Loading...
24C-159 22 Beam 2 - 2p714CS Beam 4.11.25.1 kmBeamEngine 4.11.25.1 Materials Database 1512 VHI / Hyman 22 Arlington St Northampton, MA 12-22-14 11:42am 1 of 1 All product names are trademarks of their respective owners Copyright (C) 2013 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED. **Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product installation according to the manufacturer`s specifications. John P. O'Leary Seven D Wholesale Rocky Hill, CT Member Data Description: Beam 2 Member Type: Beam Application: Floor Top Lateral Bracing: Continuous Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: IBC/IRC Live Load: 40 PLF Deflection Criteria: L/360 live, L/240 total Dead Load: 15 PLF Deck Connection: Nailed Member Weight: 6.3 PLF Filename: Beam2 Other Loads Type (Description) Side Begin End Trib. Width Other Start End Dead Start End Category Replacement Uniform (PLF) Top 0' 0.00" 5' 0.00" 0 80 Live Point (LBS) Top 2' 8.00" 3203 1478 Live Point (LBS) Top 2' 8.00" 162 0 Snow concentrated load(s) from Beam 1 at locatioin 32" 1 2 5 0 0 5 0 0 Bearings and Reactions Input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall Steel N/A 1.500" 2411# -- 2 5' 0.000" Wall Steel N/A 1.500" 2714# -- Maximum Load Case Reactions Used for applying point loads (or line loads) to carrying members Live Snow Dead 1 1498# 76# 913# 2 1705# 86# 1009# Design spans 5' 1.750" Product: 2.0 RigidLam LVL 1-3/4 x 7-1/4 2 ply PASSES DESIGN CHECKS Connect members with 2 rows of 16d common nails at 12.0" oc Minimum 1.50" bearing required at bearing # 1 Minimum 1.50" bearing required at bearing # 2 Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 6281.# 8436.# 74% 2.67' Total Load D+L Shear 2662.# 4906.# 54% 4.56' Total Load D+L TL Deflection 0.1088" 0.2573" L/567 2.5' Total Load D+L LL Deflection 0.0702" 0.1715" L/879 2.5' Total Load L Control: Positive Moment DOLs: Live=100% Snow=115% Roof=125% Wind=160%