CONSTRUCTION CONTROL DOCUMENT
(For professional Engineers/Architects responsible for Entire Project)
Project Title:______________________________________________ Date:__________________________ Project Location:___________________________________________ Map:_____ Parcel:_____ Zone:_____
Scope of Project:__________________________________________________________________________
In accordance with the Eighth edition Massachusetts State Building Code, 780 CMR Section 107.6:
I, _______________________________________________________ Mass. Registration # ______________,
Being a registered professional Engineer/Architect hereby CERTIFIES that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning:
[ ] ENTIRE PROJECT
For the above named project and that to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices
and all applicable Laws for the proposed project.
Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with the documents approved for the building
permit and shall be responsible for the following as specified in Section 10.7.6.2.2: 1. Review of shop drawings, samples and other submittals of the contractor as required by the construction documents as submitted for the building permit, and approval for the conformance
to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed
In a matter consistent with the construction documents.
I shall submit periodically, in a form acceptable to the building official, a progress report together with pertinent comments. Upon completion of the work, I shall submit to the building official a final report as to the satisfactory
completion and readiness of the project for occupancy.
Signature and Seal of Registered Professional
_____________________________________
_____Day of _______________20____
(seal)