18C-058 150 Prospect Ave--DuctTestResultsMID Construction Performance Testing Documentation
Date of Test
Builder/Homeowner
Address
Test completed by
Test Information
Conditioned Floor Area 2261.4 sq ft Number of Stories 2
Duct System 1 Duct System 2 (if installed)
Air Handler Installed?yes Air Handler Installed?0
Duct Flow in CFM25 135 Duct Flow in CFM25 0
Pass or Fail?PASS Pass or Fail?0
RESULTS of Rough-In Duct Leakage Test
10/10/11
Christian Marks
150 Prospect Ave
Matt Turcotte
RESULTS of Rough-In Duct Leakage Test
Rough In Total Leakage Test at 25 Pascals
Total Leakage Test 5.97 CFM per 100 sq ft of conditioned floor area
Notes on Area Tested and/or Testing Conditions:
2009 IECC Minimum Requirements
< 6 CFM per 100 sq ft of conditioned floor area
< 4 CFM per 100 sq ft of conditioned floor area
Questions about this Report?
Contact Megan McDonough - Phone: 413-586-7350 x221 - E-Mail: MeganM@cetonline.org
0
Rough In Test with Air Handler Installed
Rough In Test with NO Air Handler Installed