Loading...
38B-121 HEADER FRAME08LINE UP STRUCTURAL POST WITH STRUCTURAL RIDGEDo Notcut, notch or drill flangesDo Notcut holes near bearing supportto AJS20 joist with 8dLoad bearing wall aboveLoad bearing wall aboveN/A N/A FINAL DESCRIPTION: 08/06/15 N/A N/A DATE:ISSUE: N/A N/A FINAL 1st walls LAYOUT SHEET NUMBER: 1NOTES:Scale: 1/4" = 1'rk Miles Inc.21 West St.West Hatfield Ma.Ross Steve/Shearer JOB: Shearer DESIGNED BY: Doug Hodgins SHIPPING INFORMATION: D2X2N2X1S2XPRThis layout has been created using the information from the plan provided, and/or verbal informationfrom the general contractor. r.k Miles assumes no responsibility for this layout ifaltered during construction or any of the structural members shown are not supplied by r.k. MilesIt is the responsibility of the building contractor / owner to install and / or oversee the installationof all the engineered wood components to assure compliance with the manufacturers specifications.If anychanges are made to this project after the completion of our layout contact RK Miles immediately RCESOCEBU HEADER & BEAM LAYOUTROVITITHUHHLSLS ------- Beam & Ledger Material ------- Type Qty. Product Length ------ ---- ------- ------ B2 2 Spruce-Pine-Fir #2 2 x 10 10' 0" B4 2 v v 5' 0" Total length: 30' 0" G1 3 1-3/4x11-7/8 VERSA-LAM 2.0 310 24' 0" G3 2 v v 26' 0" Total length: 124' 0" ------- Post Material ------- Type Qty. Product Length ------ ---- ------- ------ P1 7 5-1/4x5-1/4 VERSA-LAM 2.0 3100 8' 1-1/8" Total length: 56' 7-7/8"All product names are trademarks of their respective owners568lbs2711lbs3625lbs19528lbs638lbsP1B22 plyB42 plyG13 plyG32 ply