Loading...
199 Pine meeting minutes 3-21-17Job Meeting Notes Date: March 21, 2017 Location: Pioneer Valley Educational Press 199 Pine Street Warehouse Project Florence, MA 01062 Project Status: Sprinkler work is complete. Plumbing Inspection was completed but will not be signed off until the bollards are installed to prevent motor vehicle entry via the overhead door. New Items: We will need a final sign off from the Building Plumbing and Electrical Inspectors prior to Occupancy. 3/21/17. Roofing repairs nearly complete. We have a couple persistent leaks we are working to correct. 3/21/17. Rack installation schedule to allow completion of the Fire Alarm and emergency / Exit lighting. Open Items: We have a leak in the underground sprinkler system. We have a contractor scheduled for Friday 2/24 to attempt to locate the problem. The leak is the post indicator valve and a cost estimate has been submitted for approval. The faulty PIV (post indicator valve) has been replaced. Work has been completed. A cleaning service will be scheduled to clean the bathrooms and break area and sweep the main warehouse floor. BKN to be onsite today 2/28 to review. Work has been completed. The electricians need the NEMA configuration for the forklift charging outlets. Owner Contractor Items: Crocker will provide updated billing including the credits and extras for the end of this month. Next scheduled meeting date is Tuesday, March 28th, 10:00 am at the jobsite.