX.3.13" APART 2 X 6 IPE RAIL CAP2 X 2 IPE VERTICAL CLEAT4 X 4 IPE NEWEL POST1 X 6 IPE BALUSTERSSPACED APPROX.3.13" APART
SPECIFICATIONS
DIVISION 2: SITE WORK
1.CALL DIG SOFT PRIOR TO START OF WORK
2.GRADE UNDER THE DECK WITH SITE MATERIAL. ANY
EXCESS WILL BE HAULED OFFSITE
3.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST PIERS
@ A MIN OF 4' BELOW GRADE
4.GRADE DISTURBED AREA OF SITE; PROVIDE AND
SPREAD 4 CY OF SCREENED TOPSOIL, RAKE SEED
AND STRAW MULCH. OWNER TO BE RESPONSIBLE
FOR WATERING AND MAINTENANCE
5.NO UTILITY WORK IS INCLUDED
6.LATENT SUBSURFACE CONDITIONS REQUIRING SOIL
STABILIZATION, ROCK EXCAVATION, DEWATERING OR
ANY OTHER CONDITION THAT PREVENTS
CONSTRUCTION WILL BE AT EXTRA COSTS
7.ROCK IS DEFINED AS BEDROCK OR BOULDERS
EXCEEDING ONE CUBIC YARD IN SIZE. DEWATERING
IS DEFINED AS PUMPING OR OTHER DRAINAGE
MEASURES DUE TO GROUNDWATER
8.CONTRACTOR SHALL NOT BE LIABLE FOR ANY
DAMAGE TO STRUCTURES, DRIVEWAYS, TREES,
PLANTS, LAWNS, OR UNDERGROUND PIPES OR
SYSTEMS DUE TO CONSTRUCTION ACTIVITIES
DIVISION 3: CONCRETE
1.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST
SQUARE PIERS @ A MIN OF 4' BELOW GRADE
2.INSTALL NEW POURED IN PLACE SIDEWALKS W/
WELDED WIRE MESH PER PLAN AND BROOM FINISH
DIVISION 4: MASONRY
1.FILL IN BELOW BASEMENT WINDOW WITH BRICK TO
MATCH EXISTING LOWER WALL BRICK BY
ALLOWANCE
DIVISION 5: METALS
1.MOVE WHITE SEAMLESS GUTTER DOWNSPOUT TO
NEW LOCATION PER PLAN, GUTTER TO TERMINATE @
GRADE
1 X 4 PRIMEDSELECT PINELATTICE TRIMSQUARE CEDARPRIVACY LATTICEPVC LATTICE TRIM 62 1/2" PANE OF GLASS63" ROUGH OPENING1 X 1 PRIMEDPINE STOPS APPX. ROUGH OPENINGAPPX. WINDOW GLASS1 X 6 IPE DECKING1 X 8 PRIMED PINETRIM BOARD2 X 8 FILLER BETWEEN4 X 4 RAIL POSTS2 X 8 RIM JOIST 4 X 4 IPENEWEL POST
PROVIDE ACCESS
PANEL IN LATTICE
BELOW DECK HERE
PRECASTCONCRETE PIER@ A MIN. OF 4'BELOW GRADE 2 X 2 IPEVERTICAL CLEAT
MIN. RAIL TO
RAIL DIMENSION
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SET TOP OFPIER @ GRADE 1.1" X 6" IPE DECKING PER PLAN 1 ON A-062.FINISH IPE DECKING WITH BENJAMINMOORE CLEAR OIL BASED SEALER3.(3) 2 X 12 PT STRINGERS4.(7) TREADS @ 11" DEEP, WITH 6 3/4"RISERS PER PLAN 1 ON A-061.IPE RAILINGS AND NEWEL POSTS PER PLAN 2 ON A -062.FINISH IPE RAILINGS AND NEWEL POSTS WITHBENJAMIN MOORE CLEAR OIL BASED SEALER3.(1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAILMOUNTED INSIDE IPE RAILING 1.1 X 6 IPEDECKING2.1X 8 TRIM BOARD3.2 X 8 FILLER4.2 X 8 RIM JOIST5.(2)- 2 X 8 PT DROPBEAM6.4 X 4 POST(2)- 2 X 8 PTDROP BEAM4 X 4 POST2 X 6 IPE RAIL CAP4 X 4 IPE NEWEL POST2 X 2 IPE VERTICALCLEAT1 X 6 IPE BALUSTERSSPACED APPROX.3.13" APART2 X 8 RIM JOIST
TO REMAINTO REMAIN TO REMAIN6'5'-6 3/4"5 1/4"5 1/4"5'-5"3'-2"1'-6"
FILL IN BELOW WINDOW WITH
BRICK TO MATCH EXISTING LOWER
WALL BRICK BY ALLOWANCE
DECKING
ABOVE
WALL KEY
= EXISTING 2x4 INTERIOR WALL
= EXISTING 2x6 EXTERIOR WALL
= EXISTING 2x4 HALF WALL
= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SPECIFICATIONS
DIVISION 6: WOOD & PLASTICS
DECK FRAMING
1.SUPPLY & FASTEN (3) PRECAST SQUARE PIERS WITH SIMPSON ABW44Z POST BASES
2.SUPPLY & INSTALL (3) 4 X 4 PT POSTS
3.FASTEN POSTS TO BEAM USING (1) PAIR OF SIMPSON LPC4Z TWO PIECE POST CAPS PER POST
4.SUPPLY & INSTALL (2) 2 X 8 DROP GIRDER PER PLAN 2 ON A-05
5.SUPPLY & INSTALL 2 X 8 PT JOISTS @ 16" O.C. PER PLAN 3 ON A-05
STAIRS FRAMING
1.SUPPLY & INSTALL (3) 2 X 12 PT STRINGERS
2.BUILD (7) TREADS @ 11" DEEP, WITH 6 3/4" RISERS PER SECTION 1 ON A-07
DIVISION 7: THERMAL & MOISTURE PROTECTION
1.SUPPLY & INSTALL GRACE VYCOR TAPE AROUND (1) NEW WINDOW TO BASEMENT
DIVISION 8: DOORS & WINDOWS
1.SUPPLY & INSTALL (2) FIXED GLASS WINDOWS PER PLAN AND DETAILS 2 ON A-06 AND 4 ON A-07
2.SUPPLY & INSTALL (1) WINDOW PER SCHEDULE IN PLACE OF BASEMENT DOOR; EXISTING
HEADER TO REMAIN
3.INSTALL SAVED STORM DOOR IN EXISTING LOCATION
DIVISION 9: FINISHES
DECKING
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER DETAIL 1 ON A-06
3.FASTEN NEWEL POSTS TO RIM JOIST WITH FASTENMASTER THRU-LOK BOLT REPLACEMENT
4.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW DECK
6.PROVIDE ACCESS PANEL IN LATTICE PER PLAN
7.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
8.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
STAIRS
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER SECTION 1 ON A-07
3.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
4.SUPPLY & INSTALL (1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL IN BRONZE MOUNTED
INSIDE IPE RAILINGS
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW STAIRS
6.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
7.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
OTHER
1.SUPPLY & INSTALL FLAT 1 X INTERIOR TRIM AROUND NEW WINDOW IN BASEMENT; ACTUAL TRIM
WIDTH TBD BY MASONRY OPENING
APPROX.
MOVE GUTTER
DOWNSPOUT HERE
APPROX.(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
CONCRETE
TO REMAIN
CONCRETE
TO REMAIN
NEW CONCRETE
SIDEWALK HERE
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 6 IPE RAIL CAP
2 X 2 IPE VERTICAL CLEAT
4 X 4 IPE NEWEL POST
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
SPECIFICATIONS
DIVISION 2: SITE WORK
1.CALL DIG SOFT PRIOR TO START OF WORK
2.GRADE UNDER THE DECK WITH SITE MATERIAL. ANY
EXCESS WILL BE HAULED OFFSITE
3.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST PIERS
@ A MIN OF 4' BELOW GRADE
4.GRADE DISTURBED AREA OF SITE; PROVIDE AND
SPREAD 4 CY OF SCREENED TOPSOIL, RAKE SEED
AND STRAW MULCH. OWNER TO BE RESPONSIBLE
FOR WATERING AND MAINTENANCE
5.NO UTILITY WORK IS INCLUDED
6.LATENT SUBSURFACE CONDITIONS REQUIRING SOIL
STABILIZATION, ROCK EXCAVATION, DEWATERING OR
ANY OTHER CONDITION THAT PREVENTS
CONSTRUCTION WILL BE AT EXTRA COSTS
7.ROCK IS DEFINED AS BEDROCK OR BOULDERS
EXCEEDING ONE CUBIC YARD IN SIZE. DEWATERING
IS DEFINED AS PUMPING OR OTHER DRAINAGE
MEASURES DUE TO GROUNDWATER
8.CONTRACTOR SHALL NOT BE LIABLE FOR ANY
DAMAGE TO STRUCTURES, DRIVEWAYS, TREES,
PLANTS, LAWNS, OR UNDERGROUND PIPES OR
SYSTEMS DUE TO CONSTRUCTION ACTIVITIES
DIVISION 3: CONCRETE
1.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST
SQUARE PIERS @ A MIN OF 4' BELOW GRADE
2.INSTALL NEW POURED IN PLACE SIDEWALKS W/
WELDED WIRE MESH PER PLAN AND BROOM FINISH
DIVISION 4: MASONRY
1.FILL IN BELOW BASEMENT WINDOW WITH BRICK TO
MATCH EXISTING LOWER WALL BRICK BY
ALLOWANCE
DIVISION 5: METALS
1.MOVE WHITE SEAMLESS GUTTER DOWNSPOUT TO
NEW LOCATION PER PLAN, GUTTER TO TERMINATE @
GRADE
1 X 4 PRIMED
SELECT PINE
LATTICE TRIM
SQUARE CEDAR
PRIVACY LATTICE
PVC LATTICE TRIM
62 1/2" PANE OF GLASS
63" ROUGH OPENING
1 X 1 PRIMED
PINE STOPS
APPX. ROUGH OPENINGAPPX. WINDOW GLASS1 X 6 IPE DECKING
1 X 8 PRIMED PINE
TRIM BOARD
2 X 8 FILLER BETWEEN
4 X 4 RAIL POSTS
2 X 8 RIM JOIST
4 X 4 IPE
NEWEL POST
PROVIDE ACCESS
PANEL IN LATTICE
BELOW DECK HERE
PRECAST
CONCRETE PIER
@ A MIN. OF 4'
BELOW GRADE 2 X 2 IPE
VERTICAL CLEAT
MIN. RAIL TO
RAIL DIMENSION
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SET TOP OF
PIER @ GRADE
1.1" X 6" IPE DECKING PER PLAN 1 ON A-06
2.FINISH IPE DECKING WITH BENJAMIN
MOORE CLEAR OIL BASED SEALER
3.(3) 2 X 12 PT STRINGERS
4.(7) TREADS @ 11" DEEP, WITH 6 3/4"
RISERS PER PLAN 1 ON A-06
1.IPE RAILINGS AND NEWEL POSTS PER PLAN 2 ON A -06
2.FINISH IPE RAILINGS AND NEWEL POSTS WITH
BENJAMIN MOORE CLEAR OIL BASED SEALER
3.(1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL
MOUNTED INSIDE IPE RAILING
1.1 X 6 IPE
DECKING
2.1X 8 TRIM BOARD
3.2 X 8 FILLER
4.2 X 8 RIM JOIST
5.(2)- 2 X 8 PT DROP
BEAM
6.4 X 4 POST
(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 8 RIM JOIST Development & Construction, Inc.110 Pulpit Hill RoadAmherst, Ma 01002413-549-7919 FAX: 413-549-7918 EMAIL: INFO@INTEGBUILD.COMDESIGN BY
HFARMSTRONG-PRASHADRESIDENCE4INTEGRITYA-
SHEET:
DATE:
5/23/2018CONTRACT &BUILDING SET281 PROSPECT ST, NORTHAMPTON, MA 01060DECK2
A-04
2
A-04
PROPOSED FIRST FLOOR PLAN
1/2" = 1'-0"
PROPOSED FOUNDATION PLAN
1/2" = 1'-0"
1
A-04
1
A-04
WALL KEY= EXISTING 2x4 INTERIOR WALL= EXISTING 2x6 EXTERIOR WALL= EXISTING 2x4 HALF WALL= DEMO. 2x4 INTERIOR WALL= DEMO. 2x6 EXTERIOR WALL= DEMO 2x4 HALF WALLSET NEW DECK FLOORFLUSH WITH SUNPORCH FLOOR @ DOOR SPECIFICATIONSDIVISION 6: WOOD & PLASTICSDECK FRAMING1.SUPPLY & FASTEN (3) PRECAST SQUARE PIERS WITH SIMPSON ABW44Z POST BASES2.SUPPLY & INSTALL (3) 4 X 4 PT POSTS3.FASTEN POSTS TO BEAM USING (1) PAIR OF SIMPSON LPC4Z TWO PIECE POST CAPS PER POST4.SUPPLY & INSTALL (2) 2 X 8 DROP GIRDER PER PLAN 2 ON A-055.SUPPLY & INSTALL 2 X 8 PT JOISTS @ 16" O.C. PER PLAN 3 ON A-05STAIRS FRAMING1.SUPPLY & INSTALL (3) 2 X 12 PT STRINGERS2.BUILD (7) TREADS @ 11" DEEP, WITH 6 3/4" RISERS PER SECTION 1 ON A-07DIVISION 7: THERMAL & MOISTURE PROTECTION1.SUPPLY & INSTALL GRACE VYCOR TAPE AROUND (1) NEW WINDOW TO BASEMENTDIVISION 8: DOORS & WINDOWS1.SUPPLY & INSTALL (2) FIXED GLASS WINDOWS PER PLAN AND DETAILS 2 ON A-06 AND 4 ON A-072.SUPPLY & INSTALL (1) WINDOW PER SCHEDULE IN PLACE OF BASEMENT DOOR; EXISTINGHEADER TO REMAIN3.INSTALL SAVED STORM DOOR IN EXISTING LOCATIONDIVISION 9: FINISHESDECKING1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-052.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER DETAIL 1 ON A-063.FASTEN NEWEL POSTS TO RIM JOIST WITH FASTENMASTER THRU-LOK BOLT REPLACEMENT4.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASEDSEALER5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW DECK6.PROVIDE ACCESS PANEL IN LATTICE PER PLAN7.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE8.PAINT LATTICE AND TRIM TO MATCH BRICK COLORSTAIRS1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-052.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER SECTION 1 ON A-073.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASEDSEALER4.SUPPLY & INSTALL (1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL IN BRONZE MOUNTEDINSIDE IPE RAILINGS5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW STAIRS6.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE7.PAINT LATTICE AND TRIM TO MATCH BRICK COLOROTHER1.SUPPLY & INSTALL FLAT 1 X INTERIOR TRIM AROUND NEW WINDOW IN BASEMENT; ACTUAL TRIMWIDTH TBD BY MASONRY OPENINGAPPROX.MOVE GUTTERDOWNSPOUT HEREAPPROX.(2)- 2 X 8 PTDROP BEAM4 X 4 POSTCONCRETETO REMAINCONCRETETO REMAINNEW CONCRETESIDEWALK HERE
WINDOW SCHEDULE
MANUFACTURER KEY LABEL FL.QTY.JAMB WIDTH HEIGHT M.O.DESCRIPTION EXT. FINISH INT. FINISH SCREEN GRILL TEMP.HARDWARE FINISH HEADER & JACK STUDS
MATHEWS BROS.W01 CUSTOM 0 1 4 9/16"2'-7 3/4"1'-7"2'-10 3/4" X 1'-10"AWNING WINDOW; LOW E WITH ARGON GAS PEARL WHITE PEARL WHITE Y N Y WHITE USE EXISTING
SPENCER WALCOTT
TOTAL 1
2 X 6 IPE RAIL CAP4 X 4 IPE NEWEL POST2 X 2 IPE VERTICALCLEAT1 X 6 IPE BALUSTERSSPACED APPROX.3.13" APART 2 X 6 IPE RAIL CAP2 X 2 IPE VERTICAL CLEAT4 X 4 IPE NEWEL POST1 X 6 IPE BALUSTERSSPACED APPROX.3.13" APARTSPECIFICATIONSDIVISION 2: SITE WORK1.CALL DIG SOFT PRIOR TO START OF WORK2.GRADE UNDER THE DECK WITH SITE MATERIAL. ANYEXCESS WILL BE HAULED OFFSITE3.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST PIERS@ A MIN OF 4' BELOW GRADE4.GRADE DISTURBED AREA OF SITE; PROVIDE ANDSPREAD 4 CY OF SCREENED TOPSOIL, RAKE SEEDAND STRAW MULCH. OWNER TO BE RESPONSIBLEFOR WATERING AND MAINTENANCE 5.NO UTILITY WORK IS INCLUDED6.LATENT SUBSURFACE CONDITIONS REQUIRING SOILSTABILIZATION, ROCK EXCAVATION, DEWATERING ORANY OTHER CONDITION THAT PREVENTSCONSTRUCTION WILL BE AT EXTRA COSTS 7.ROCK IS DEFINED AS BEDROCK OR BOULDERSEXCEEDING ONE CUBIC YARD IN SIZE. DEWATERINGIS DEFINED AS PUMPING OR OTHER DRAINAGEMEASURES DUE TO GROUNDWATER 8.CONTRACTOR SHALL NOT BE LIABLE FOR ANYDAMAGE TO STRUCTURES, DRIVEWAYS, TREES,PLANTS, LAWNS, OR UNDERGROUND PIPES ORSYSTEMS DUE TO CONSTRUCTION ACTIVITIES DIVISION 3: CONCRETE1.SUPPLY, DIG, AND BACKFILL FOR (3) PRECASTSQUARE PIERS @ A MIN OF 4' BELOW GRADE2.INSTALL NEW POURED IN PLACE SIDEWALKS W/WELDED WIRE MESH PER PLAN AND BROOM FINISHDIVISION 4: MASONRY1.FILL IN BELOW BASEMENT WINDOW WITH BRICK TOMATCH EXISTING LOWER WALL BRICK BYALLOWANCEDIVISION 5: METALS1.MOVE WHITE SEAMLESS GUTTER DOWNSPOUT TONEW LOCATION PER PLAN, GUTTER TO TERMINATE @GRADE1 X 4 PRIMEDSELECT PINELATTICE TRIMSQUARE CEDARPRIVACY LATTICEPVC LATTICE TRIM 62 1/2" PANE OF GLASS63" ROUGH OPENING1 X 1 PRIMEDPINE STOPS APPX. ROUGH OPENINGAPPX. WINDOW GLASS1 X 6 IPE DECKING1 X 8 PRIMED PINETRIM BOARD2 X 8 FILLER BETWEEN4 X 4 RAIL POSTS2 X 8 RIM JOIST 4 X 4 IPENEWEL POSTPROVIDE ACCESSPANEL IN LATTICEBELOW DECK HERE PRECASTCONCRETE PIER@ A MIN. OF 4'BELOW GRADE 2 X 2 IPEVERTICAL CLEATMIN. RAIL TORAIL DIMENSIONSET NEW DECK FLOORFLUSH WITH SUNPORCH FLOOR @ DOOR SET TOP OFPIER @ GRADE 1.1" X 6" IPE DECKING PER PLAN 1 ON A-062.FINISH IPE DECKING WITH BENJAMINMOORE CLEAR OIL BASED SEALER3.(3) 2 X 12 PT STRINGERS4.(7) TREADS @ 11" DEEP, WITH 6 3/4"RISERS PER PLAN 1 ON A-061.IPE RAILINGS AND NEWEL POSTS PER PLAN 2 ON A -062.FINISH IPE RAILINGS AND NEWEL POSTS WITHBENJAMIN MOORE CLEAR OIL BASED SEALER3.(1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAILMOUNTED INSIDE IPE RAILING 1.1 X 6 IPEDECKING2.1X 8 TRIM BOARD3.2 X 8 FILLER4.2 X 8 RIM JOIST5.(2)- 2 X 8 PT DROPBEAM6.4 X 4 POST(2)- 2 X 8 PTDROP BEAM4 X 4 POST2 X 6 IPE RAIL CAP4 X 4 IPE NEWEL POST2 X 2 IPE VERTICALCLEAT1 X 6 IPE BALUSTERSSPACED APPROX.3.13" APART2 X 8 RIM JOIST
TO REMAINTO REMAIN TO REMAIN5'-8 1/2"2 PLY 2" X 8" PT
DROP BEAM
TO REMAINTO REMAIN TO REMAIN5'-8 1/2"2" X 8" PT JOISTS
@ 16" O.C.
2" X 8" PT
NAILERS
BRICK TORIM JOIST1" X 8" PRIMED PINE
DECK EDGE TRIM
1" X 8" PRIMED PINE
DECK EDGE TRIM
2" X 8" PT
RIM JOISTS
REUSE SAVED
W02 - 5553 W03 - 5254W01 - CENTERIN OPENINGTO REMAINTO REMAINUP
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR Development & Construction, Inc.110 Pulpit Hill RoadAmherst, Ma 01002413-549-7919 FAX: 413-549-7918 EMAIL: INFO@INTEGBUILD.COMDESIGN BY
HFARMSTRONG-PRASHADRESIDENCE5INTEGRITYA-
SHEET:
DATE:
5/23/2018CONTRACT &BUILDING SET281 PROSPECT ST, NORTHAMPTON, MA 01060DECKPROPOSED BEAM PLAN
1/2" = 1'-0"
PROPOSED WINDOW SCHEDULE1
A-05
1
A-05
2
A-05
2
A-05
PROPOSED JOIST PLAN
1/2" = 1'-0"
3
A-05
3
A-05
PROPOSED DECKING PLAN
1/2" = 1'-0"
4
A-05
4
A-05
4'3'1 1/2"2'-10 1/2"8"WALL KEY
= EXISTING 2x4 INTERIOR WALL
= EXISTING 2x6 EXTERIOR WALL
= EXISTING 2x4 HALF WALL
= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SPECIFICATIONS
DIVISION 6: WOOD & PLASTICS
DECK FRAMING
1.SUPPLY & FASTEN (3) PRECAST SQUARE PIERS WITH SIMPSON ABW44Z POST BASES
2.SUPPLY & INSTALL (3) 4 X 4 PT POSTS
3.FASTEN POSTS TO BEAM USING (1) PAIR OF SIMPSON LPC4Z TWO PIECE POST CAPS PER POST
4.SUPPLY & INSTALL (2) 2 X 8 DROP GIRDER PER PLAN 2 ON A-05
5.SUPPLY & INSTALL 2 X 8 PT JOISTS @ 16" O.C. PER PLAN 3 ON A-05
STAIRS FRAMING
1.SUPPLY & INSTALL (3) 2 X 12 PT STRINGERS
2.BUILD (7) TREADS @ 11" DEEP, WITH 6 3/4" RISERS PER SECTION 1 ON A-07
DIVISION 7: THERMAL & MOISTURE PROTECTION
1.SUPPLY & INSTALL GRACE VYCOR TAPE AROUND (1) NEW WINDOW TO BASEMENT
DIVISION 8: DOORS & WINDOWS
1.SUPPLY & INSTALL (2) FIXED GLASS WINDOWS PER PLAN AND DETAILS 2 ON A-06 AND 4 ON A-07
2.SUPPLY & INSTALL (1) WINDOW PER SCHEDULE IN PLACE OF BASEMENT DOOR; EXISTING
HEADER TO REMAIN
3.INSTALL SAVED STORM DOOR IN EXISTING LOCATION
DIVISION 9: FINISHES
DECKING
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER DETAIL 1 ON A-06
3.FASTEN NEWEL POSTS TO RIM JOIST WITH FASTENMASTER THRU-LOK BOLT REPLACEMENT
4.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW DECK
6.PROVIDE ACCESS PANEL IN LATTICE PER PLAN
7.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
8.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
STAIRS
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER SECTION 1 ON A-07
3.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
4.SUPPLY & INSTALL (1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL IN BRONZE MOUNTED
INSIDE IPE RAILINGS
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW STAIRS
6.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
7.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
OTHER
1.SUPPLY & INSTALL FLAT 1 X INTERIOR TRIM AROUND NEW WINDOW IN BASEMENT; ACTUAL TRIM
WIDTH TBD BY MASONRY OPENING
APPROX.
MOVE GUTTER
DOWNSPOUT HERE
APPROX.(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
CONCRETE
TO REMAIN
CONCRETE
TO REMAIN
NEW CONCRETE
SIDEWALK HERE
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 6 IPE RAIL CAP
2 X 2 IPE VERTICAL CLEAT
4 X 4 IPE NEWEL POST
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
SPECIFICATIONS
DIVISION 2: SITE WORK
1.CALL DIG SOFT PRIOR TO START OF WORK
2.GRADE UNDER THE DECK WITH SITE MATERIAL. ANY
EXCESS WILL BE HAULED OFFSITE
3.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST PIERS
@ A MIN OF 4' BELOW GRADE
4.GRADE DISTURBED AREA OF SITE; PROVIDE AND
SPREAD 4 CY OF SCREENED TOPSOIL, RAKE SEED
AND STRAW MULCH. OWNER TO BE RESPONSIBLE
FOR WATERING AND MAINTENANCE
5.NO UTILITY WORK IS INCLUDED
6.LATENT SUBSURFACE CONDITIONS REQUIRING SOIL
STABILIZATION, ROCK EXCAVATION, DEWATERING OR
ANY OTHER CONDITION THAT PREVENTS
CONSTRUCTION WILL BE AT EXTRA COSTS
7.ROCK IS DEFINED AS BEDROCK OR BOULDERS
EXCEEDING ONE CUBIC YARD IN SIZE. DEWATERING
IS DEFINED AS PUMPING OR OTHER DRAINAGE
MEASURES DUE TO GROUNDWATER
8.CONTRACTOR SHALL NOT BE LIABLE FOR ANY
DAMAGE TO STRUCTURES, DRIVEWAYS, TREES,
PLANTS, LAWNS, OR UNDERGROUND PIPES OR
SYSTEMS DUE TO CONSTRUCTION ACTIVITIES
DIVISION 3: CONCRETE
1.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST
SQUARE PIERS @ A MIN OF 4' BELOW GRADE
2.INSTALL NEW POURED IN PLACE SIDEWALKS W/
WELDED WIRE MESH PER PLAN AND BROOM FINISH
DIVISION 4: MASONRY
1.FILL IN BELOW BASEMENT WINDOW WITH BRICK TO
MATCH EXISTING LOWER WALL BRICK BY
ALLOWANCE
DIVISION 5: METALS
1.MOVE WHITE SEAMLESS GUTTER DOWNSPOUT TO
NEW LOCATION PER PLAN, GUTTER TO TERMINATE @
GRADE
1 X 4 PRIMED
SELECT PINE
LATTICE TRIM
SQUARE CEDAR
PRIVACY LATTICE
PVC LATTICE TRIM
62 1/2" PANE OF GLASS
63" ROUGH OPENING
1 X 1 PRIMED
PINE STOPS
APPX. ROUGH OPENINGAPPX. WINDOW GLASS1 X 6 IPE DECKING
1 X 8 PRIMED PINE
TRIM BOARD
2 X 8 FILLER BETWEEN
4 X 4 RAIL POSTS
2 X 8 RIM JOIST
4 X 4 IPE
NEWEL POST
PROVIDE ACCESS
PANEL IN LATTICE
BELOW DECK HERE
PRECAST
CONCRETE PIER
@ A MIN. OF 4'
BELOW GRADE
2 X 2 IPE
VERTICAL CLEAT
MIN. RAIL TO
RAIL DIMENSION
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SET TOP OF
PIER @ GRADE
1.1" X 6" IPE DECKING PER PLAN 1 ON A-06
2.FINISH IPE DECKING WITH BENJAMIN
MOORE CLEAR OIL BASED SEALER
3.(3) 2 X 12 PT STRINGERS
4.(7) TREADS @ 11" DEEP, WITH 6 3/4"
RISERS PER PLAN 1 ON A-06
1.IPE RAILINGS AND NEWEL POSTS PER PLAN 2 ON A -06
2.FINISH IPE RAILINGS AND NEWEL POSTS WITH
BENJAMIN MOORE CLEAR OIL BASED SEALER
3.(1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL
MOUNTED INSIDE IPE RAILING
1.1 X 6 IPE
DECKING
2.1X 8 TRIM BOARD
3.2 X 8 FILLER
4.2 X 8 RIM JOIST
5.(2)- 2 X 8 PT DROP
BEAM
6.4 X 4 POST
(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 8 RIM JOIST
WALL KEY
= EXISTING 2x4 INTERIOR WALL
= EXISTING 2x6 EXTERIOR WALL
= EXISTING 2x4 HALF WALL
= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SPECIFICATIONS
DIVISION 6: WOOD & PLASTICS
DECK FRAMING
1.SUPPLY & FASTEN (3) PRECAST SQUARE PIERS WITH SIMPSON ABW44Z POST BASES
2.SUPPLY & INSTALL (3) 4 X 4 PT POSTS
3.FASTEN POSTS TO BEAM USING (1) PAIR OF SIMPSON LPC4Z TWO PIECE POST CAPS PER POST
4.SUPPLY & INSTALL (2) 2 X 8 DROP GIRDER PER PLAN 2 ON A-05
5.SUPPLY & INSTALL 2 X 8 PT JOISTS @ 16" O.C. PER PLAN 3 ON A-05
STAIRS FRAMING
1.SUPPLY & INSTALL (3) 2 X 12 PT STRINGERS
2.BUILD (7) TREADS @ 11" DEEP, WITH 6 3/4" RISERS PER SECTION 1 ON A-07
DIVISION 7: THERMAL & MOISTURE PROTECTION
1.SUPPLY & INSTALL GRACE VYCOR TAPE AROUND (1) NEW WINDOW TO BASEMENT
DIVISION 8: DOORS & WINDOWS
1.SUPPLY & INSTALL (2) FIXED GLASS WINDOWS PER PLAN AND DETAILS 2 ON A-06 AND 4 ON A-07
2.SUPPLY & INSTALL (1) WINDOW PER SCHEDULE IN PLACE OF BASEMENT DOOR; EXISTING
HEADER TO REMAIN
3.INSTALL SAVED STORM DOOR IN EXISTING LOCATION
DIVISION 9: FINISHES
DECKING
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER DETAIL 1 ON A-06
3.FASTEN NEWEL POSTS TO RIM JOIST WITH FASTENMASTER THRU-LOK BOLT REPLACEMENT
4.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW DECK
6.PROVIDE ACCESS PANEL IN LATTICE PER PLAN
7.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
8.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
STAIRS
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER SECTION 1 ON A-07
3.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
4.SUPPLY & INSTALL (1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL IN BRONZE MOUNTED
INSIDE IPE RAILINGS
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW STAIRS
6.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
7.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
OTHER
1.SUPPLY & INSTALL FLAT 1 X INTERIOR TRIM AROUND NEW WINDOW IN BASEMENT; ACTUAL TRIM
WIDTH TBD BY MASONRY OPENING
APPROX.
MOVE GUTTER
DOWNSPOUT HERE
APPROX.(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
CONCRETE
TO REMAIN
CONCRETE
TO REMAIN
NEW CONCRETE
SIDEWALK HERE
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 6 IPE RAIL CAP
2 X 2 IPE VERTICAL CLEAT
4 X 4 IPE NEWEL POST
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
SPECIFICATIONS
DIVISION 2: SITE WORK
1.CALL DIG SOFT PRIOR TO START OF WORK
2.GRADE UNDER THE DECK WITH SITE MATERIAL. ANY
EXCESS WILL BE HAULED OFFSITE
3.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST PIERS
@ A MIN OF 4' BELOW GRADE
4.GRADE DISTURBED AREA OF SITE; PROVIDE AND
SPREAD 4 CY OF SCREENED TOPSOIL, RAKE SEED
AND STRAW MULCH. OWNER TO BE RESPONSIBLE
FOR WATERING AND MAINTENANCE
5.NO UTILITY WORK IS INCLUDED
6.LATENT SUBSURFACE CONDITIONS REQUIRING SOIL
STABILIZATION, ROCK EXCAVATION, DEWATERING OR
ANY OTHER CONDITION THAT PREVENTS
CONSTRUCTION WILL BE AT EXTRA COSTS
7.ROCK IS DEFINED AS BEDROCK OR BOULDERS
EXCEEDING ONE CUBIC YARD IN SIZE. DEWATERING
IS DEFINED AS PUMPING OR OTHER DRAINAGE
MEASURES DUE TO GROUNDWATER
8.CONTRACTOR SHALL NOT BE LIABLE FOR ANY
DAMAGE TO STRUCTURES, DRIVEWAYS, TREES,
PLANTS, LAWNS, OR UNDERGROUND PIPES OR
SYSTEMS DUE TO CONSTRUCTION ACTIVITIES
DIVISION 3: CONCRETE
1.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST
SQUARE PIERS @ A MIN OF 4' BELOW GRADE
2.INSTALL NEW POURED IN PLACE SIDEWALKS W/
WELDED WIRE MESH PER PLAN AND BROOM FINISH
DIVISION 4: MASONRY
1.FILL IN BELOW BASEMENT WINDOW WITH BRICK TO
MATCH EXISTING LOWER WALL BRICK BY
ALLOWANCE
DIVISION 5: METALS
1.MOVE WHITE SEAMLESS GUTTER DOWNSPOUT TO
NEW LOCATION PER PLAN, GUTTER TO TERMINATE @
GRADE
1 X 4 PRIMED
SELECT PINE
LATTICE TRIM
SQUARE CEDAR
PRIVACY LATTICE
PVC LATTICE TRIM
62 1/2" PANE OF GLASS
63" ROUGH OPENING
1 X 1 PRIMED
PINE STOPS
APPX. ROUGH OPENINGAPPX. WINDOW GLASS1 X 6 IPE DECKING
1 X 8 PRIMED PINE
TRIM BOARD
2 X 8 FILLER BETWEEN
4 X 4 RAIL POSTS
2 X 8 RIM JOIST
4 X 4 IPE
NEWEL POST
PROVIDE ACCESS
PANEL IN LATTICE
BELOW DECK HERE
PRECAST
CONCRETE PIER
@ A MIN. OF 4'
BELOW GRADE
2 X 2 IPE
VERTICAL CLEAT
MIN. RAIL TO
RAIL DIMENSION
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SET TOP OF
PIER @ GRADE
1.1" X 6" IPE DECKING PER PLAN 1 ON A-06
2.FINISH IPE DECKING WITH BENJAMIN
MOORE CLEAR OIL BASED SEALER
3.(3) 2 X 12 PT STRINGERS
4.(7) TREADS @ 11" DEEP, WITH 6 3/4"
RISERS PER PLAN 1 ON A-06
1.IPE RAILINGS AND NEWEL POSTS PER PLAN 2 ON A -06
2.FINISH IPE RAILINGS AND NEWEL POSTS WITH
BENJAMIN MOORE CLEAR OIL BASED SEALER
3.(1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL
MOUNTED INSIDE IPE RAILING
1.1 X 6 IPE
DECKING
2.1X 8 TRIM BOARD
3.2 X 8 FILLER
4.2 X 8 RIM JOIST
5.(2)- 2 X 8 PT DROP
BEAM
6.4 X 4 POST
(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 8 RIM JOIST
5'-2 1/2"5'-3"WALL KEY
= EXISTING 2x4 INTERIOR WALL
= EXISTING 2x6 EXTERIOR WALL
= EXISTING 2x4 HALF WALL
= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SPECIFICATIONS
DIVISION 6: WOOD & PLASTICS
DECK FRAMING
1.SUPPLY & FASTEN (3) PRECAST SQUARE PIERS WITH SIMPSON ABW44Z POST BASES
2.SUPPLY & INSTALL (3) 4 X 4 PT POSTS
3.FASTEN POSTS TO BEAM USING (1) PAIR OF SIMPSON LPC4Z TWO PIECE POST CAPS PER POST
4.SUPPLY & INSTALL (2) 2 X 8 DROP GIRDER PER PLAN 2 ON A-05
5.SUPPLY & INSTALL 2 X 8 PT JOISTS @ 16" O.C. PER PLAN 3 ON A-05
STAIRS FRAMING
1.SUPPLY & INSTALL (3) 2 X 12 PT STRINGERS
2.BUILD (7) TREADS @ 11" DEEP, WITH 6 3/4" RISERS PER SECTION 1 ON A-07
DIVISION 7: THERMAL & MOISTURE PROTECTION
1.SUPPLY & INSTALL GRACE VYCOR TAPE AROUND (1) NEW WINDOW TO BASEMENT
DIVISION 8: DOORS & WINDOWS
1.SUPPLY & INSTALL (2) FIXED GLASS WINDOWS PER PLAN AND DETAILS 2 ON A-06 AND 4 ON A-07
2.SUPPLY & INSTALL (1) WINDOW PER SCHEDULE IN PLACE OF BASEMENT DOOR; EXISTING
HEADER TO REMAIN
3.INSTALL SAVED STORM DOOR IN EXISTING LOCATION
DIVISION 9: FINISHES
DECKING
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER DETAIL 1 ON A-06
3.FASTEN NEWEL POSTS TO RIM JOIST WITH FASTENMASTER THRU-LOK BOLT REPLACEMENT
4.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW DECK
6.PROVIDE ACCESS PANEL IN LATTICE PER PLAN
7.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
8.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
STAIRS
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER SECTION 1 ON A-07
3.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
4.SUPPLY & INSTALL (1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL IN BRONZE MOUNTED
INSIDE IPE RAILINGS
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW STAIRS
6.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
7.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
OTHER
1.SUPPLY & INSTALL FLAT 1 X INTERIOR TRIM AROUND NEW WINDOW IN BASEMENT; ACTUAL TRIM
WIDTH TBD BY MASONRY OPENING
APPROX.
MOVE GUTTER
DOWNSPOUT HERE
APPROX.(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
CONCRETE
TO REMAIN
CONCRETE
TO REMAIN
NEW CONCRETE
SIDEWALK HERE
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 6 IPE RAIL CAP
2 X 2 IPE VERTICAL CLEAT
4 X 4 IPE NEWEL POST
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
SPECIFICATIONS
DIVISION 2: SITE WORK
1.CALL DIG SOFT PRIOR TO START OF WORK
2.GRADE UNDER THE DECK WITH SITE MATERIAL. ANY
EXCESS WILL BE HAULED OFFSITE
3.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST PIERS
@ A MIN OF 4' BELOW GRADE
4.GRADE DISTURBED AREA OF SITE; PROVIDE AND
SPREAD 4 CY OF SCREENED TOPSOIL, RAKE SEED
AND STRAW MULCH. OWNER TO BE RESPONSIBLE
FOR WATERING AND MAINTENANCE
5.NO UTILITY WORK IS INCLUDED
6.LATENT SUBSURFACE CONDITIONS REQUIRING SOIL
STABILIZATION, ROCK EXCAVATION, DEWATERING OR
ANY OTHER CONDITION THAT PREVENTS
CONSTRUCTION WILL BE AT EXTRA COSTS
7.ROCK IS DEFINED AS BEDROCK OR BOULDERS
EXCEEDING ONE CUBIC YARD IN SIZE. DEWATERING
IS DEFINED AS PUMPING OR OTHER DRAINAGE
MEASURES DUE TO GROUNDWATER
8.CONTRACTOR SHALL NOT BE LIABLE FOR ANY
DAMAGE TO STRUCTURES, DRIVEWAYS, TREES,
PLANTS, LAWNS, OR UNDERGROUND PIPES OR
SYSTEMS DUE TO CONSTRUCTION ACTIVITIES
DIVISION 3: CONCRETE
1.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST
SQUARE PIERS @ A MIN OF 4' BELOW GRADE
2.INSTALL NEW POURED IN PLACE SIDEWALKS W/
WELDED WIRE MESH PER PLAN AND BROOM FINISH
DIVISION 4: MASONRY
1.FILL IN BELOW BASEMENT WINDOW WITH BRICK TO
MATCH EXISTING LOWER WALL BRICK BY
ALLOWANCE
DIVISION 5: METALS
1.MOVE WHITE SEAMLESS GUTTER DOWNSPOUT TO
NEW LOCATION PER PLAN, GUTTER TO TERMINATE @
GRADE
1 X 4 PRIMED
SELECT PINE
LATTICE TRIM
SQUARE CEDAR
PRIVACY LATTICE
PVC LATTICE TRIM
62 1/2" PANE OF GLASS
63" ROUGH OPENING
1 X 1 PRIMED
PINE STOPS
APPX. ROUGH OPENINGAPPX. WINDOW GLASS1 X 6 IPE DECKING
1 X 8 PRIMED PINE
TRIM BOARD
2 X 8 FILLER BETWEEN
4 X 4 RAIL POSTS
2 X 8 RIM JOIST
4 X 4 IPE
NEWEL POST
PROVIDE ACCESS
PANEL IN LATTICE
BELOW DECK HERE
PRECAST
CONCRETE PIER
@ A MIN. OF 4'
BELOW GRADE
2 X 2 IPE
VERTICAL CLEAT
MIN. RAIL TO
RAIL DIMENSION
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SET TOP OF
PIER @ GRADE
1.1" X 6" IPE DECKING PER PLAN 1 ON A-06
2.FINISH IPE DECKING WITH BENJAMIN
MOORE CLEAR OIL BASED SEALER
3.(3) 2 X 12 PT STRINGERS
4.(7) TREADS @ 11" DEEP, WITH 6 3/4"
RISERS PER PLAN 1 ON A-06
1.IPE RAILINGS AND NEWEL POSTS PER PLAN 2 ON A -06
2.FINISH IPE RAILINGS AND NEWEL POSTS WITH
BENJAMIN MOORE CLEAR OIL BASED SEALER
3.(1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL
MOUNTED INSIDE IPE RAILING
1.1 X 6 IPE
DECKING
2.1X 8 TRIM BOARD
3.2 X 8 FILLER
4.2 X 8 RIM JOIST
5.(2)- 2 X 8 PT DROP
BEAM
6.4 X 4 POST
(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 8 RIM JOIST 1/2"3/4"WALL KEY
= EXISTING 2x4 INTERIOR WALL
= EXISTING 2x6 EXTERIOR WALL
= EXISTING 2x4 HALF WALL
= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SPECIFICATIONS
DIVISION 6: WOOD & PLASTICS
DECK FRAMING
1.SUPPLY & FASTEN (3) PRECAST SQUARE PIERS WITH SIMPSON ABW44Z POST BASES
2.SUPPLY & INSTALL (3) 4 X 4 PT POSTS
3.FASTEN POSTS TO BEAM USING (1) PAIR OF SIMPSON LPC4Z TWO PIECE POST CAPS PER POST
4.SUPPLY & INSTALL (2) 2 X 8 DROP GIRDER PER PLAN 2 ON A-05
5.SUPPLY & INSTALL 2 X 8 PT JOISTS @ 16" O.C. PER PLAN 3 ON A-05
STAIRS FRAMING
1.SUPPLY & INSTALL (3) 2 X 12 PT STRINGERS
2.BUILD (7) TREADS @ 11" DEEP, WITH 6 3/4" RISERS PER SECTION 1 ON A-07
DIVISION 7: THERMAL & MOISTURE PROTECTION
1.SUPPLY & INSTALL GRACE VYCOR TAPE AROUND (1) NEW WINDOW TO BASEMENT
DIVISION 8: DOORS & WINDOWS
1.SUPPLY & INSTALL (2) FIXED GLASS WINDOWS PER PLAN AND DETAILS 2 ON A-06 AND 4 ON A-07
2.SUPPLY & INSTALL (1) WINDOW PER SCHEDULE IN PLACE OF BASEMENT DOOR; EXISTING
HEADER TO REMAIN
3.INSTALL SAVED STORM DOOR IN EXISTING LOCATION
DIVISION 9: FINISHES
DECKING
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER DETAIL 1 ON A-06
3.FASTEN NEWEL POSTS TO RIM JOIST WITH FASTENMASTER THRU-LOK BOLT REPLACEMENT
4.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW DECK
6.PROVIDE ACCESS PANEL IN LATTICE PER PLAN
7.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
8.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
STAIRS
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER SECTION 1 ON A-07
3.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
4.SUPPLY & INSTALL (1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL IN BRONZE MOUNTED
INSIDE IPE RAILINGS
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW STAIRS
6.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
7.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
OTHER
1.SUPPLY & INSTALL FLAT 1 X INTERIOR TRIM AROUND NEW WINDOW IN BASEMENT; ACTUAL TRIM
WIDTH TBD BY MASONRY OPENING
APPROX.
MOVE GUTTER
DOWNSPOUT HERE
APPROX.(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
CONCRETE
TO REMAIN
CONCRETE
TO REMAIN
NEW CONCRETE
SIDEWALK HERE
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 6 IPE RAIL CAP
2 X 2 IPE VERTICAL CLEAT
4 X 4 IPE NEWEL POST
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
SPECIFICATIONS
DIVISION 2: SITE WORK
1.CALL DIG SOFT PRIOR TO START OF WORK
2.GRADE UNDER THE DECK WITH SITE MATERIAL. ANY
EXCESS WILL BE HAULED OFFSITE
3.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST PIERS
@ A MIN OF 4' BELOW GRADE
4.GRADE DISTURBED AREA OF SITE; PROVIDE AND
SPREAD 4 CY OF SCREENED TOPSOIL, RAKE SEED
AND STRAW MULCH. OWNER TO BE RESPONSIBLE
FOR WATERING AND MAINTENANCE
5.NO UTILITY WORK IS INCLUDED
6.LATENT SUBSURFACE CONDITIONS REQUIRING SOIL
STABILIZATION, ROCK EXCAVATION, DEWATERING OR
ANY OTHER CONDITION THAT PREVENTS
CONSTRUCTION WILL BE AT EXTRA COSTS
7.ROCK IS DEFINED AS BEDROCK OR BOULDERS
EXCEEDING ONE CUBIC YARD IN SIZE. DEWATERING
IS DEFINED AS PUMPING OR OTHER DRAINAGE
MEASURES DUE TO GROUNDWATER
8.CONTRACTOR SHALL NOT BE LIABLE FOR ANY
DAMAGE TO STRUCTURES, DRIVEWAYS, TREES,
PLANTS, LAWNS, OR UNDERGROUND PIPES OR
SYSTEMS DUE TO CONSTRUCTION ACTIVITIES
DIVISION 3: CONCRETE
1.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST
SQUARE PIERS @ A MIN OF 4' BELOW GRADE
2.INSTALL NEW POURED IN PLACE SIDEWALKS W/
WELDED WIRE MESH PER PLAN AND BROOM FINISH
DIVISION 4: MASONRY
1.FILL IN BELOW BASEMENT WINDOW WITH BRICK TO
MATCH EXISTING LOWER WALL BRICK BY
ALLOWANCE
DIVISION 5: METALS
1.MOVE WHITE SEAMLESS GUTTER DOWNSPOUT TO
NEW LOCATION PER PLAN, GUTTER TO TERMINATE @
GRADE
1 X 4 PRIMED
SELECT PINE
LATTICE TRIM
SQUARE CEDAR
PRIVACY LATTICE
PVC LATTICE TRIM
62 1/2" PANE OF GLASS
63" ROUGH OPENING
1 X 1 PRIMED
PINE STOPS
APPX. ROUGH OPENINGAPPX. WINDOW GLASS1 X 6 IPE DECKING
1 X 8 PRIMED PINE
TRIM BOARD
2 X 8 FILLER BETWEEN
4 X 4 RAIL POSTS
2 X 8 RIM JOIST
4 X 4 IPE
NEWEL POST
PROVIDE ACCESS
PANEL IN LATTICE
BELOW DECK HERE
PRECAST
CONCRETE PIER
@ A MIN. OF 4'
BELOW GRADE
2 X 2 IPE
VERTICAL CLEAT
MIN. RAIL TO
RAIL DIMENSION
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SET TOP OF
PIER @ GRADE
1.1" X 6" IPE DECKING PER PLAN 1 ON A-06
2.FINISH IPE DECKING WITH BENJAMIN
MOORE CLEAR OIL BASED SEALER
3.(3) 2 X 12 PT STRINGERS
4.(7) TREADS @ 11" DEEP, WITH 6 3/4"
RISERS PER PLAN 1 ON A-06
1.IPE RAILINGS AND NEWEL POSTS PER PLAN 2 ON A -06
2.FINISH IPE RAILINGS AND NEWEL POSTS WITH
BENJAMIN MOORE CLEAR OIL BASED SEALER
3.(1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL
MOUNTED INSIDE IPE RAILING
1.1 X 6 IPE
DECKING
2.1X 8 TRIM BOARD
3.2 X 8 FILLER
4.2 X 8 RIM JOIST
5.(2)- 2 X 8 PT DROP
BEAM
6.4 X 4 POST
(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 8 RIM JOIST
5 1/4"3'-8"1 1/2"2'-10 1/2"8"WALL KEY
= EXISTING 2x4 INTERIOR WALL
= EXISTING 2x6 EXTERIOR WALL
= EXISTING 2x4 HALF WALL
= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SPECIFICATIONS
DIVISION 6: WOOD & PLASTICS
DECK FRAMING
1.SUPPLY & FASTEN (3) PRECAST SQUARE PIERS WITH SIMPSON ABW44Z POST BASES
2.SUPPLY & INSTALL (3) 4 X 4 PT POSTS
3.FASTEN POSTS TO BEAM USING (1) PAIR OF SIMPSON LPC4Z TWO PIECE POST CAPS PER POST
4.SUPPLY & INSTALL (2) 2 X 8 DROP GIRDER PER PLAN 2 ON A-05
5.SUPPLY & INSTALL 2 X 8 PT JOISTS @ 16" O.C. PER PLAN 3 ON A-05
STAIRS FRAMING
1.SUPPLY & INSTALL (3) 2 X 12 PT STRINGERS
2.BUILD (7) TREADS @ 11" DEEP, WITH 6 3/4" RISERS PER SECTION 1 ON A-07
DIVISION 7: THERMAL & MOISTURE PROTECTION
1.SUPPLY & INSTALL GRACE VYCOR TAPE AROUND (1) NEW WINDOW TO BASEMENT
DIVISION 8: DOORS & WINDOWS
1.SUPPLY & INSTALL (2) FIXED GLASS WINDOWS PER PLAN AND DETAILS 2 ON A-06 AND 4 ON A-07
2.SUPPLY & INSTALL (1) WINDOW PER SCHEDULE IN PLACE OF BASEMENT DOOR; EXISTING
HEADER TO REMAIN
3.INSTALL SAVED STORM DOOR IN EXISTING LOCATION
DIVISION 9: FINISHES
DECKING
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER DETAIL 1 ON A-06
3.FASTEN NEWEL POSTS TO RIM JOIST WITH FASTENMASTER THRU-LOK BOLT REPLACEMENT
4.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW DECK
6.PROVIDE ACCESS PANEL IN LATTICE PER PLAN
7.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
8.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
STAIRS
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER SECTION 1 ON A-07
3.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
4.SUPPLY & INSTALL (1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL IN BRONZE MOUNTED
INSIDE IPE RAILINGS
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW STAIRS
6.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
7.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
OTHER
1.SUPPLY & INSTALL FLAT 1 X INTERIOR TRIM AROUND NEW WINDOW IN BASEMENT; ACTUAL TRIM
WIDTH TBD BY MASONRY OPENING
APPROX.
MOVE GUTTER
DOWNSPOUT HERE
APPROX.(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
CONCRETE
TO REMAIN
CONCRETE
TO REMAIN
NEW CONCRETE
SIDEWALK HERE
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 6 IPE RAIL CAP
2 X 2 IPE VERTICAL CLEAT
4 X 4 IPE NEWEL POST
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
SPECIFICATIONS
DIVISION 2: SITE WORK
1.CALL DIG SOFT PRIOR TO START OF WORK
2.GRADE UNDER THE DECK WITH SITE MATERIAL. ANY
EXCESS WILL BE HAULED OFFSITE
3.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST PIERS
@ A MIN OF 4' BELOW GRADE
4.GRADE DISTURBED AREA OF SITE; PROVIDE AND
SPREAD 4 CY OF SCREENED TOPSOIL, RAKE SEED
AND STRAW MULCH. OWNER TO BE RESPONSIBLE
FOR WATERING AND MAINTENANCE
5.NO UTILITY WORK IS INCLUDED
6.LATENT SUBSURFACE CONDITIONS REQUIRING SOIL
STABILIZATION, ROCK EXCAVATION, DEWATERING OR
ANY OTHER CONDITION THAT PREVENTS
CONSTRUCTION WILL BE AT EXTRA COSTS
7.ROCK IS DEFINED AS BEDROCK OR BOULDERS
EXCEEDING ONE CUBIC YARD IN SIZE. DEWATERING
IS DEFINED AS PUMPING OR OTHER DRAINAGE
MEASURES DUE TO GROUNDWATER
8.CONTRACTOR SHALL NOT BE LIABLE FOR ANY
DAMAGE TO STRUCTURES, DRIVEWAYS, TREES,
PLANTS, LAWNS, OR UNDERGROUND PIPES OR
SYSTEMS DUE TO CONSTRUCTION ACTIVITIES
DIVISION 3: CONCRETE
1.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST
SQUARE PIERS @ A MIN OF 4' BELOW GRADE
2.INSTALL NEW POURED IN PLACE SIDEWALKS W/
WELDED WIRE MESH PER PLAN AND BROOM FINISH
DIVISION 4: MASONRY
1.FILL IN BELOW BASEMENT WINDOW WITH BRICK TO
MATCH EXISTING LOWER WALL BRICK BY
ALLOWANCE
DIVISION 5: METALS
1.MOVE WHITE SEAMLESS GUTTER DOWNSPOUT TO
NEW LOCATION PER PLAN, GUTTER TO TERMINATE @
GRADE
1 X 4 PRIMED
SELECT PINE
LATTICE TRIM
SQUARE CEDAR
PRIVACY LATTICE
PVC LATTICE TRIM
62 1/2" PANE OF GLASS
63" ROUGH OPENING
1 X 1 PRIMED
PINE STOPS
APPX. ROUGH OPENINGAPPX. WINDOW GLASS1 X 6 IPE DECKING
1 X 8 PRIMED PINE
TRIM BOARD
2 X 8 FILLER BETWEEN
4 X 4 RAIL POSTS
2 X 8 RIM JOIST
4 X 4 IPE
NEWEL POST
PROVIDE ACCESS
PANEL IN LATTICE
BELOW DECK HERE
PRECAST
CONCRETE PIER
@ A MIN. OF 4'
BELOW GRADE
2 X 2 IPE
VERTICAL CLEAT
MIN. RAIL TO
RAIL DIMENSION
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SET TOP OF
PIER @ GRADE
1.1" X 6" IPE DECKING PER PLAN 1 ON A-06
2.FINISH IPE DECKING WITH BENJAMIN
MOORE CLEAR OIL BASED SEALER
3.(3) 2 X 12 PT STRINGERS
4.(7) TREADS @ 11" DEEP, WITH 6 3/4"
RISERS PER PLAN 1 ON A-06
1.IPE RAILINGS AND NEWEL POSTS PER PLAN 2 ON A -06
2.FINISH IPE RAILINGS AND NEWEL POSTS WITH
BENJAMIN MOORE CLEAR OIL BASED SEALER
3.(1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL
MOUNTED INSIDE IPE RAILING
1.1 X 6 IPE
DECKING
2.1X 8 TRIM BOARD
3.2 X 8 FILLER
4.2 X 8 RIM JOIST
5.(2)- 2 X 8 PT DROP
BEAM
6.4 X 4 POST
(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 8 RIM JOIST Development & Construction, Inc.110 Pulpit Hill RoadAmherst, Ma 01002413-549-7919 FAX: 413-549-7918 EMAIL: INFO@INTEGBUILD.COMDESIGN BY
HFARMSTRONG-PRASHADRESIDENCE6INTEGRITYA-
SHEET:
DATE:
5/23/2018CONTRACT &BUILDING SET281 PROSPECT ST, NORTHAMPTON, MA 01060DECKPROPOSED WINDOW SECTION
1" = 1'-0"
2
A-06
2
A-06
PROPOSED RAIL SECTION
1" = 1'-0"
3
A-06
3
A-06
1
A-06
1
A-06
PROPOSED NEWEL DETAIL
1/2" = 1'-0"
TO REMAIN
REUSE SAVED
W02 - 5553
TO REMAIN
REUSE SAVED
W02 - 5553
TO REMAIN
TO REMAIN
TO REMAIN
TO REMAIN
W03 - 5254
TO REMAINTO REMAIN
TO REMAIN
TO REMAIN
TO REMAIN
TO REMAIN
TO REMAIN
TO REMAIN
W03 - 5254
TO REMAINTO REMAIN
TO REMAIN
TO REMAIN
WALL KEY
= EXISTING 2x4 INTERIOR WALL
= EXISTING 2x6 EXTERIOR WALL
= EXISTING 2x4 HALF WALL
= DEMO. 2x4 INTERIOR WALL
= DEMO. 2x6 EXTERIOR WALL
= DEMO 2x4 HALF WALL
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SPECIFICATIONS
DIVISION 6: WOOD & PLASTICS
DECK FRAMING
1.SUPPLY & FASTEN (3) PRECAST SQUARE PIERS WITH SIMPSON ABW44Z POST BASES
2.SUPPLY & INSTALL (3) 4 X 4 PT POSTS
3.FASTEN POSTS TO BEAM USING (1) PAIR OF SIMPSON LPC4Z TWO PIECE POST CAPS PER POST
4.SUPPLY & INSTALL (2) 2 X 8 DROP GIRDER PER PLAN 2 ON A-05
5.SUPPLY & INSTALL 2 X 8 PT JOISTS @ 16" O.C. PER PLAN 3 ON A-05
STAIRS FRAMING
1.SUPPLY & INSTALL (3) 2 X 12 PT STRINGERS
2.BUILD (7) TREADS @ 11" DEEP, WITH 6 3/4" RISERS PER SECTION 1 ON A-07
DIVISION 7: THERMAL & MOISTURE PROTECTION
1.SUPPLY & INSTALL GRACE VYCOR TAPE AROUND (1) NEW WINDOW TO BASEMENT
DIVISION 8: DOORS & WINDOWS
1.SUPPLY & INSTALL (2) FIXED GLASS WINDOWS PER PLAN AND DETAILS 2 ON A-06 AND 4 ON A-07
2.SUPPLY & INSTALL (1) WINDOW PER SCHEDULE IN PLACE OF BASEMENT DOOR; EXISTING
HEADER TO REMAIN
3.INSTALL SAVED STORM DOOR IN EXISTING LOCATION
DIVISION 9: FINISHES
DECKING
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER DETAIL 1 ON A-06
3.FASTEN NEWEL POSTS TO RIM JOIST WITH FASTENMASTER THRU-LOK BOLT REPLACEMENT
4.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW DECK
6.PROVIDE ACCESS PANEL IN LATTICE PER PLAN
7.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
8.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
STAIRS
1.SUPPLY & INSTALL 1" X 6" IPE DECKING PER PLAN 4 ON A-05
2.SUPPLY & INSTALL IPE RAILINGS AND NEWEL POSTS PER SECTION 1 ON A-07
3.FINISH IPE DECKING, RAILINGS, AND NEWEL POSTS WITH BENJAMIN MOORE CLEAR OIL BASED
SEALER
4.SUPPLY & INSTALL (1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL IN BRONZE MOUNTED
INSIDE IPE RAILINGS
5.SUPPLY & INSTALL SQUARE CEDAR PRIVACY LATTICE BELOW STAIRS
6.SUPPLY & INSTALL 1 X 4 PRIMED SELECT PINE TRIM ON LATTICE
7.PAINT LATTICE AND TRIM TO MATCH BRICK COLOR
OTHER
1.SUPPLY & INSTALL FLAT 1 X INTERIOR TRIM AROUND NEW WINDOW IN BASEMENT; ACTUAL TRIM
WIDTH TBD BY MASONRY OPENING
APPROX.
MOVE GUTTER
DOWNSPOUT HERE
APPROX.(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
CONCRETE
TO REMAIN
CONCRETE
TO REMAIN
NEW CONCRETE
SIDEWALK HERE
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 6 IPE RAIL CAP
2 X 2 IPE VERTICAL CLEAT
4 X 4 IPE NEWEL POST
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
SPECIFICATIONS
DIVISION 2: SITE WORK
1.CALL DIG SOFT PRIOR TO START OF WORK
2.GRADE UNDER THE DECK WITH SITE MATERIAL. ANY
EXCESS WILL BE HAULED OFFSITE
3.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST PIERS
@ A MIN OF 4' BELOW GRADE
4.GRADE DISTURBED AREA OF SITE; PROVIDE AND
SPREAD 4 CY OF SCREENED TOPSOIL, RAKE SEED
AND STRAW MULCH. OWNER TO BE RESPONSIBLE
FOR WATERING AND MAINTENANCE
5.NO UTILITY WORK IS INCLUDED
6.LATENT SUBSURFACE CONDITIONS REQUIRING SOIL
STABILIZATION, ROCK EXCAVATION, DEWATERING OR
ANY OTHER CONDITION THAT PREVENTS
CONSTRUCTION WILL BE AT EXTRA COSTS
7.ROCK IS DEFINED AS BEDROCK OR BOULDERS
EXCEEDING ONE CUBIC YARD IN SIZE. DEWATERING
IS DEFINED AS PUMPING OR OTHER DRAINAGE
MEASURES DUE TO GROUNDWATER
8.CONTRACTOR SHALL NOT BE LIABLE FOR ANY
DAMAGE TO STRUCTURES, DRIVEWAYS, TREES,
PLANTS, LAWNS, OR UNDERGROUND PIPES OR
SYSTEMS DUE TO CONSTRUCTION ACTIVITIES
DIVISION 3: CONCRETE
1.SUPPLY, DIG, AND BACKFILL FOR (3) PRECAST
SQUARE PIERS @ A MIN OF 4' BELOW GRADE
2.INSTALL NEW POURED IN PLACE SIDEWALKS W/
WELDED WIRE MESH PER PLAN AND BROOM FINISH
DIVISION 4: MASONRY
1.FILL IN BELOW BASEMENT WINDOW WITH BRICK TO
MATCH EXISTING LOWER WALL BRICK BY
ALLOWANCE
DIVISION 5: METALS
1.MOVE WHITE SEAMLESS GUTTER DOWNSPOUT TO
NEW LOCATION PER PLAN, GUTTER TO TERMINATE @
GRADE
1 X 4 PRIMED
SELECT PINE
LATTICE TRIM
SQUARE CEDAR
PRIVACY LATTICE
PVC LATTICE TRIM
62 1/2" PANE OF GLASS
63" ROUGH OPENING
1 X 1 PRIMED
PINE STOPS
APPX. ROUGH OPENINGAPPX. WINDOW GLASS1 X 6 IPE DECKING
1 X 8 PRIMED PINE
TRIM BOARD
2 X 8 FILLER BETWEEN
4 X 4 RAIL POSTS
2 X 8 RIM JOIST
4 X 4 IPE
NEWEL POST
PROVIDE ACCESS
PANEL IN LATTICE
BELOW DECK HERE
PRECAST
CONCRETE PIER
@ A MIN. OF 4'
BELOW GRADE
2 X 2 IPE
VERTICAL CLEAT
MIN. RAIL TO
RAIL DIMENSION
SET NEW DECK FLOOR
FLUSH WITH SUN
PORCH FLOOR @ DOOR
SET TOP OF
PIER @ GRADE
1.1" X 6" IPE DECKING PER PLAN 1 ON A-06
2.FINISH IPE DECKING WITH BENJAMIN
MOORE CLEAR OIL BASED SEALER
3.(3) 2 X 12 PT STRINGERS
4.(7) TREADS @ 11" DEEP, WITH 6 3/4"
RISERS PER PLAN 1 ON A-06
1.IPE RAILINGS AND NEWEL POSTS PER PLAN 2 ON A -06
2.FINISH IPE RAILINGS AND NEWEL POSTS WITH
BENJAMIN MOORE CLEAR OIL BASED SEALER
3.(1) WOLF ALUMINUM 1-3/8" GRASPABLE HANDRAIL
MOUNTED INSIDE IPE RAILING
1.1 X 6 IPE
DECKING
2.1X 8 TRIM BOARD
3.2 X 8 FILLER
4.2 X 8 RIM JOIST
5.(2)- 2 X 8 PT DROP
BEAM
6.4 X 4 POST
(2)- 2 X 8 PT
DROP BEAM
4 X 4 POST
2 X 6 IPE RAIL CAP
4 X 4 IPE NEWEL POST
2 X 2 IPE VERTICAL
CLEAT
1 X 6 IPE BALUSTERS
SPACED APPROX.
3.13" APART
2 X 8 RIM JOIST
REUSE SAVED
W02 - 5553
GLASS APPX. 5'-5" X 5'-2 1/2"
MEASURE IN FIELD
REUSE SAVED
W02 - 5553
TO REMAIN
W03 - 5254
TO REMAIN
GLASS APPX. 5'-2" X 5'-3 1/2"
MEASURE IN FIELD
TO REMAIN
W03 - 5254
TO REMAIN Development & Construction, Inc.110 Pulpit Hill RoadAmherst, Ma 01002413-549-7919 FAX: 413-549-7918 EMAIL: INFO@INTEGBUILD.COMDESIGN BY
HFARMSTRONG-PRASHADRESIDENCE7INTEGRITYA-
SHEET:
DATE:
5/23/2018CONTRACT &BUILDING SET281 PROSPECT ST, NORTHAMPTON, MA 01060DECK3
A-07
3
A-07
PROPOSED ELEVATION
1/4" = 1'-0"
2
A-07
2
A-07
PROPOSED NORTH ELEVATION
1/4" = 1'-0"
PROPOSED STAIR SECTION
1/2" = 1'-0"
1
A-07
1
A-07
PROPOSED WINDOW ELEVATIONS
1/2" = 1'-0"
4
A-06
4
A-06