37-064 140227 Phillips Initial Construction ControlVersion 10_09_2012 – Draft modified by AIA MA
Initial Construction Control Document
To be submitted with the building permit application by a
Registered Design Professional
for work per the 8th edition of the
Massachusetts State Building Code, 780 CMR, Section 107.6.2
Project Title: Phillips Enterprises Repairs Date:27 February 2014 Property Address: 149 Easthampton Road, Northampton, MA 01060
Project: Check (x) one or both as applicable: x New construction x Existing Construction
Project description: The project is focused on the repair of the exterior envelope of the CNC Building, including the roof and the interior finishes due to smoke, fire, and water damage. I Derek A. Noble MA Registration Number: 10699 Expiration date: 31 August 2014, am a registered design professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly supervised the
preparation of all design plans, computations and specifications concerning1:
Entire Project x Architectural Structural Mechanical
Fire Protection Electrical Other: for the above named project and that such plans, computations and specifications meet the applicable provisions of the
Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the
Professional Standard of Care, and be present on the construction site on a regular and periodic basis to:
1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. Such review shall not diminish or
relieve the Contractor of its submittal and other responsibilities.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code. The contractor shall be responsible for performing the work in accordance with the contract documents and shall be exclusively responsible for its construction means, methods, sequences
and procedures, and for construction safety. 4. The performance of the services shall not require any special testing or inspections unless specifically stated in the Code.
When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the building official a ‘Final Construction Control Document’.
Enter in the space to the right a “wet” or
electronic signature and seal:
Phone number: 860.627.1923 Email: derekn@steffian.com
Building Official Use Only Building Official Name: Permit No.: Date:
Note 1. Indicate with an ‘x’ project design plans, computations and specifications that you prepared or directly supervised. If ‘other’ is chosen, provide a description.