Loading...
31A-143 CS Beam Calc girdersCS Structure™ 2.06.13[Build 1] kmBeamEngine 4.6.1.0 Materials Database 1492 TurkTed37ForbesAve - Level 8 7-21-14 10:21am 1 of 2 All product names are trademarks of their respective owners Copyright (C) 2013 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. Doug Hodgins rk Miles Inc. 21 West St. West Hatfield Ma. Job Information Job Name: 37 Forbes Av Customer Address: Site Address: Ted Tirk/37 Forbes 37 Forbes Ave Member Data Description: CalcG1 Member Type: Girder Application: Floor Comments:Top Lateral Bracing: Continuous Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 10.7 PLF Filename: Q:\TurkTed37 Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 12' 5.88" -53 -13 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.88" 27 7 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.88" 27 7 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.88" 40 13 Live Point (LBS) Top 1' 1.75" 3880 1291 Live Point (LBS) Top 12' 3.25" 184 275 Live 1 2 12 5 14 12 5 14 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall N/A N/A 1.500" 5562# -336# 2 12' 5.875" Wall N/A N/A 1.500" 1646# -- Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Dead 1 4144# 1418# 2 1045# 600# Design spans 12' 0.625" Product: 1-3/4x7-1/4 VERSA-LAM 2.0 3100 SP 3 ply PASSES DESIGN CHECKS NOTE: Pass-thru framing is required at point loads over bearings. Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Review gravity uplift reaction force of 336lbs at bearing 1 and ensure that the structure can resist appropriately. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 5377.'# 13068.'# 41% 3.23' Total Load D+L Negative Moment 1014.'# 13068.'# 7% 6.24' Total Load D+L Shear 5483.# 7232.# 75% 0.23' Total Load D+L TL Deflection 0.4128" 0.6026" L/350 5.64' Total Load D+L LL Deflection 0.3029" 0.4017" L/477 5.64' Total Load L Control: Shear DOLs: Live=100% Snow=115% Roof=125% Wind=160% Design assumes a repetitive member use increase in bending stress: 4 % Manufacturer's installation guide MUST be consulted for multi-ply connection details and alternatives Point loads over bearings are NOT included in the Design calculations, but ARE included in the Reaction table CS Structure™ 2.06.13[Build 1] kmBeamEngine 4.6.1.0 Materials Database 1492 TurkTed37ForbesAve - Level 8 7-21-14 10:21am 2 of 2 All product names are trademarks of their respective owners Copyright (C) 2013 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. Doug Hodgins rk Miles Inc. 21 West St. West Hatfield Ma. Job Information Job Name: 37 Forbes Av Customer Address: Site Address: Ted Tirk/37 Forbes 37 Forbes Ave Member Data Description: CalcG2 Member Type: Girder Application: Floor Comments:Top Lateral Bracing: Continuous Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 10.7 PLF Filename: Q:\TurkTed37 Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 12' 5.88" -53 -13 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.88" 27 7 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.88" 27 7 Live Replacement Uniform (PLF) Top 0' 0.00" 12' 5.88" 40 13 Live Point (LBS) Top 1' 1.75" 4331 1570 Live Point (LBS) Top 12' 3.25" 184 275 Live 1 2 12 5 14 12 5 14 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall N/A N/A 1.583" 6235# -336# 2 12' 5.875" Wall N/A N/A 1.500" 1702# -- Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Dead 1 4560# 1675# 2 1080# 622# Design spans 12' 0.625" Product: 1-3/4x7-1/4 VERSA-LAM 2.0 3100 SP 3 ply PASSES DESIGN CHECKS NOTE: Pass-thru framing is required at point loads over bearings. Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Review gravity uplift reaction force of 336lbs at bearing 1 and ensure that the structure can resist appropriately. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 5896.'# 13068.'# 45% 2.63' Total Load D+L Negative Moment 1014.'# 13068.'# 7% 6.24' Total Load D+L Shear 6156.# 7232.# 85% 0.23' Total Load D+L TL Deflection 0.4450" 0.6026" L/324 5.64' Total Load D+L LL Deflection 0.3229" 0.4017" L/447 5.64' Total Load L Control: Shear DOLs: Live=100% Snow=115% Roof=125% Wind=160% Design assumes a repetitive member use increase in bending stress: 4 % Manufacturer's installation guide MUST be consulted for multi-ply connection details and alternatives Point loads over bearings are NOT included in the Design calculations, but ARE included in the Reaction table