Loading...
23A-143 Bush 11-10-15New roof cricket New flashing to replace existing Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.comPerspectives & Title Sheet Renovation Booker & Janet Bush 09/15/15 09/29/15 10/03/15 10/15/15 10/28/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA T Drawing List Sheet Number Sheet Name T Perspectives & Title Sheet D1 Demolition Plans A1 First Floor Plan A2 Second Floor Plan A3 Basement Plan A4 Roof Plan A5 Exterior Elevations A6 Interior Elevations A7 Section, Details & Schedules E1 Electrical Plans A Perspective Rear A B Perspective Rear BCPerspective Front C remove doors andsave for re-use remove door remove door and save for re-use existing wall hvac vent existing ceiling hvac vent existing ceiling hvac vent existing ceiling hvac vent existing ceiling hvac vent existing ceiling hvac vent existing ceiling hvac vent (2) existing wall hvac vents, 1 high, 1 low existing ceiling hvac vent relocate switches existing electrical panel to remain demo chimney demo walls demo walls demo plumbing fixtures *resolve clean out issue at toilet 3/16" = 1'-0"1 First Floor Demo Plan Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.comAs indicated Demolition Plans Renovation Booker & Janet Bush 09/15/15 09/29/15 10/03/15 10/15/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA D1 3/16" = 1'-0"2 Second Floor Demo Plan 1/4" = 1'-0"3 Foundation Demo Plan UP Music Room Living Room Entry Hall 72" 15 lite full glass relocated door 32" Dining Room Sunroom Bedroom 1 Bedroom 2Bath 1 Mudroom Kitchen repair ceiling at water stain repair tile and grout (under allowance) in tub/shower repair ceiling at water stain repair ceiling at water stain repair ceiling at water stain 100 102 101 repair water damaged wall SSS remove existing storm door. replace with new storm door S S S SsupplyS R return LEGEND 103 repair ceiling at water stain re-glaze w/ tempered glass -seperate zone -seperate zone S-touch up paint as required repair damaged ceiling and wall 1. Living Room / Dining Room / Sunroom / Music Room 2. Kitchen 3. Bedroom 1 & 2 - New Thermostats. - Only paint ceilings of rooms that are being patched / repaired. Create 3 zones to existing HVAC. Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 1/4" = 1'-0" First Floor Plan Renovation Booker & Janet Bush 07/28/15 08/11/15 09/15/15 09/29/15 10/03/15 10/15/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA A1 1/4" = 1'-0"1 First Floor Plan replacement windows 23 3/4" x 45 1/4" replacement windows 20" x 45 1/4" Master Bedroom Main Bathroom Office Utility / Storage Play Room Storage replacement window 34" x 45 1/4" existing kneewall at 30 1/2" a.f.f. existing kneewall at 30 1/2" a.f.f. demo existing chimney, fill in floor flat ceiling(2) 36"x78" bi-pass doors new wall and doors -new wood flooring -new wood flooring -new wood florring -new flooring -new flooring -new wood flooring 40"x72" shower New Linen Closet 48" vanity 48" vanity (5) @ 18" deep 6' - 6 9/16"6' - 5 1/2"(2) 36"x78" bi-pass doors 15' - 6 1/2"11' - 4 7/16" 2 A7 Sim 2 A7 skylight location (5) @ 16" dp. Main Closet 2 -new hardwood flooring Main Closet 1 -new hardwood flooring A6 B A (5) @ 20" dp. EQ EQ EQ EQ 201 6' - 0" C shower head shower control 24" towel bar new soffit @ 7'-0" a.f.f. new wall and doors 204 200 203 remove doors leave door trim and add built-in 12" D shelves to opening A6D15.00°existing equipment C A B A C A6 F E A62 (3) @ 18" D.(3) @ 18" D.(3) @ 18" D.typical of 3 /2 A6 typical of 3 /2 A6 typical of 3 /2 A6 1' - 0" modify nosing at floor for proper clearance to handrail to eliminate pinching hazard 16"1 1/2"1' - 5"1 1/2"15"2' - 0 1/2" 1' - 10" 19 1/2"3 1/2" 3' - 0" same material as vanity countertop flat stud framed flat stud framed flat stud framed1' - 10"202 saloon doors carpet runner to remain robe hooks inside closet patch walls and paint Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 1/4" = 1'-0" Second Floor Plan Renovation Booker & Janet Bush 07/28/15 08/11/15 09/15/15 09/29/15 10/03/15 10/15/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA A2 1/4" = 1'-0"1 Second Floor Plan UP Crawlspace Hatchway Full Basement Crawlspace -Add insulation to basement rim joist area -replace existing light fixtures (5) 8'-0" fixtures and (2) 4'-0" fixtures existing condensor for 2nd floor 6 mil poly enlarge opening to spray foam walls 6 mil poly electrical panel gas meter dryerwasher add 3/4" plywood to window to allow for dryer vent sink to remain demo existing bathroom. install cleanout in existing toilet location. (see demo plan for this area) -Insulation @ rim joist area and crawlspace only Note: 1/4" = 1'-0"1 Basement Floor Plan Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 1/4" = 1'-0" Basement Plan Renovation Booker & Janet Bush 09/15/15 09/29/15 10/03/15 10/15/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA A3 7 1/2" / 12"7 1/2" / 12"7 1/2" / 12"7 1/2" / 12"7 1/2" / 12" 3" / 12"7 1/2" / 12"new roof cricket with rigid insulation -ASP snap lock metal roof (red or brown color) 1" tall ribs snow guards as needed. -install ice and water barrier -install new 5/8" CDX sheathing, fastened through insulation down to the 2x3" overframe, -install second layer of 2" poly-iso. -rough cut #2 pine or hemlock 2x3's on the flat, fasten down through existing sheathing into existing 2x8 roof rafters, using 4 1/2" timberlock screws, every 8" o.c. fill voids with 2" poly-iso between attached 2x3 members, cut to size. New roof fascia's 4" / 12" new skylight relocated range vent demo skylight new flashing to replace existing at fireplace *see structural drawings 1/4" = 1'-0"1 Roof Plan Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 1/4" = 1'-0" Roof Plan Renovation Booker & Janet Bush 09/15/15 09/29/15 10/03/15 10/15/15 10/28/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA A4 0' - 5"new roof cricket new flashing to replace existing at fireplace C 103 new gutters and downspouts C add curb to cooktop vent during re-roof D ABA 1/4" = 1'-0"1 Front Elevation 1/8" = 1'-0"2 Rear Elevation Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.comAs indicated Exterior Elevations Renovation Booker & Janet Bush 09/15/15 09/29/15 10/03/15 10/15/15 10/28/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA A5 1/8" = 1'-0"3 Side A Elevation 1/8" = 1'-0"4 Side B Elevation 1 1/2"15"1 1/2"15"1 1/2"3' - 0"corner bench, material to match vanity countertop wood shelves (2) shelf same material as backsplash 18" tile shower 18"x18"7' - 0"new soffit @ 7'-0" a.f.f.3' - 0"towel bar threshold, material to match vanity countertop *20"*30"verify*5' - 0"1' - 6"1' - 3"1' - 3"1' - 3"1' - 3"1' - 3 1/2"7' - 0"1' - 3"1' - 3"1' - 3"1' - 3"1' - 6"1' - 2 1/2"4' - 0"1' - 6"saloon doors1' - 3"1' - 3"1' - 3"1' - 3"0' - 6"add new painted birch plywood shelves with poplar edge. existing casing to remain at removal of doors. patch as needed at hinge removal.1' - 6"1' - 6"1' - 6"add 18" deep painted birch plywood shelves with poplar edge. Note: All cellulose to be removed prior to spray foaming.6' - 6"Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.com 3/8" = 1'-0" Interior Elevations Renovation Booker & Janet Bush 09/16/15 09/29/15 10/03/15 10/15/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA A6 3/8" = 1'-0"A Interior Elevation Main Bathroom A 3/8" = 1'-0"B Interior Elevation Main Bathroom B 3/8" = 1'-0"C Interior Elevation Main Bathroom C 3/8" = 1'-0"D Interior Elevation Hall Bookcase 3/8" = 1'-0"E Interior Elevation Shower 3/8" = 1'-0"F Interior Elevation Shower 3/8" = 1'-0"2 Interior Elevation Typical Closet existing wall construction Alum. drip edge existing top plate existing sub fascia existing trim to remain premium pine fascia stained to match existing 7.5 12 existing soffit to remain existing trim to remain premium pine crown trim similiar profile to existing stained to match existing trim existing floor joists closed cell foam insulation 2x4 blocking fastened to existing roof rafters 1/2" plywoodblocking 1/2" plywood blockingbetween roof rafters for cellulose insulation stop -ASP snap lock metal roof (red or brown color) 1" tall ribs snow guards as needed. -install ice and water barrier -install new 5/8" CDX sheathing, fastened through insulation down to the 2x3" overframe, -install second layer of 2" poly-iso. -rough cut #2 pine or hemlock 2x3's on the flat, fasten down through existing sheathing into existing 2x8 roof rafters, using 4 1/2" timberlock screws, every 8" o.c. fill voids with 2" poly-iso betweenattached 2x3 members, cut to size. -blown cellulose insulation at slopes -existing 2x8 roof rafters remove existing crown trim and sheathing as needed *see structural drawings 2x4 cleat attached to joist w/ 4" timberlockscrews MSTI26 strap. attach torafter w/SD10x 1 1/2" screws. wrap around cleat, attach to cleat w/ 10d x 1 1/2" nails. fill all available holes *see structural drawings 4" poly-iso on re-roof 5" water borne closed cell spray foam back blow w/ cellulose in slopes creates a R-52 to run Heat/AC supply & return ducts sheathing as backer sheathing as backer Back blow w/ cellulose in slopes. Rim joist to be sprayed/air sealed from interior. Back blow w/ cellulose in slopes. Rim joist to be sprayed/air sealed from interior. 4" poly-iso on re-roof /1 A7 existing wall construction Alum. drip edge existing top plate existing sub fascia existing trim to remain premium pine fascia stained to match existing existing soffit to remain existing trim to remain premium pine crown trim similiar profile to existing stained to match existing trim 2x4 blocking fastened to existing roof rafters remove existing crown trim and sheathing as needed 1' - 0" insulate end walls above ceiling -ASP snap lock metal roof (red or brown color) 1" tall ribs snow guards as needed. -install ice and water barrier -install new 5/8" CDX sheathing, fastened through insulation down to the 2x3" overframe, -install second layer of 2" poly-iso. -rough cut #2 pine or hemlock 2x3'son the flat, fasten down through existing sheathing into existing 2x8 roof rafters, using 4 1/2" timberlock screws, every 8" o.c. fill voids with 2" poly-iso betweenattached 2x3 members, cut to size. -blown cellulose insulation at slopes -existing 2x8 roof rafters and ceiling joists *see structural drawings Window Schedule Mark Count Width Height Manufacturer Glazing Finish Comments A 2 1' - 8" 3' - 9 1/4" T.B.D. Low E to match existing double hung window replacement (verify sizing) B 1 2' - 10" 3' - 9 1/4" T.B.D. Low E to match existing double hung window replacement (verify sizing) C 2 1' - 11" 3' - 9 1/4" T.B.D. Low E to match existing double hung window replacement (verify sizing) D 1 2' - 6 9/16" 4' - 6 15/16" VELUX existing existing new skylight on curb (in existing location) Door Schedule Mark Count Width Height Door Material Hardware Comments 100 1 6' - 0" 6' - 8" n/a n/a remove existing doors - trim to remain 101 1 2' - 8" 6' - 8" existing passage (re-use existing from removed door) relocated door 102 1 6' - 0" 6' - 8" existing existing re-glaze existing door with tempered glass 103 1 by owner by owner owner supplied storm door 200 1 6' - 0" 6' - 6" solid core passage pair-sliding bi-pass doors 201 1 6' - 0" 6' - 6" solid core passage pair-sliding bi-pass doors 202 1 solid core double acting spring hinges two18" wide x 48" high (verify) panel saloon style doors 203 1 5' - 0" 6' - 8" n/a n/a remove existing doors - trim to remain 204 1 2' - 0" 6' - 8" solid core passage hinged door Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.comAs indicated Section, Details & Schedules Renovation Booker & Janet Bush 09/29/15 10/03/15 10/15/15 10/28/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA A7 1" = 1'-0"1 Detail Fascia 1/4" = 1'-0"2 Section A 1" = 1'-0"3 Detail Rake install new light fixture in existing location install new light fixture in existing location install new light fixture in existing location Music Room Living Room Entry Hall Dining Room Sunroom Bedroom 1 Bath 1 install new light fixture in existing location install new light fixture in existing location new motion activated switch existing light existing light existing electrical panel new light fixture in new location new wall sconce at +/- 5'-0" a.f.f. new wall sconcegfcigfci waterproof fan/light S S S S S RR to switch below f/l shwr-f/l sd/co new smoke/co detector combo (eleminate exiting co detector on wall) MA MA Fan Fan Owner: Project Name: Drawing Name: Revisions: Date: Scale: Approvals: Sheet No.NEW HOMES+WORKPLACES+DESIGN+RENOVATIONS+ENERGY RETROFITS+CONSTRUCTION MANAGEMENT48 Bates Street, Northampton, MA 01060413.586.8287 / 413.586.9276 / www.wright-builders.comAs indicated Electrical Plans Renovation Booker & Janet Bush 09/29/15 10/03/15 10/15/15 11/10/15 Review Review Review Review Review Review Review 119 Pine Street Florence, MA E1 3/16" = 1'-0"1 First Floor Electrical Plan 1/4" = 1'-0"2 Second Floor Electrical Plan