Loading...
35-229 16 Bayberry Lane PLANS-11 2 3 distribution box 5.7'5.7' 100'99'98'97'96'95'94'93'92'91'90' Hampshire Registry of Deeds Plan Book 129, Page 59 Lot 10 1.040 acres buried elec. line wate r ser v i c e line Ba y b e r r y La n e existing 1500 gal. septic tank - pump -check for cracks -install effluent filter at site of new outlet tee 50' 105' DH 2 N N29° 26' 17" W 251.46 ' N63 ° 40 ' 13 " W 60 . 0 0 ' N48° 09' 21" W 371. 7 8 ' 3 Bedroom Remove Existing Garbage grinder Note: new septic tank effluent line to be installed at least 6" below buried electric cable # 16 TBM #1 nail in pine @ 100.00' (assumed datum) fen c e failed leach chamber (location approx.) pump & crush or backfill with sand W1 W2 W3 W4 sil t fe n c e 100'silt septic soil absorption system vegetated wetland Graphic Scale 1" = 20' 0 20 40 Plan symbols iron pipe found wetland flag silt fence & limit of work concrete bound found Environmental Planning Associates P.O. Box 351 South Deerfield, MA 01373-0351 (413) 665-7903 (866) 318-2770 (fax) Page 1 of 2 Plan View 1 Dated: 2/14/19 Scale: 1" = 20' Drawn By: PRL Wetland Permit Plan Harold Jordan and Renee Rossi 16 Bayberry Lane Assessors Parcel 35 -229-001 Northampton, MA © 2019, All Rights Reserved Environmental Planning Associates Silt Fence Detail 1. Set posts and excavate a 6" x 6" trench, set post downslope. Angle 10° upslope for stability & self-cleaning 100° Posts 12" Min. depth 2. Attach filter fabric to posts, extend it to the trench.Filter Fabric 3. Backfill the trench and compact the excavated soil. Compacted backfill ELEVATION Points 'A' should be higher than point 'B' B A A PLAN VIEW Bottom of Drainageway FL O W 96 ' 97 ' 98 ' 99 ' limit of work