Loading...
22B-109 (22) Ca : D Final Construction Control Docum To be submitted at completion of constructionRegistered Design ProfessioCTIONSfor work per the ninth edition of the 6 Massachusetts State Building Code, 780 CMR Section 107 Project Title:Pioneer Valley Books:Roof Reinforcement Date:2/5/19 Permit No.BP- 2019-0352 Property Address: 199 Pine Street,Northampton,MA Project: Check(x)one or both as applicable: New construction X Existing Construction Project description:Structural reinforcement of existing steel roof beams and the installation of new cee purlins bolted to existing cee purlins of the existing 25dx 336'warehouse to provide adequate support for the code required snow loads,additional roof insulation,roofing membrane,and the installation of a large array of PV solar panels.All structural work has been completed in accordance with the approved plans. L David Vreeland, MA Registration Number: 46317, Expiration date: 6/30/2020, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical X Other:Describe-Construction control for the above named project. 1,or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or of electronic signature and seal: �r DAVID A. 1G VREELAND CIVIL No.46317 ,C "1•jA,9`°r3,STEP Phone number:413.6240126 Email:dvreeland@verizon.net Fssl C Building Official Use Only Building Official Name: Permit No: Date: Version 01 01 2018 199 PINE ST BP-2019-0352 GIS a: COMMONWEALTH OF MASSACHUSETTS Map-.Block: 22B- 109 CITY OF NORTHAMPTON Lot.-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Cateaom REPAIR - BUILDING PERMIT permit BP-2019-0352 Project 9 JS-2019-000578 Est.Cost:$455017.00 Fee:$3192.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: RENAISSANCE BUILDERS 013302 Lot Size(sp.ft.): 203425.20 Owner: MATT&NICK LLC Zvuine 5u92uWPr731niTRA(19VUR(2)/ Applicant: RENAISSANCE BUILDERS AT. 199 PINE ST Applicant Address: Phone., Insurance: P O Box 272 (413) 863-8316 Workers Compensation TURNERS FALLSMA01376 ISSLrED ON.•9/24/2018 0:00:00 TO PERFORM THE FOLLOWING WORK INSTALL STEEL PLATES TO UNDERSIDE OF EXISTING MAIN BEAMS, INSTALL NEW CEE CHANNEL GIRTS IN BETWEEN EXISTING GIRTS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House4 Foundation: Driveway Final: Final: Final: Rough Mrame: Gas: Fire Department Fireplace/Chimney: Rough: ODM Insulation: /I Final: Smoke: Final: 01( `(,,/ THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGUL/ATI�ONS� �/ Certificate of Go O..//"1 Si nature:. 61"" t r" FeeTvoe: Date Paid: Amount: Builaing 92420180:00:00 $3192.00 212 Main Street,Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner