31A-286 Zucker PLANS S-001 - annotatedUP
ENTRANCE HALL
FRONT
PORCH
FAMILY ROOM
KITCHEN
MUD ROOMLIVING ROOM
POWDER
ROOM
WC
CONSTRUCTION KEY
EXISTING TO REMAIN
EXISTING TO BE REMOVED
NEW CONSTRUCTION
UP 3 R
UP
BROOM
UP
BEDROOM 3
BATH
BEDROOM 1 BEDROOM 2
MASTER
BATH
STAIRHALL
SPARE ROOM
WALK-IN CLOSET
WALK-IN CLOSET
6'-0"
75
71
28 STAIRHALL
LAUNDRY
GUEST BEDROOM
STUDY
GUEST
BATH
GUEST
BATH
UP
JOB NO.
DATE
SCALE
DRAWINGTITLE
REVISIONS
PROJ.2013-34
02-19-14
1/4"=1'-0"CALL
NORTHPROJECT
M U N K I T T R I C K
A S S O C I A T E S
A R C H I T E C T U R E
I N T E R I O R D E S I G N
S P A C E P L A N N I N G
P . O . B O X 1 6 7
C O B A L T , C T 0 6 4 1 4
m u n k i t t r i c k a s s o c i a t e s @ g m a i l . c o m
ZUCKER-ABEL HOUSE
RENOVATION
47 DRYADS GREEN
NORTHAMPTON, MASSACHUSETTS
5'-6"5'-5"
4'-11"5'-5"
6'-9"
6'-11"13'-5"14'-0"8'-1"EXISTING 8" W. X 9 1/2" TALL
WOOD GIRDER SUPPORTS JOISTS
EXISTING 8" W. X 9 1/2" TALL
WOOD GIRDER SUPPORTS JOISTS
EXISTING 15" X 15"
CMU PIER SUPPORTS
EXISTING 12" X 12" BRICK
PIER SUPPORTS (TYP.. FOR 6)
EXISTING FULL FOUNDATION
EXISTING BRICK CHIMNEY
BASE (TO REMAIN)
EXISTING BRICK CHIMNEY
BASE (TO REMAIN)FULL 2 X 8 FLOOR JOISTS AT 16" O.C. (EXISTING)FULL 2 X 8 FLOOR JOISTS AT 16" O.C. (EXISTING)FULL 2 X 8 FLOOR JOISTS
AT 16" O.C. (EXISTING)EXISTING DOUBLE JOIST
HEADER TO REMAIN
NEW BASEMENT STAIRS FROM
NEW LANDING TO BASEMENT
FLOOR.
CHIMNEY TO BE
REMOVED DOWN
TO BASEMENT
EXISTING 6'-0" WIDE OPENING
WITH POCKETING DOORS
EXISTING 5'-4" WIDE
CASED OPENING
CLOSET TO
BE REMOVED
THIRD FLOOR PLAN
FIRST FLOOR PLAN
SECOND FLOOR PLAN
BASEMENT PLAN
5'-4" FIN. OPENING
5'-4" FIN. OPENING
HEADER BEAM "A"
HEADER BEAM "B"
HEADER BEAM "C" AT NEW 5'4" OPENING
IN ASSUMED BEARING WALL
HEADER BEAM "D" AT NEW 4'-0" WIDE
OPENING IN ASSUMED BEARING WALL
STRUCTURAL
PLANS
S-001
5'-10 1/2"
SPAN OF HEADER BEAM AT
NEW OPENING AT FIRST FLOOR
WALL DIRECTLY ABOVE
LOC. OF 4 X 4
POST SUPPORT
ABOVE
LOC. OF 4 X 4
POST SUPPORT
ABOVE
LOC. OF 4 X 4
POST SUPPORT
ABOVE
LOC. OF 4 X 4
POST SUPPORT
ABOVE
5'-10 1/2"
SPAN OF HEADER BEAM AT
NEW OPENING AT FIRST FLOOR
WALL DIRECTLY ABOVE
NEW DOUBLE
2 X 8 HEADER+/- 4'-6"+/- 7'-1"
NEW FLOOR OPENING FOR
NEW FRAMED LANDING AT
+/- 22" BELOW TOP OF JOISTS
NEW FRAMED LANDING (2 X 8 @ 16" O.C.)
BELOW. SUPPORT ON NEW STUD WALLS.
NEW STUD WALL
BELOW (2 X 4 @
16" O.C.)
NEW STUD WALL
BELOW (2 X 4 @
16" O.C.)
CUT/RESUPPORT
EXISTING JOISTS
2-2x10
Provide double
jack stud and
single king
stud each end,
typical this
floor.
2-2x8
2 - 1 3/4" x 9 1/4" LVL
2 - 1 3/4" x 9 1/4" LVL
Provide 4x4
support post
each end of
LVL header
typical.
2 - 2x8
Simpson
LUS28-2
hanger