Loading...
18C-058 150 Prospect Ave--DuctTestResultsMID Construction Performance Testing Documentation Date of Test Builder/Homeowner Address Test completed by Test Information Conditioned Floor Area 2261.4 sq ft Number of Stories 2 Duct System 1 Duct System 2 (if installed) Air Handler Installed?yes Air Handler Installed?0 Duct Flow in CFM25 135 Duct Flow in CFM25 0 Pass or Fail?PASS Pass or Fail?0 RESULTS of Rough-In Duct Leakage Test 10/10/11 Christian Marks 150 Prospect Ave Matt Turcotte RESULTS of Rough-In Duct Leakage Test Rough In Total Leakage Test at 25 Pascals Total Leakage Test 5.97 CFM per 100 sq ft of conditioned floor area Notes on Area Tested and/or Testing Conditions: 2009 IECC Minimum Requirements < 6 CFM per 100 sq ft of conditioned floor area < 4 CFM per 100 sq ft of conditioned floor area Questions about this Report? Contact Megan McDonough - Phone: 413-586-7350 x221 - E-Mail: MeganM@cetonline.org 0 Rough In Test with Air Handler Installed Rough In Test with NO Air Handler Installed