Loading...
29 -394 99 Brookwood solar-2 Version #49.2 September 23, 2015 Project/Job # 0101421 RE: CERTIFICATION LETTER Project: Schubach Residence 99 Brookwood DrFlorance, MA 01062 To Whom It May Concern, Design Criteria: - Applicable Codes = MA Res. Code, 8th Edition, ASCE 7-05, and 2005 NDS - Risk Category = II - Wind Speed = 90 mph, Exposure Category C - Ground Snow Load = 40 psf - MP1: Roof DL = 9 psf, Roof LL/SL = 28 psf (Non-PV Areas), Roof LL/SL = 28 psf (PV Areas) Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.22424 < 0.4g and Seismic Design Category (SDC) = B < D A jobsite survey of the existing framing system was performed by a site survey team from SolarCity. Structural review was based on site observations and the design criteria listed below: I certify that the structural roof framing and the new attachments that directly support the gravity loading and wind uplift loading from PV modules have been reviewed and determined to meet or exceed structural strength requirements of the MA Res. Code, 8th Edition. Please contact me with any questions or concerns regarding this project. On the above referenced project, the components of the structural roof framing impacted by the installation of the PV assembly have been reviewed. After this review it has been determined that the existing structure is adequate to withstand the applicable roof dead load, PV assembly load, and live/snow loads indicated in the design criteria above. 09.23.2015 Version #49.2 Project Name:AHJ: Job Number:Building Code:Customer Name:Based On:Address:99 Brookwood Dr ASCE Code:City/State:Florance,MA Risk Category:Zip Code Upgrades Req'd?Latitude / Longitude:42.321257 -72.680233 Stamp Req'd? SC Office:PV Designer: Certification Letter 1 Project Information, Table Of Contents, & Vicinity Map 2 Structure Analysis (Loading Summary and Member Check)3 Hardware Design (PV System Assembly)4 Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.22424 < 0.4g and Seismic Design Category (SDC) = B < D Latitude: 42.321257, Longitude: -72.680233, Exposure Category: C 99 Brookwood Dr, Florance, MA 01062 1/2-MILE VICINITY MAP Schubach, Cynthia ASCE 7-05 0101421 Garren Lewis No01062 II Yes PV System Structural Design Software PROJECT INFORMATION & TABLE OF CONTENTS Springfield Northampton MA Res. Code, 8th Edition IRC 2009 / IBC 2009 Schubach Residence PV System Load PV Module Weight (psf)2.5 psf Hardware Assembly Weight (psf)0.5 psf PV System Weight (psf)3.0 psf Roof Dead Load Load Roof Category Description Existing Roofing Material ( 2 Layers )5.0 psf Re-Roof Underlayment 0.5 psf Plywood Sheathing 1.5 psf Board Sheathing Rafter Size and Spacing 2 x 4 @ 24 in. O.C.0.7 psf Vaulted Ceiling Miscellaneous 1.3 psf Total Roof Dead Load 9.0 psf Reduced Roof LL Non-PV Areas ASCE 7-05 Roof Live Load Lo Table 4-1 Member Tributary Area AtRoof Slope Tributary Area Reduction R1 Section 4.9 Sloped Roof Reduction R2 Section 4.9 Reduced Roof Live Load Lr Equation 4-2 Reduced Roof Live Load Lr 19.5 psf Code Ground Snow Load pg ASCE Table 7-1 Snow Load Reductions Allowed?From ENP Snow Guards to be Installed? Effective Roof Slope Horiz. Distance from Eve to Ridge W From ENP Snow Importance Factor Is Table 1.5-2 Eq: 7.3-170% ASCE Eq: 7.4-1 70% ASCE Eq: 7.4-1 70% Design Snow Load Over PV Modules ps-pv ps-pv = (Cs-pv) pf28.0 psf ASCE Design Sloped Roof Snow Load Over PV Modules Surface Condition of PV Modules Cs -pv Unobstructed Slippery Surfaces Figure 7-21.0 Design Roof Snow Load Over Surrounding Roof ps-roof ps-roof = (Cs-roof) pf28.0 psf Figure 7-21.0 Flat Roof Snow Load pf pf = 0.7 (Ce) (Ct) (I) pg; pf ≥ pf-min28.0 psf ASCE Design Sloped Roof Snow Load Over Surrounding Roof Surface Condition of Surrounding Roof Cs -roof All Other Surfaces 1.1 Minimum Flat Roof Snow Load (w/ Rain-on-Snow Surcharge)pf-min 28.0 psf 7.3.4 & 7.10 Snow Thermal Factor Ct Structures kept just above freezing Table 7-3 1.0 Snow Exposure Factor Ce Fully Exposed Table 7-20.9 Yes No 20° 13.0 ft Reduced Ground/Roof Live/Snow Loads 40.0 psf 5/12 1 0.975 Lr = Lo (R1) (R2) 19.5 psf (MP1) Miscellaneous Items 9 psf (MP1) Value 20.0 psf < 200 sf No Roofing Paper Yes None No LOAD ITEMIZATION - MP1 Material MP1 Comp Roof Component Solutions™TrussVersion: 5.18.50 [Build 11] Simpson Strong-Tie Truss: MP1 Project Name: JB-0101421-00 Date: 9/23/2015 11:38:51 AM Page: 1 of 1 Span Pitch Qty OHL OHR CANT L CANT R PLYS Spacing WGT/PLY22-0-0 5 /12 1 1-2-0 1-2-0 0-0-0 0-0-0 1 24 in 72 lbs NOTICE A copy of this design shall be furnished to the erection contractor. The design of this individual truss is based on design criteria and requirements supplied by the Truss Manufacturer and relies upon the accuracy and completeness of the information set forth by the Building Designer. A seal on this drawing indicates acceptance of professional engineering responsibility solely for the truss component design shown. See the cover page and the ”Important Information & General Notes” page for additional information. All connector plates shall be manufactured by Simpson Strong-Tie Company, Inc in accordance with ESR-2762 . All connector plates are 20 gauge, unless the specified plate size is followed by a “-18” which indicates an 18 gauge plate, or "S# 18", which indicates a high tension 18 gauge plate. Simpson Strong-Tie Company 24-4-0 1-2-0 1-2-05-6-0 5-6-0 5-6-0 11-0-0 5-6-0 16-6-0 5-6-0 22-0-0 0-0-0 7-6-10 7-6-10 6-10-13 14-5-6 7-6-10 22-0-0 0-0-05-4-104-11-10-4-15 12 5 12 8 13x6 - 21x4 \ 34x6 - 41x4 / 53x5 - 9 63x4 -73x4 - Loading Load (psf) Roof Snow (Ps) : 28 psfTCDL : 9(rake)BCLL : 0BCDL : 6 General Bldg Code : IBC 2012/ TPI 1-2007Rep Mbr Increase : YesD.O.L. : 125 % CSI Summary TC : 0.41 (2-3) BC : 0.58 (7-1)Web : 0.23 (3-7) Deflection L/ (loc) Allowed Vert TL: 0.17 in L / 999 (5-6) L / 180 Vert LL: 0.04 in L / 999 (5-6) L / 240Horz TL: 0.05 in 5Creep Factor, Kcr = 1.5 Plate Offsets (Jnt:X,Y,Ang): (1:3-14,2-3,0.) (2:0-0,3-13,44.) (3:0-0,3-13,0.) (4:0-0,3-13,44.) (5:3-14,2-3,0.) (6:0-0,3-8,0.) (7:0-0,3-8,0.) Reaction Summary JT Type Brg Combo Brg Width Material Rqd Brg Width Max React Max Grav Uplift Max MWFRS Uplift Max C&C Uplift Max Uplift Max Horiz 1 Pin (Wall) 1 3.5 in Steel 1.74 in 1,112 lbs - - - - 0 lbs 5 H Roll (Wall) 1 3.5 in Steel 1.68 in 1,069 lbs - - - - 0 lbs Material Summary Bracing Summary TC SPF #2 2x4 TC Bracing: Sheathed or Purlins at 3-8-0, Purlin design by Others. BC SPF #2 2x4 BC Bracing: Sheathed or Purlins at 10-0-0, Purlin design by Others.Webs SPF Stud 2x4 Loads Summary 1) This truss has been designed for the effects of a balanced design snow load (Ps = 28 psf) for hips/gables in accordance with ASCE7 - 10 except as noted, with the following user defined input: 28 psf ground snow load (Pg). NOTE: All flat/sloped roof factors have been ignored and the ground snow load has been used for the roof snow load (Ps = Pg), DOL = 1.15.2) This truss has not been designed for the effects of unbalanced snow loads.3) In addition to the snow loading specified on this drawing, this truss has also been designed for a roof live load (TCLL) of 0 psf. 4) Minimum storage attic loading in accordance with IBC Table 1607.1 has not been applied5) In accordance with IBC Table 1607.1, minimum BCLL's do not apply. Load Case Lr1: Std Live Load Distributed LoadsMember Location 1 Location 2 Direction Spread Start Load End Load Trib Width Top Chd 11-0-0 23-2-0 Down Proj 19.5 psf 19.5 psf 24 in Load Case D1: Std Dead Load Distributed Loads Member Location 1 Location 2 Direction Spread Start Load End Load Trib WidthTop Chd -1-2-0 11-0-0 Down Rake 3 psf 3 psf 24 in Member Forces Summary Table indicates: Member ID, max CSI, max axial force, (max compr. force if different from max axial force) TC 8-1 0.134 37 lbs 1-2 0.392 -2,070 lbs 2-3 0.407 -1,753 lbs 3-4 0.406 -1,720 lbs 4-5 0.357 -2,010 lbs 5-9 0.124 34 lbs BC 5-6 0.560 1,799 lbs 6-7 0.392 1,220 lbs 7-1 0.577 1,850 lbs Webs 2-7 0.131 -454 lbs 3-7 0.228 531 lbs 3-6 0.212 493 lbs 4-6 0.119 -413 lbs Notes: 1) When this truss has been chosen for quality assurance inspection, the Plate Placement Method per TPI 1-2002/A3.2 shall be used. Cq = 1.17. Roofing Material PV System Type Spanning Vents Standoff (Attachment Hardware) Roof Slope Rafter Spacing Framing Type / Direction Purlin Spacing X-X Purlins Only Tile Reveal Tile Roofs Only Tile Attachment System Tile Roofs Only Standing Seam/Trap Spacing SM Seam Only Wind Design Code Wind Design Method Basic Wind Speed V Fig. 6-1 Exposure Category Section 6.5.6.3 Roof Style Fig. 6-11B/C/D-14A/B Mean Roof Height h Section 6.2 Wind Pressure Exposure Kz Table 6-3 Topographic Factor Kzt Section 6.5.7 Wind Directionality Factor Kd Table 6-4 Importance Factor I Table 6-1 Ext. Pressure Coefficient (Up)GCp (Up)Fig. 6-11B/C/D-14A/B Ext. Pressure Coefficient (Down)GCp (Down)Fig. 6-11B/C/D-14A/B Design Wind Pressure p Equation 6-22 Wind Pressure Up p(up)Wind Pressure Down p(down) Y-Direction Max Allowable Standoff Spacing Landscape 39''Max Allowable Cantilever Landscape NA Standoff Configuration Landscape Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR Y-Direction Max Allowable Standoff Spacing Portrait 65'' Max Allowable Cantilever Portrait NA Standoff Configuration Portrait Max Standoff Tributary Area Trib PV Assembly Dead Load W-PV Net Wind Uplift at Standoff T-actual Uplift Capacity of Standoff T-allow Standoff Demand/Capacity DCR 22 sf3.0 psf -247 lbs500 lbs 49.4% 500 lbs 44.6% X-Direction 48''17''Staggered Staggered 20 sf3.0 psf-223 lbs 10.0 psf ALLOWABLE STANDOFF SPACINGS X-Direction 72'' 0.45 p = qh (GCp) -13.1 psf 24'' qh qh = 0.00256 (Kz) (Kzt) (Kd) (V^2) (I)Equation 6-1515.0 psf Wind Pressure -0.88 Wind Pressure Calculation Coefficients 0.85 1.00 0.85 1.0 Velocity Pressure 15 ft Wind Design Criteria ASCE 7-05 Partially/Fully Enclosed Method 90 mph NA C Gable Roof NA NA Y-Y Rafters NA No Comp Mount Type C 20° 24'' O.C. CALCULATION OF DESIGN WIND LOADS - MP1 Mounting Plane Information Comp Roof SolarCity SleekMount™