308 Plan Review 2016 308 a6'3 �e/t �e/d &d 7
PLAN REVIEW- SYSTEM COMPONENTS
City/Town lit
' 4 ) Application No. /
n
Lot Numb *
Address PI//SCO C!J i O/() J
OWNE �a R ".c-C � Al./ ! / k
NAME ti, c
AADDRE SS 311 CZ2 SK T / ��(�OC
WNER
TELEPHONE# ( ) 3—e9 -//57.
DESIGN /14
/
ENGINEER SANITARIAN / / ,-n %(4r'/,vNis
FACILITY DESIGNED FOR V ,/� �l,/.
A. Single or Multifamily dwelling /" e� �'4S' " e — kJ
# Bedrooms Garbage Disposal yes
no
Total Design Flow 3 30 gallons per day
B. Other (describe)
Design Basis
Total Design Flow 3 32 gpd DK
iI
COMMENTS or PROBLEMS: /:1'
FILE COPY
Pager I of 16
BUILDING SEWER
ITEMS TO NOTE:
/ 411.
v/ Pipe diameter I/ �/J�
Schedule of pipe 7 " ?Y G `Z l%
watertight joints
V/ Slope (min for 4" pipe is 0.01 or 1/8" per foot; desired slope is 0.02
or '''A" per foot)
7 Invert elevation at building / O pp
. 57)
Length
a
Alignment and grade
(manholes required at changes in both alignment and grade.)
Manhole(Must have metal frame and cover at grade)
Pager 2 of 16
SEPTIC TANK
/
Tank size at least 200 % of design flow
/ (minimum tank size is 1,500 gal)
algr �/
/ • from inlet to outlet u K
v Minimum 4' liquid depth
/ Tees extend 6"above flow line
J/ Inlet tee 10" below flow line (minimum)
VL Air space(3"above tees, 9" above flow line)
Depth of outlet tee (minimum 14")
'l/ Access manhole over center of tank and each tee
l ."....- Number of compartments =
(
____77..C, Gas baffle on new construction
Septic tank detail provided
Buoyancy calculation (if necessary)
C--------
On
On 6" crushed stone
Pager 3 of 16
DISTRIBUTION BOX
ITEMS TO NOTE:
.-. Inlet elevations
Outlet elevations
Drop (inlet- outlet)
Sump (6" minimum) Baffle or inlet tee
All outlets at same elevation ventilation
Manhole cover to grade # of outlets
size of outlets (diameter) ! "
Distribution laterals: No, Size
Detail Provided
Pngcr4 of 16
LEACH FIELD
Items to note:
_ Dimension of field(s): Leng Width
_ Number of fields Fi d separation (10 ft. min)
Total area provided for disposal (sq. ft.)
(1 x w x no. of fields)
_ Gallons of treatment provided:
Bottom area x loading factor(from 15.242) = gal.
(must be equal or greater than design flow)
Note: Leaching area must be increased if garbage grinder is used.
Elevation of bottom of the field
(must be 4 ft/or 5 ft above max. high groundwater depending on perc rate.)
Number of distribution pipes
Type
Length (100'max.)
Slope (min. 0.005)
Spacing(6' max.)
Depth of stone beneath pipe
(min 6")
Plan states stone is double washed
_ 2"cover of 1/8"to 'A"stone over pipe crown
_ Ends capped
Aggregate depth 6" minimum and 12"maximum
Depth of cover material above stone(min.9")
_ Construction of leaching facility in fill? Yes No
_ Fill is specified as TitleV on plan
Certification on fill submitted
Fill is specified for 5' around entire system
_ Separation between lines (6 ft maximum)
Separation between lines and edge of bed -four feet maximum.
Pager 5 of 16
LEACHING TRENCHES
_ Number of trenches length_ (max.100')width_(min.24)
Depth of stone beneath pipe (6" min )
Leaching area available
bottom=length x width x no. trenc s=
sides =length x depth (2'max)x w x if trenches sq ft.
TOTAL = sq ft.
note: the effective depth shall be equal t the depth of the trenches below
the invert of the distribution pipe u' to maximum of 2 ft.
Leaching are requirements:
Total leaching area (bottom plus sides)x load' g factor=gallons treated
Loading factor is based on perc rate(see 15.242
Total gallons treated by system design must be> esign flow fo system
LEACHING AREA REQUIREMENTS SATISFI i? es ,No
(note: leaching area must be increased if garbage s inder is used)
Ground water elevation: 4 feet or 5 feet separation
between trench bottom and max. high groundwater.
Trench spacing 3 x effective width or depth whichever is greater
_ Trench width 4 ft maximum
Pipe slope (min. 0.005 slope,or 6"per 100 feet)
_ BackfID depth (min. of 9")
_ Ends capped
Distribution lines exceeding 50 ft are vented.
Diameter of distribution pipe (min.3")
_ Distribution line orifice(min.3/8, max %")
The area between trenches shall be designated as reserve area only where
the separation distance between the excavation sidewalls is at least six feet.
FBI is specified as Title V on plan
Certification on Fill submitted
Fill is specified for 5"around entire system
Pager 6 of 16
PLAN REVIEW CHECKLIST
GENERAL INFORMATION
CHECK TO VERIFY THAT THE PLAN INCLUDES THE FOLLOWING REQUIRED
INFORMATION:
"MASS. REG. SANITARIAN, or_MASS. P.E. stamp and signature
"Scale of 1"=40' for plot plan
Scale of 1"=20' for system component details
boundaries of the facility being served including easements
which could affect the impact the system installation/performance.
' All dwellings, buildings existing and proposed impervious areas
4----Location of all existing and proposed impervious areas
C---Location and dimensions of the system including reserve area
Design calculations: Sewage flow gpd
Septic tank size required gpd
"provided gpd
North arrow,existing and proposed contours
Location and log of deep hole observation test
da test
existing grade elevations for each test
Pager 7 of I6
PLAN REVIEW CHECKLIST (cont.)
Name of approving authority representative
Name & approval no. of soil evaluator
e..-------
Location and results of pert test
Cplate of pert test
!/ Location of water lines and other subsurface utilities on facility
eJ/Observed groundwater elevation in vicinity of the system
_ complete profile of the system
_JA note on the plan listing all variances to the provisions of
/310 CMR 15.00 and local requirements sought in conjunction with the plan
_ Location and elevation of benchmark within 50 to 75 feet of the facility
which is not subject to dislocation or loss during conjunction of the facility
f dosing system
complete design and specifications of the system
dosing chamber capacity; required , provided
_ number of dosing cycles,
depth of cycles
Pager 8 of 16
PLAN REVIEW CHECKLIST (CON'T)
Recirculating Sand Filters
Complete plans and specifications
hydraulic profile
location of the treatment works and nearest existing street
__ street and lot number
Pager 9 of 16
DOSING TANK
Dimensions L x W x D = Vol.
Number/size of siphons
Number and size of pumps (No._, Capacity_gpm
Discharge size
Manholes to grade
Groundwater elevation (min. 1 ft below inlet)
Pump controls
Alarm (on separate power circuit)
Buoyancy calculations(if needed)
Pump system calculations
Pager 10 of 16
LEACHING CHAMBERS/PITS
ITEMS TO NOTE
Manufacturer a /1fe S11--
Installation
Bed Formation
Number of beds of trenches Length edixe�� � �
Width ?�
Depth
Leaching area available: y 717. y
bottom: (length x width x no. of pits)= 50 sC �P( ��/��
sides: (2 x (length x depth (2'max.)+(2 x (width x depth (2'max) x 4 of pits.
Total leaching area available= ,
LEACHING AREA REQUIREMENTS:
Total leaching area (bottom +sides) x loading factor from 15.242
330
gals. This must be greater than or equal to the design
flow for the system. Increase leaching area if garbage grinder is used.
Distribution Trenches:every 20 feet
Beds: area for pipe not to exceed
60 x 60 feet
_It's Spacing Trenches: 2 x effective depth or width
Beds: 4 feet between excavation sidewalk.
Manholes (min -one 20"access per unit; a 24"diam for>2,000 gal units)
VStone around chamber (12" to 48" of% " to 1 '4"stone)
1"1'cover of 1/8" to 'A" stone
4' separation between max. high GW and trench bottom? Yes ✓ No
Pager I I of 16
PLAN REVIEW- SYSTEM SITING
Performed By. Approval N
Witnessed By. Date
Location Address or Owner's Name,
Lot Number: Address and
Telephone No.
Office Review
Published Soil Survey: NO_ YES_
Year Published Publication Scale Soil Map Unit
Drainage Class Soil Limitations
Surflcial Geologic Report Available: No Yes_
Year Published Publication Scale
Geologic Material(Map Unit)
Landform
Flood Insurance Rate Map:
Above 500 year flood boundary No Yes
Within 500 year boundary No Yes_
Within 100 year flood boundary No Yes
Pager 12 of 16
Welland Area:
National Wetland Inventory Map(map unit)
Wetlands Conservancy Program Map(map unit)
Current Water Resource Conditions (USGS): Month
Range: Above Normal_ Normal Below Normal
Other References Reviewed:
Minimum setback distances (where applicable)shall be shown on the plan for the proposed
disposal facility (septic tank and soil absorption system.)
Soil Absorption
Septic Tank System (SAS)
Property line 10 10
Cellar walVinground
swimming pool 10 20
Slab Foundation 10 25
Water supply
pressure line 10 10
Surface waters
(except wetlands) 25 50
Pager I3 of I6
Septic Tank SAS
Bordering vegetated
wetlands, salt marshes,
inland and coastal banks 25 50
SURFACE WATER SUPPLY
_Reservoirs and impoundments 400 400
_Tributaries to SWS 200 200
_Wetlands bordering SWS or
tributaries thereto 100 100
Certified Vernal Pools 100 - 100
__Private water supply well
or suction line 50 100
PUBLIC WATER SUPPLY WELL
Gravel packed 400 400
Tubular 250 250
Irrigation well 10 25
Open, subsurface, or
surface drains which
discharge to SWS or
tributaries thereto 50 100
Pager 14 of 16
Soil Absorption
Septic Tank System
__Other open, surface or
subsurface drains (ex-
cluding foundation drains)
which intercept seasonal high
groundwater 25
50
_Other open, surface of
subsurface drains (ex-
cluding foundation drains 5
10
_Leaching and catch
basins & drywells 10
25
_Downhill slope N/A
15' (min) to
top of
3:1 slope
Inspection Port(s)
._Magnetic Tape
Correct#of deep hole per code revision
Note: slope stabilization shall be provided (including
retaining walls) when an adjacent downhill slope
to a disposal facility is greater than 3:1.
Pager IS of 16
EFFLUENT LOADING RATES
(gpd/sq. ft./day)
PERC.RATE SOIL CLASS
(min./in.) CLASS I CLASS H CLASS III CLASS IV
<5 0.74 0.60 - -
6 0.70 .0.60 -
-
7 0.68 0.60 - -
8 0.66 0.60 - -
10 - 0.60 - -
15 0.56 0.37 -
20 0.53 0.34 - -
25 - 0.40 0.33
30 - 0.33 0.29 -
Loading criteria listed below apply only to the upgrade of existing systems pursuant
to 310 CMR 15.405 (1) (c) or systems constructed pursuant to 310 CMR 15.417
40 -
-
-
60 -
0.25
0.15
Pager 16 of 16