Pioneer Valley Books Roof Reinforcement Final Cnstruction Control Document 2-5-19.pdf
Version 01_01_2018 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the ninth edition of the Massachusetts
State Building Code, 780 CMR, Section 107 Project Title: Pioneer Valley Books: Roof Reinforcement Date: 2/5/19 Permit No. BP- 2019- 0352 Property
Address: 199 Pine Street, Northampton, MA Project: Check (x) one or both as applicable: New construction X Existing Construction Project description:
Structural reinforcement of existing steel roof beams and the installation of new cee purlins bolted to existing cee purlins of the existing 250’x 336’ warehouse to provide adequate
support for the code required snow loads, additional roof insulation, roofing membrane, and the installation of a large array of PV solar panels. All structural work has been completed
in accordance with the approved plans. I, David Vreeland, MA Registration Number: 46317, Expiration date: 6/30/2020, am a registered design professional, and I have prepared or directly
supervised the preparation of all design plans, computations and specifications concerning: Architectural X Structural Mechanical
Fire Protection Electrical X Other: Describe – Construction control for the above named project. I, or my designee, have performed
the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded
in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this
code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the
duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar
with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document
relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a “wet” or electronic signature and seal: