Loading...
32A-178 82 Bridge Pliumb-Gas feesPlumbing Renovation New construction Totals 31 Units 10 21 Per unit 65 50 Base Cost $650 $1,050 $1,050 Fixtures/Unit 5 5 Per Unit: 2 Total fixtures 50 105 Fixture cost $500 $1,050 $1,150 $2,100 $3,250 Non-residential Base $100 $100 Non-residential fixtures 6 at $10 $60 $60 Total Plumbing $3,410 Gas Water heaters (2)$120 $120 82 Bridge St Sargent House