573 Certificate of Compliance 2013 Commonwealth of Massachusetts
f '--r- f City/Town of Northampton
_;Ff_ Certificate of Compliance
Form 3
DEP has provided this form for use by local Boards of Health. Other forms may be used, but the
information must be substantially the same as that provided here. Before using this form, check with
the local Board of Health to determine the form they use.
This is to Certify that the following work on an On-Site Sewage Disposal System
Important:When FILE COPY
po act ® Construction of a new system
on the computer. El Repair or replacement of an existing system
use only the tab ❑ Repair or replacement of an existing system component
key to move your
cursor-do not
use the return Has been done in accordance with Title 5 and the Disposal System Construction Permit(DSCP):
key.
2016
DSCP Number DSCP 5/15/13
DSCP DSCP Date
Scott Keiter
Facility Owner
O 573 Sylvester Road (Lot 4)
Street Address or Lot#
Northampton
City/Town State Zip Code
Designer Information:
Greg Newman Newman Environmental Engineering
Name Name of Company
—Cti 74/ la
Signature Date
Installer Information:
Todd Alexander Westhampton, MA
Name Name of Company
-6,4i 741/4
Signature Date
Use of this system is conditioned on compliance with the provisions set forth below:
tuL
The issuance of this certificate shall not be construed as a guarantee that the system will function as
designed.
Northam•ton Health De•artment
Approving Authority
I� 11/3/2017
Signature - Date
t5fonn3.dac•06/03 Certificate of Compliance•Page 1 of 1
NEWMAN ENVIRONMENTAL ENGINEERING
October 29, 2017
Scott Keiter FILE COP Y
do Keiter Builders Inc.
35 Main Street
Florence,MA 01062
Engineer's Certificate of Compliance
THIS IS TO CERTIFY, That the On-Site Sewage disposal System installed®or repaired/ replaced❑
on Mar-2016 —Mar-2017,final inspection Oct-2017 by Todd Alexander,Westhampton,MA
for Scott Keiter at Lot on Sylvester Road,Northampton,MA
has been constructed in accordance with the provisions of TITLE 5 of the State Environmental Code as
described in the plan entitled:
SEWAGE DISPOSAL SYSTEM
AT
LOT ON SYLVESTER ROAD,NORTHAMPTON,MA
Dated 5/15/13
Prepared by:Newman Environmental Engineering
Drawing No.Z1305-1
With the following exceptions noted:
1. Minor changes to the location of the new septic system facilities as noted on the enclosed "AS-
BUILT"site plan.
2. Final grading(loam & seeding) around house site not complete at time of final inspection.
3. D-box/leach field inspected October 15,2017 did not find sign of high flow to leach field.
Vegetative cover over leach field requires maintenance to establish consistent grass cover to
prevent growth of deep rooted plants (that will plug leach field). Recommend re-seeding and
maintaining leach field area by monthly mowing(as a minimum)during growing season.
4. System not in use as of October 15,2017(house still under construction). Owner shall prevent
paints,drywall dust, plaster and other construction materials from entering the septic system.
5. In spring,Owner shall inspect sewer near Access Box(east of D-box)to ensure that installed
trench barriers are sufficient to prevent spring groundwater from following trench to leach
field.
Use of this system is conditioned on compliance with the following provisions:
1. The area over the leaching facilities shall be maintained (by monthly mowing during growing
season)to prevent cover erosion and/or root intrusions from trees and shrubs; see above
comments.
2. Final grades shall be constructed and maintained as shown on as-built plan,attached;
including drainage swales.
3. Owner shall conduct spring inspection of sewer route down hillside to ensure that runoff is not
running to leachfield; see above comments.
DATE: iU/-2 eyh a'O j / ENGINEER:
aV, y Newman,
o.34017, Sanitary
CC: Board of Health