201-1-16 Gawith submission drawings pdf.pdf154'-3 1/4"
154'-0 5/8"
79'-1 7/8"
W4
40'-0"
W6W2
W4
W2 W2
W2W6
W2W4
W2
W5
W4
W12
W12
W12
W4
W4 W4
W4
W12
W12
W12
W4
W?W?
1
0.5
0.2
0.1
53'-0"
1.85
W5 W5 W5 W5 W5
1
2
W4 W4
W4 W4
W4
W2
W4
W2
W2
W2
W2
W4
EXISTINGPENDANT
F1
47'-0 1/8"
0
foot
candles
W6
W4
W6
W4 W4 W4
W4
W4
W4
W4
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
1/2/19
13 04/25/18 CD ADDENDUM FOR
ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET, LIGHTING/RCP'S , PLANS,ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
0 Foot Candles
for building sconces
79'-1 7/8"
W4
W6
W2
W4
W2 W2
W2
W6
W2W4
W2
W5
W4
W4 W4
W5 W5 W5 W5 W5
W4 W4
W4 W4
W4
W2
W4
W2
W2
W2
W2
W4
EXISTING
PENDANT
F1
47'-0 1/8"
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
1/2/19
13 04/25/18 CD ADDENDUM FOR ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,
ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
1
0.5
0.2
0.1
53'-0"
1.85
1
2
0
foot
candles21'-0"
25'-0"
48'-0"
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
1/2/19
13 04/25/18 CD ADDENDUM FOR
ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET, LIGHTING/RCP'S, PLANS,ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
12
4
125
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
DN
DN
E
F
6'-0" x 5'-0"DOCK
LEVELLER
NEW CONCRETE
LOADING DOCK
6'-8"
x
7
'
-
5
"
x
6
'
-
1
0
"
DUM
P
S
T
E
R
30"x3
0
"
SIDE
DOO
R
12
4
125
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
DN
DN
6'-0" x 5'-0"DOCK
LEVELLER
NEW CONCRETE
LOADING DOCK
6'-8"
x
7
'
-
5
"
x
6
'
-
1
0
"
DUM
P
S
T
E
R
30"x3
0
"
SIDE
DOO
R
K
L
E
F
E
F
R
H
P
J
P
J
P
J
E
F
E
F
E
F
K
L
C
R
E
F
E
F
K
L
A
P
P
J
P
J
P
J
P
J
P
J
NEW CONCRETE
HOUSEKEEPING PAD FOR
NEW HVAC CONDENSERS.
SIZE TO BE COORDINATED
W/ HVAC CONTRACTOR.
TYP.
P
J
NEW FENCE
HEIGHT: 5'-0"
MATERIAL: STAINED CEDAR
NEW FENCE
HEIGHT: 7'-0"
MATERIAL: STAINED CEDAR
11
'
-
0
1
5
/
1
6
"
5'
-
9
9
/
1
6
"
9B
C C C C C
pr
i
n
t
2'-
5
"
5'-0"
C C C C C
C C C C C C
A
A
A
A
AA
5'
-
1
0
"
7'-0"
D
D
D
D
D
D
D
D
D
D
D
D
130
D
D
128
10
1
10
2
127
40x48
pallets 126
10
3
BRICK
11
9
111
115 113
118
112
114 117
11
6
12
4
10
8
12
1
11
0
10
9
131
125
12
0
pr
i
n
t
pr
i
n
t
134
105
1'-2"
FURNACE
5
10
7
8x
1
0
.5
8x
1
6
D
D
D
D
E EEEEEEE
26
x
1
2
15
x
1
0
18
x
1
0
22
x
1
2
16
x
1
0
18
x
1
0
2'-
5
"
5'-0"
2'-6"
6'-
0
"
26
x
1
2
15
x
1
0
18
x
1
0
26
x
1
2
15
x
1
0
18
x
1
0
BR
I
C
K
3'-
6
1
/
2
"
3'-
8
"
3'-
6
1
/
2
"
8'-0"6"6'-0"12
2
123
SIN
K
48x
1
6
RET
, 2N
D
35x
1
6
2ND
15x
1
2
2nd
F
L
SPRINKLERRISER
35x
1
6
2ND
8x16CONF
ST
E
E
L
"V
"
B
R
A
C
E
48x
1
6
RE
T
, 2N
D
35x
1
6
2ND
8x16CONF
wall
REF
R
I
G
E
R
A
T
O
R
RE
F
R
I
G
E
R
A
T
O
R
STO
V
E
ELK
A
Y
SS
S
I
N
K
WITH
I
N
INT
E
G
R
A
L
SS CO
U
N
T
E
R
TO
P
FR
O
M
EL
K
A
Y
DW
COFFEE MACHINE
WOO
D
C
O
U
N
T
E
R
DW
ELK
A
Y
SS
SI
N
K
WIT
H
I
N
CU
S
T
O
M
WOO
D
CO
U
N
T
E
R
B
C C C C C C
13
3
13
2
ICE
MAK
E
R
OVE
N
MIC
R
O
OVE
N
MIC
R
O
B
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
6'-0" x 5'-0"DOCK
LEVELLER
NEW CONCRETE
LOADING DOCK
6'-8"
x
7
'
-
5
"
x
6
'
-
1
0
"
DUM
P
S
T
E
R
30"x3
0
"
SIDE
DOO
R
13
5
OUTDOOR TERRACE
BRICK PAVING AND
WALLS
1'-
2
"
BO
T
T
L
E
FI
L
L
E
R
HALL
112
GAWITH HALL- FIRST FLOOR PLAN
Scale: 1/8" = 1'-0"A101
0 5 10 15 FT
NEW WINDOW IN EXISTING,
MODIFIED MASONRY
OPENING. WINDOW TO
MATCH ADJACENT.
MODIFY & REPAIR
EXISTING PORCH & STAIR TO REMAIN.
RENOVATE EXISTING
CENTRAL STAIR
EXISTING
FIREPLACE TO
REMAIN. RENOVATE
& REUSE.
EXISTING
FIREPLACE TO REMAIN. RENOVATE &
REUSE.
RENOVATE &
REUSE
EXISTING STAIR
NEW WALLS, ROOF, &
WINDOWS ON EXISTING FOUNDATION WALL
ramp up 8"flat entry
open abovereception
kitchen
existing stairs
desk
GRANITE
STEPS
landscaped yard
BRICK
PAVER
WALK
RAISE EXISTING
CONCRETE DOCK
PLATFORM TO MATCH
LEVEL OF ADJACENT
NEW 60" ROLLING
OVERHEAD DOOR IN
EXIST., EXPANDED M.O.
RE-USE EXISTING DOOR
BRICK
pavers
RETAINED BRICK
WINDOW OPENINGS
ex
i
s
t
i
n
g
s
t
a
i
r
east
south
west
Ex
Ex
Ex
Ex
Ex
NNEx
Ex
Ex
Ex
Ex
Ex
Ex
Ex Ex Ex Ex
Ex
Ex
Ex
Ex
Ex
Ex Ex Ex Ex Ex Ex
Ex
Ex
Ex
Ex
printers
printers
printers
tables
tables
tables
ROOF DRAIN LEADER
ROOF DRAIN
LEADER
NEW ROOF DRAIN
NEW ROOF DRAIN
BR
I
C
K
BR
I
C
K
BRICK BRICK BRICK BRICK BRICK
BR
I
C
K
BR
I
C
K
BR
I
C
K
BR
I
C
K
KEEP EXISTING STAIRS,
WALLS AND ROOF.
N
N
N
Ex
Ex
Ex
Ex
STAIR 5
1
1
1
1
1
1
1
8A
8A
9B
4A
4A
1
0
0
Masonry
rebuild
33
'
-
1
0
"
25'-0"
RE
C
Y
C
L
E
19'-0"
12'-0"
Ne
w
O
p
e
n
i
n
g
Ex
i
s
t
i
n
g
O
p
e
n
i
n
g
8A
8A
9B
4A
4A
RETAIN
FIREPLACE RETAIN
FIREPLACE
8A
BR
I
C
K
BRICK WO
O
D
WO
O
D
MEN
118
MEN
113WOMEN
114
WOMEN
115
HALL
112
JANITOR
116
SUPPLY FORBASEMENTFURNACES
LOUVERIN OPENING
UP
DN
UP
UP
DN
DN
D
N
DNRAMP
RAMP
UP
DN
DN
DN
DN
PUBLIC ACCESSIBLE ENTRANCE/EXIT
PUBLIC ACCESSIBLE
ENTRANCE/EXIT
PRIVATE ENTRANCE/EXIT
PRIVATE ENTRANCE/EXIT
PRIVATE ENTRANCE/EXIT
PRIVATE
ENTRANCE/EXIT
EXISTING OPENINGS
REMOVE & SAVE
SASHES, REINSTALL
TRIM TIGHT TO BRICK
NEW OPENINGS @
EXISTING CMU INFILL
RETAIN
EXISTING
FENESTRATION& TRIM
RETAIN
EXISTING
FENESTRATION& TRIM
±1'-1 1/2"
FACE OF BRICK BELOW
1ST FLOOR LEVEL
1
9B
12
1
12
1
12
1
8A
8A
12
1
ALL GLASS IN THIS AREA
TO HAVE FROSTED FILM
VESTIBULE
101
ENTRY LOBBY
102
CONFERENCE ROOM
103
OPEN OFFICE
104
CORRIDOR
105
MEETING ROOM
106
OPEN OFFICE
107
OFFICE
108
ENTRY HALL
109
ELEVATOR LOBBY
110
OPEN OFFICE
124
PRINTER RM.
120
PRIVATE OFFICE
121
MECH.
117 CLOS.
112A
ELEC. CLOS.
119
MEETING ROOM
122
PRIVATE OFFICE
123
SERVER RM.
125
PRODUCTION
126
UTILITY RM.
127
STAIR
4
STAIR
3
STAIR
2
EX. ELEVATOR
12
12
12
12
NE
W
C
M
U
FINISH FLOOR ELEVATION
+ 101-5/8"
FINISH FLOOR ELEVATION
+ 103-1/8"
FINISH FLOOR ELEVATION
+ 100'-3/8"
FINISH FLOOR ELEVATION
100'-0"
BR
I
C
K
P
A
V
E
R
R
A
M
P
UP
PL
A
N
T
I
N
G
S
T
R
I
P
BR
I
C
K
C
L
A
D
W
A
L
L
W
/
S
T
O
N
E
C
A
P
NEW MECHANICAL
DOCK LEVELLER
62'-0 1/8"
1ST & 2ND FLOOR SUPPLY &
RETURN FROM BASEMENT
1ST & 2ND FLOOR SUPPLY &
RETURN FROM BASEMENT
COMBUSTION AIR & EXHAUST
FLUE FROM BASEMENT
DUCTS CROSS INTO ADDITION
AT VARIOUS HEIGHTS.
DASHED DUCTS CONTINUE TO SECOND FLOOR.
8' TALL FROSTED
GLASS WALL. NO
GWB SOFFITOR KNEE WALL.
2" FURREDWALL FOR
ELECTRICAL
CONDUIT
2ND FLOOR
BATHROOM EXHAUST
& PLUMBING VENT
1ST FLOOR SUPPLY &
RETURN FROM ROOF
8B
BRICK
PAVER
WALK
TRANSFER GRILLE
BENEATH DESK.
INFILL BRICK
AT EX.
WINDOW,
REMOVE EX.
SILL AND
HEADER.
9B
9B9B
SILICONE SEALANT
BETWEEN GLASS
PANELS FOR
ACOUSTIC CONTROL
GWB WAINSCOTING WITH WOOD SILL TO
MATCH ADJACENT WINDOW SILL HEIGHTS
4A
AIR SEAL AT EX. DOORS. TROMPE
L'OEIL PANELS ON EXTERIOR.
INSTALL NEW DOOR
IN EXISTING FRAME
PRIVATE ENTRANCE/EXIT
8A
8ASILICONE SEALANT FOR
ACOUSTIC CONTROL
INFILL EXISTING MASONRY
OPENING. BRICK TO
MATCH ADJACENT.
4A
FROSTED FILM
UP
EXIT
EXIT
EXIT
EXITEXIT
EXIT
EXIT
entry
EXIT
FROM BASEMENT
EB
1
2
3
4
C D HB.5 E.5 GA
16
'
-
3
7
/
8
"
17
'
-
0
7
/
8
"
11
'
-
9
5
/
8
"
11'-0"6'-6 3/4"4'-5 1/4"11'-0"11'-0"6'-1"11'-11 1/8"9'-2"7'-6 1/2"
J
S3
S2
S1
SA SB SC SD EA EB EC ED
S2.9
S5
S6
1
E2
E1
A-408
1
3
24
A-408
7
9
THIS STEEL IS NOW
INCLUDED IN THE PROJECT
OPENINGOPENING
GLASS PANEL ON
18" TALL
KNEEWALL SEE
ELEVATION
OPENING OPENING OPENING
OPENINGOPENING
154'-4"
A-609
1
8A-612
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Thomas Douglas Architects is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
1/16/18
13 04/25/18 CD ADDENDUM FOR ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,
ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
1/16/19 PLANNING BOARD
AMENDMENTS
20
PROPOSED FIRST
FLOOR PLAN
A-101
XXXC
19 CALLOUT TO WAINSCOTING
DETAIL
PROPOSED
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Thomas Douglas Architects is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
1/16/18
13 04/25/18 CD ADDENDUM FOR ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,
ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
1/16/19 PLANNING BOARD
AMENDMENTS
20
FIRST FLOOR
REFLECTED CEILING
PLAN
A-111
FURNACE
5
8x
1
0
.5
8x
1
6
26
x
1
2
15
x
1
0
18
x
1
0
22
x
1
2
16
x
1
0
18
x
1
0
26
x
1
2
15
x
1
0
18
x
1
0
26
x
1
2
15
x
1
0
18
x
1
0
48x
1
6
RE
T
, 2N
D
35x
1
6
2ND
35x
1
6
2ND
8x16CONF
wall
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
EX
I
S
T
I
N
G
TR
A
N
S
F
O
R
M
E
R
6'-0" x 5'-0"DOCK
LEVELLER
NEW CONCRETE
LOADING DOCK
6'-8"
x
7
'
-
5
"
x
6
'
-
1
0
"
DUM
P
S
T
E
R
30"x3
0
"
SIDE DOO
R
P5
P5
P4
P4
T .1
1
2
'
P4
P4
T .1
1
2
'
P4
P4
T .1
1
2
'
P4
P4
T .1
1
2
'
P4
P4
T .1
1
2
'
P4
P4
T .1
1
2
'
P4
P4
T .1
8
'
P 6
W .3
W .3
W .3
W .3
P .1
, 8
'
OPEN ATRIUM TO 2ND FLOOR
EF
EF EFEF
R.1 R.1
R.1 R.1
R.1 R.1
GWB CEILING AT
VESTIBULE
CO
V
E
CO
V
E
S .1
, 4
'
CO
V
E
S .1
, 6
'
CO
V
E
S .1
, 4
'
-
6
"
CO
V
E
CO
V
E
S.1, 9'6'COVE
CO
V
E
C2
C2
C2C2
C1
R.2
C2
C2
HOOD
P.1, 16'
P.1, 16'
COVES.1, 28'
S .1
, 6
'
S .1
, 6
'
S .1
, 6
'
S .1
, 4
'
-
6
"
HD HD HD
HD
EXIT
EXIT
EXIT
EX
I
T
EX
I
T
EXIT
EXIT
EXIT
EM
EM
EM
EM
EM EM
EM
EM
EM
EM
EM
EM
EXIT
EM
EM
EM
EM
HS
KNOXBOX RED STROBE
HS
HS
HS
HS
S
SS
S
HS
EXIT
P .1
, 8
'
P .1
, 8
'
W .3
W .3
W .3
W .3
W.2
P 6
P 6
EM
GWB
DECORATIVE METAL PANELS AT EXTERIOR
AWNING CEILING.
PROVIDE MATCHING
FASCIA.
ALUMINUM TRUSS TRELLIS FOR
AWNINGS BY OTHERS, TYP.
S.6 S.6 S.6 S.6
EXISTING
LIGHT
W.4
S.2
EMERGENCY LIGHTS
HORN STROBE
EXIT/ EMERGENCY COMBO
STROBE
SMOKE DETECTOR
SWITCH
PULL
EXIT
EM
HS
SMOKE
S
CAMERA
EXIT
EXIT-EDGE LIT
PULL STATION
FIRE ALARM
KNOXBOX RED STROBE
FIREALARM PANEL
EMERGENCY EGRESS
HVAC
CEILING AIR DIFFUSER - USE LOW PROFILE FLUSH DIFFUSER GRILLES ON SPIRAL DUCT
D SWITCH, DIMMER
DATA PHONE
DATA ETHERNET
OUTLET
OUTLET, QUAD4
WIRING
SECURITY CAMERA
EXHAUST FAN
PD FLOOR OUTLET
DOMECAMERA
CEILING MOUNTEDDOME CAMERA
SECURITY
LIGHTING: BY GC
ACOUSTICAL CEILING PANEL,PAINTED, ATTACHED TO CELINGON STRAPPING. HANG BELOWEXISTING CONDUIT
HEAT DETECTORHEAT
F2
3X4 ACOUSTICCEILING PANEL
HD
ANNUNCIATORPANEL FIRE ALARM
R.1
W.2
R.2
C1
P3
P4
C2
P5
S.3
P 6
P.1, 16'
P.1, 4'P.1, 8'
LT 1COVE
EF
P.1, 10'
S.4
S.5
R.3
S.6
C5C6
P.1, 12'
LIGHTING: BY OWNER
HAND DRYER
IKEA
RAILROAD
STRING LIGHTS
S.6
W.3
S.1COVE
2-CIRCUIT TRACK WITH HEADS &PENDANT FIXTURES AS INDICATED(TRACK LENGTH IN FEET)
T.1 6'
F.1W.5 W6
F1
FAN, NO LIGHT
P .1
, 8
'
P .1
, 8
'
C1
R.2
RESIDENTIALKITCHENHOOD
HOOD
EXHAUST
GWB SOFFIT CONCEALING MAIN DUCT
EM
EM
EM
EM
HS
HS
EM
S.1, COVE
GWB SOFFIT
P .1
, 1
2
'
P .1
, 1
2
'
P .1
, 1
2
'
P .1
, 1
2
'
P .1
, 1
2
'
P .1
, 1
2
'
S.1, COVE
P4P4
EXIT
S.1, COVE
GWB
GWB
GWB
GWB
GWB
GWB
±10'-7" AFF
GWBGWB
GWB
GAWITH HALL- FIRST FLOOR RCP
Scale: 1/8" = 1'-0"A101
DRAFT
CURTAIN AT
DOOR
OPENING,
MIN. 18"BELOW
ADJACENT
CEILING
DRAFT CURTAIN, MIN. 18"
BELOW ADJACENT CEILING
OP
E
N
T
O
A
B
O
V
E
R.2
R.2
W.5 W.5 W.5 W.5 W.5
W .2
W .2
W .2
W .2
W .2
W.2
EM
R.2
R.2
R.2
R.2
P4 P4 P4 P4 P4
R.2 R.2
W .2
P5
P5
P5
P5
48x
1
6
RET
, 2
N
D
35x
1
6
2ND
8x16CONF
GWB SOFFIT
EM
GWB SOFFIT
GWB SOFFIT
GW
B
S
O
F
F
I
T
GWB SOFFIT
GWB
±10'-7" AFF
GWB
±10'-7" AFF
GWB
±10'-7" AFF
GWB
±11'-0" AFF
GWB
9'-0" AFF
GWB
±10'-9" AFF
GWB
GWB
±11'-0" AFF
GWB
±11'-0" AFF
WOOD PLANK PANELS WITHSOUND ATTENUATION
BATTS, TYP.
EXPOSED STEEL FRAMING
AND DECK, TYP.
PRIMED & PAINTED, TYP.
P 6
P 6
P 6
P4
P4
T .1
1
2
'
P4
T .1
8
'
STEEL COLUMNS AND
BEAMS BY G.C.
truss
truss
truss
truss
truss
truss
T .1
6
'
T.1 6'
P4
P4
T .1
1
2
'
P4
T .1
8
'
P4
P4
F.1
P.1, 16'
BELOW
CAB LIGHT
LT
2
, 6
'
LT
2
, 1
8
"
C1
C1
R.2
R.2
P .1
, 8
'
P .1
, 8
'
P .1
, 8
'
P .1
, 8
'
P .1
, 8
'
P .1
, 8
'
P .1
, 8
'
R.2 R.2
R.2 R.2
P4
P4
T .1
1
2
'
P4
P4
T .1
8
'
LT2, 2'
LT2, 2'
P .1
, 8
'
P .1
, 8
'
P .1
, 8
'
P .1
, 8
'
P .1
, 8
'
P4
EX
I
T
HS
EX
I
T
EXIT
EXIT
EX
P
O
S
E
D
O
V
A
L
D
U
C
T
F2
GWB
±10'-10" AFF
W6
W6
W .5
DIMMABLE
SCONCES
@ PATIO
GWB SOFFIT ABOVE
STOREFRONT
±24" WIDE
GWB SOFFIT ABOVE
STOREFRONT
P4 P4
F2
EB
1
2
3
4
C D HB.5 E.5 GA
16
'
-
3
7
/
8
"
17
'
-
0
7
/
8
"
11
'
-
9
5
/
8
"
11'-0"6'-6 3/4"4'-5 1/4"11'-0"11'-0"6'-1"11'-11 1/8"9'-2"7'-6 1/2"
J
S3
S2
S1
SA SB SC SD EA EB EC ED
S2.9
S5
S6
1
E2
E1
CABLE RACKS
CEILINGCASSETTE
4'-8"6'-2 1/2"
5'-
2
"
SOFFIT,TIGHT TODUCT
2'-
1
0
"
3'-
8
"
8'-0"
SOFFITS BELOW
THE SHEETROCK
CEILING
ALL FINISH CEILING AND
SOFFIT HEIGHTS TO BE
VERIFIED IN THE FIELD.
NOTE:
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
12/21/18
13 04/25/18 CD ADDENDUM FOR
ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
PROPOSED SECOND
FLOOR PLAN
A-102
AA
AA
A
A
A
AA
A
A
A
A
BBBB
BBBB
BB
BB B
22
6 B
B
B
B
20620
7
211 210 209 208
223
B
B
20
3
20
1
212
22
9
pr
i
n
t
pr
i
n
t
print
1ST & 2ND FLOOR
COMBUSTION AIR &
EXHAUST FLUE TO ROOF
1ST FLOOR
16
x
1
0
26
x
1
2
15
x
1
0
B
C CCCCCCC C C
1
A-126
A
A
A
A
A
A
A
A
BBB
BBB
BB
BB
5'-10"
6'
-
0
"
216 214
219
212
215 218
FURNACE
5
8x
1
0
.5
8x
1
6
48x
1
6
RET
, 2N
D
35x
1
6
2ND
8x16CONF
A
4'-4"
A A
A A
A
A
print
printer counter
222 224
RD
221
printer counter
HALL
214
9B 9B
9B
1
8A
1
8A
1
4A
9A 4A
9B
0
0
0
0
0 1
0
1
1
1
1
9A
9A
8A
8A
1
9A
9A
12
12
12
12
12
12
12 12
1
1
1
1
1
1
1
1
1
111
4A 4A
9B
EXISTING OPENINGS
REMOVE SILL, CUT NEW OPNEING TO FLOOR LEVEL
REMOVE SASH & TRIM, TYP.
SEE D-203
RAILING IN OPENING
AT STAIRWELL
REMOVE SASH,
REINSTALL TRIM
TIGHT TO BRICK.
GUARD RAIL IN
WINDOW OPENINGS.
HALL
214
MEN
220
MEN
215WOMEN
216
WOMEN
217
JANITOR
218
OPEN OFFICE & MEETING
201
PRIVATE OFFICE
205
CORRIDOR
211
PRIVATE W.C.
207A
OPEN OFFICE
204
HALL
212
ELEVATOR LOBBY
213
OPEN OFFICE
224
PRIVATE OFFICE
222
MECH.
219 CLOS.
214A
ELEC. CLOS.
221
MEETING ROOM
223
CONFERENCE RM.
203
PRIVATE OFFICE
202
PRIVATE OFFICE
206
PRIVATE OFFICE
207
PRIVATE OFFICE
208
PRIVATE OFFICE
209
PRIVATE OFFICE
210
EX. ELEVATOR
PRIVATE OFFICE
226
OPEN OFFICE
225
PRIVATE OFFICE
227
FINISH FLOOR ELEVATION
+ 112-2 1/2"
FINISH FLOOR ELEVATION
+ 112'-2 1/2"
FINISH FLOOR ELEVATION
+ 112'-0 1/4"
FINISH FLOOR ELEVATION
111'-11 3/8"
11B
11A
1
2
3A
5A
6
EXISTING BRICK WALLS TO REMAIN
NEW INSULATED EXTERIOR WALLS, BRICK,
AIR GAP, BARRIER, INSULATION, SHEATHING,
1-1/4 X 3 5/8" METAL STUD FURRED, 5/8" GWB
KEY
DEMO WALLS
GENERAL NOTES
NEW GYPSUM WALL BOARD CEILINGS, PRIMED AND
PAINTED THROUGHOUT WORK AREA, OTHERS TO
REMAIN
PAINT INTERIOR SURFACES: WALLS, CEILING, TRIM,
DOORS, AND WINDOWS
REFINISH EXISTING WOOD FLOORS
NEW WALL AT EXISTING BRICK WALL, 1" AIR
GAP, 1-1/4 X 3-5/8" METAL STUD FURRING,
CLAD WITH 5/8" GWB, INSULATED
NEW LOW WALL, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH 5/8" GWB, WOOD CAP
NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH WOOD, SOUND INSULATED
NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH TILE, SOUND INSULATED
NEW FULL HEIGHT, 1-1/4 X 5-1/2" METAL STUD
WALL, CLAD WITH 5/8" GWB, SOUND INSULATED
7
NEW FULL HEIGHT, GLASS/GWB WALL WITH 1-1/4 X
3-5/8" METAL STUD SOFFIT CLAD WITH 5/8" GWB
0
8A
9A
NEW FULL HEIGHT, GLASS/GWB WALL WITH 4'-0"
TALL 1-1/4 X 3-5/8" METAL STUD WALL CLAD WITH
5/8" GWB, WITH SIMILAR SOFFIT ABOVE
9B
NEW FULL HEIGHT, GLASS/GWB WALL WITH 1'-6"
STUD BASE, SOFFIT CLAD WITH 5/8" GWB,
VARYING WIDTH, 1-1/4 X 3-5/8" METAL STUD
5B NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH TILE, SOUND INSULATED
5C NEW FULL HEIGHT, 1-1/4 X 5-1/2" METAL STUD
WALL, CLAD WITH TILE, SOUND INSULATED
5D NEW FULL HEIGHT, 1-1/4 X 8" METAL STUD
WALL, CLAD WITH TILE, SOUND INSULATED
10
NEW 2" CLOSED-CELL SPRAY FOAM INSULATION
OVER EXISTING STONE/MASONRY FOUNDATION,
COVERED WITH INTUMESCENT PAINT
NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH 5/8" GWB AND WOOD,
OVER EXISTING ELEVATOR SHAFT CMU WALL
NEW FULL HEIGHT, 7/8" HAT CHANNEL, CLAD
WITH 5/8" GWB AND WOOD, OVER EXISTING
ELEVATOR SHAFT CMU WALL
4A NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH 5/8" GWB, SOUND INSULATED
NEW FULL HEIGHT, GLASS/GWB WALL
NEW FULL HEIGHT INFILL AT STAIRWELLS, 1-HR
FIRE RATED 1-1/4 X 3-5/8" METAL STUD WALL,
CLAD WITH 5/8" GWB, SOUND INSULATED
4B
3B
NEW INSULATED EXTERIOR WALLS, BRICK,
AIR GAP, BARRIER, INSULATION, SHEATHING,
1-1/4 X 3 5/8" METAL STUD FURRED, 5/8" GWB
8B
13 FIRE BARRIER AT STAIRS, 5/8" GWB, 1-1/2"x3-5/8"
METAL STUDS, 3" ACOUSTICAL BATTS
12 NEW 1-1/2 X 4" C-H METAL STUD FURRED,
SHAFT WALL
2
A-608
2ND FLOOR
SUPPLY & RETURN
FROM BASEMENT
2ND FLOOR
SUPPLY FROM
BASEMENT
EXHAUST FLUES FROM
BASEMENT BOILERS
RAILING AT OPENING
1ST & 2ND FLOOR SUPPLY
& RETURN FROM
ROOFTOP UNITS.
2ND FLOOR
BATHROOM EXHAUST
& PLUMBING VENT
EQ
.
EQ
.
11
'
-
3
1
/
2
"
5'-
1
1
/
4
"
12'-6"
19
'
-
8
"
6'-0"
3'-
0
1
/
2
"
6'-0"
7 1/4"
1'-2"
5'-10"
6'-
0
"
5'-10"
7'
-
0
"
COUNTER AT RAIL, TYP.
EB
1
2
3
4
C D HB.5 E.5 GA
16
'
-
3
7
/
8
"
17
'
-
0
7
/
8
"
11
'
-
9
5
/
8
"
11'-0"6'-6 3/4"4'-5 1/4"11'-0"11'-0"6'-1"11'-11 1/8"9'-2"7'-6 1/2"
J
E2
E1
S3
S2
SA SB SC SD EA EB EC ED
S1
S2.9
0.5
2
A-124
D-
2
0
5
SA.0
2
BO
T
T
L
E
FI
L
L
E
R
4
A-405
A-407
3
1
2
A-406
A-407
2
2 2
2
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
12/21/18
13 04/25/18 CD ADDENDUM FOR
ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
PROPOSED THIRD
FLOOR PLAN
A-103
307308309310
313 314 316315
SK
Y
L
I
G
H
T
1'-6"
A
A
A
A
UP
RD
A
AA
A
327 328 329326
331 332 333330
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
BENCH
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
305
W/D
RD
TA
P
E
R
E
D
I
N
S
U
L
A
T
I
O
N
1/
4
"
P
E
R
1
2
"
TA
P
E
R
E
D
I
N
S
U
L
A
T
I
O
N
1/
4
"
P
E
R
1
2
"
RD
+1
0
"
+6
"
+8
"
+4
"
+2
"
+6
"
+8
"
+4
"
31
7
306
311
321
31
9
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
BENCH
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
lo
c
k
e
r
18
x
2
x
4
x
7
2
(6
"
b
a
s
e
)
323
ref.mic
r
o
.
A C D E HBE.5 G JB.5
A AAAAA
322
30
3
AREA = 1927 sf
OCCUPANCY = 385
(ASSEMBLY - STANDING SPACE)
EXHAUST FLUES FROM
BASEMENT BOILERS
2ND & 1ST FLOOR SUPPLY & RETURN FROM ROOFTOP
UNITS.
1ST & 2ND FLOOR
COMBUSTION AIR &
EXHAUST FLUE TO ROOF
2ND FLOOR
1ST FLOOR
2ND FLOOR BATHROOM
EXHAUST AND VENT
FURNACE
7
8x
1
8
8x
1
2
8x
1
0
.5
8x
1
2
20sf LOUVER &
PLENUM - PER
MECHANICAL
FU
R
N
A
C
E
8 (
A
B
O
V
E
)
6" HALF ROUND
COPPER GUTTER
A AAAAA
BOTTLE FILLING STATION
AA
AAA
A AA
AAA
A
7'
-
0
"
5'-10"
1
A-127
RD
SAFETY GLASS AT
THESE WINDOWS
A
A
A
TAPERED INSULATION
1/4" PER 12"
TAPERED INSULATION
1/4" PER 12"
TAPERED INSULATION
1/4" PER 12"
TAPERED INSULATION
1/4" PER 12"
48x
1
6
RET
, 2N
D
DOWNSPOUT TO
ROOF BELOW, TYP.
32
5
SAFETY GLASS AT
THESE WINDOWS
48" X 30"
48" X 30"
UP
+20"
+20"
+20"
0"
0"
OFD
OVERFLOW SCUPPER
OVERFLOW SCUPPEROVERFLOW PARAPET
A
A
A
A
HD
25'-1"
5'
-
0
"
5'
-
0
"
5'
-
0
"
2'-5"6'-1"7'-3"6'-10"2'-6"
9'
-
9
"
2'
-
7
1
/
2
"
W/D
UP
UP RAMP
+20"
+8"
RA
M
P
324
8x 8x 8x
GAWITH HALL- THIRD FLOOR PLAN
Scale: 1/8" = 1'-0"A103
0 5 10 15 FT
NEW
CANOPY
NEW EPDM
LOW-SLOPE ROOF
WITH WOOD DECK
ON TOP
GUARD RAIL
REMOVE EXISTING
WINDOW. INSTALL
NEW FULL GLASS
DOOR
NEW EPDM
LOW-SLOPE ROOF
Ex Ex Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
Ex
ExExEx
Ex
Ex
Ex
ExEx
ExEx
Ex
Ex
Ex
Ex
Ex
Ex Ex
Ex
Ex
Ex
Ex
Ex
1
1
4A
12
1
1
1
1
1
1 1
1
1
1
1
1
1
4A
4A
4A
INFILL
BOTTOM
HALF OF EX.
WINDOW
4A
1
A-608
Masonry
rebuild
Masonry
rebuild
RENOVATE EXISTING CENTRAL STAIR
1 1
2 2
2
BEAM
BEAM
8x
4
A-124
3
A-124
1
A-607
SIM.
op
e
n
t
o
b
e
l
o
w
DN
DN
DN
4A
4A
1
9A
1
1
1
12
RAILING POSTS
ATTACHED TO
CONCRETE DECK, PITCH
POCKETS AT ALL EPDM
PENETRATIONS, TYP.
ROOF DECK
318
OPEN OFFICE
301
OPEN OFFICE
303
FITNESS SPACE
312
FAMILY RM.
317
STAIR
4
STAIR
3
STAIR
2
EX. ELEVATOR
OFFICE
302
OFFICE
304
CORRIDOR
305
ELEVATOR LOBBY
306
MEN'S LOCKERS
308
MEN'S LOUNGE
309
W.C.
308A
ELEC. CLOS.
307
W.C.
310A
WOMEN'S LOCKERS
310
WOMEN'S LOUNGE
311
W.C.
308B
W.C.
308B
W.C.
308C
W.C.
310C
W.C.
308D
W.C.
310D
FURNACE RM.
309A
MOP SINK
313
LAUNDRY
314
ACCESSIBLE W.C.
315
CORRIDOR
316
A-40810
12
124A
4A
11B
11A
1
2
3A
5A
6
EXISTING BRICK WALLS TO REMAIN
NEW INSULATED EXTERIOR WALLS, BRICK,
AIR GAP, BARRIER, INSULATION, SHEATHING,
1-1/4 X 3 5/8" METAL STUD FURRED, 5/8" GWB
KEY
DEMO WALLS
GENERAL NOTES
NEW GYPSUM WALL BOARD CEILINGS, PRIMED AND
PAINTED THROUGHOUT WORK AREA, OTHERS TO
REMAIN
PAINT INTERIOR SURFACES: WALLS, CEILING, TRIM,
DOORS, AND WINDOWS
REFINISH EXISTING WOOD FLOORS
NEW WALL AT EXISTING BRICK WALL, 1" AIR
GAP, 1-1/4 X 3-5/8" METAL STUD FURRING,
CLAD WITH 5/8" GWB, INSULATED
NEW LOW WALL, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH 5/8" GWB, WOOD CAP
NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH WOOD, SOUND INSULATED
NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH TILE, SOUND INSULATED
NEW FULL HEIGHT, 1-1/4 X 5-1/2" METAL STUD
WALL, CLAD WITH 5/8" GWB, SOUND INSULATED
7
NEW FULL HEIGHT, GLASS/GWB WALL WITH 1-1/4 X
3-5/8" METAL STUD SOFFIT CLAD WITH 5/8" GWB
0
8A
9A
NEW FULL HEIGHT, GLASS/GWB WALL WITH 4'-0"
TALL 1-1/4 X 3-5/8" METAL STUD WALL CLAD WITH
5/8" GWB, WITH SIMILAR SOFFIT ABOVE
9B
NEW FULL HEIGHT, GLASS/GWB WALL WITH 1'-6"
STUD BASE, SOFFIT CLAD WITH 5/8" GWB,
VARYING WIDTH, 1-1/4 X 3-5/8" METAL STUD
5B NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH TILE, SOUND INSULATED
5C NEW FULL HEIGHT, 1-1/4 X 5-1/2" METAL STUD
WALL, CLAD WITH TILE, SOUND INSULATED
5D NEW FULL HEIGHT, 1-1/4 X 8" METAL STUD
WALL, CLAD WITH TILE, SOUND INSULATED
10 NEW 2" CLOSED-CELL SPRAY FOAM INSULATION
OVER EXISTING STONE/MASONRY FOUNDATION,
COVERED WITH INTUMESCENT PAINT
NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH 5/8" GWB AND WOOD,
OVER EXISTING ELEVATOR SHAFT CMU WALL
NEW FULL HEIGHT, 7/8" HAT CHANNEL, CLAD
WITH 5/8" GWB AND WOOD, OVER EXISTING
ELEVATOR SHAFT CMU WALL
4A NEW FULL HEIGHT, 1-1/4 X 3-5/8" METAL STUD
WALL, CLAD WITH 5/8" GWB, SOUND INSULATED
NEW FULL HEIGHT, GLASS/GWB WALL
NEW FULL HEIGHT INFILL AT STAIRWELLS, 1-HR
FIRE RATED 1-1/4 X 3-5/8" METAL STUD WALL,
CLAD WITH 5/8" GWB, SOUND INSULATED
4B
3B
NEW INSULATED EXTERIOR WALLS, BRICK,
AIR GAP, BARRIER, INSULATION, SHEATHING,
1-1/4 X 3 5/8" METAL STUD FURRED, 5/8" GWB
8B
13 FIRE BARRIER AT STAIRS, 5/8" GWB, 1-1/2"x3-5/8"
METAL STUDS, 3" ACOUSTICAL BATTS
12 NEW 1-1/2 X 4" C-H METAL STUD FURRED,
SHAFT WALL
Ex
Ex
13
13
EB
1
2
3
4
C D HB.5 E.5 GA
16
'
-
3
7
/
8
"
17
'
-
0
7
/
8
"
11
'
-
9
5
/
8
"
11'-0"6'-6 3/4"4'-5 1/4"11'-0"11'-0"6'-1"11'-11 1/8"9'-2"7'-6 1/2"
J
E2
E1
S3
S2
SA SB SC SD EA EB EC EDSA.0
S1
S2.9
3
33'-
4
1/2
"
26'-
0
3/4
"
MI
N
.
1
A-406
78'
-
2
"
DI
A
G
O
N
A
L
DI
S
T
A
N
C
E
8
A-612
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
12/21/18
13 04/25/18 CD ADDENDUM FOR
ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
PROPOSED ROOF
PLAN
A-104
AREA = 1927 sfOCCUPANCY = 385
(ASSEMBLY - STANDING SPACE)
COMBUSTION AIR &
FLUES FROM
FURNACES ON
FLOORS 1-3
ERV IN ATTICBATHROOM
EXHAUST
FAN IN ATTIC
EXISTING
ROOF HATCH
EXISTING FLAT
ROOF
ROOF DECK
OVER NEW
TPO FLAT
ROOF
COMBUSTION AIR & FLUE
FROM BASEMENT FURNACES
ENTRY ROOF WITH
SUPPORT RODS/CABLES.
NEW EPDM ROOF
NEW EPDM ROOF
EXISTING
ASPHALT
SHINGLE
ROOF
EXISTING
ASPHALT
SHINGLE
ROOF
EXISTING
ASPHALT
SHINGLE
ROOF
SK
Y
L
I
G
H
T
LADDER
RTU ON CURB
ROOFED ENCLOSURE
OVER DUCTS
DUCTS RUN ABOVE EX.
ROOF UNTIL ABLE TO PASS
THROUGH ROOF INTO
SPACE ABOVE CORRIDOR
REMOVE ROOFING
AND FRAMING IN THIS
AREA FOR DUCT
PASSAGE THROUGH
ROOF PLANE
DUCTS IN SPACE ABOVE
CORRIDOR
3'-0 3/8" MIN.
RAILING
ROOF TOP
UNIT FOR
2ND & 3RD
ROOF DECK
OVER NEW
TPO FLAT
ROOF
NEW SYNTHETIC
SLATE SHINGLE
ROOF, TYP.
NEW SYNTHETIC SLATE
SHINGLE ROOF, TYP.
EB
1
2
3
4
C D HB.5 E.5 GA
16
'
-
3
7
/
8
"
17
'
-
0
7
/
8
"
11
'
-
9
5
/
8
"
11'-0"6'-6 3/4"4'-5 1/4"11'-0"11'-0"6'-1"11'-11 1/8"9'-2"7'-6 1/2"
J
E2
E1
S3
S2
SA SB SC SD EA EB EC EDSA.0
S1
S2.9
3
33'-
4
1/2
"
26'-
0
3/4
"
MI
N
.
R
19
REVISED
ROOFING
MATERIALS
12
4
125
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
RE-USE EXISTING
DOOR
DN
DN
E
F
6'-0" x 5'-0"DOCK
LEVELLER
RAISE EXISTING
CONCRETE DOCK
PLATFORM TO MATCH
LEVEL OF ADJACENT
NEW 60" ROLLING
OVERHEAD DOOR
IN EXIST.,
EXPANDED M.O.
NEW MECHANICAL
DOCK LEVELLER
NEW CONCRETE
LOADING DOCK
6'-8"
x
7
'
-
5
"
x
6
'
-
1
0
"
DUM
P
S
T
E
R
30"x3
0
"
SIDE
DOO
R
126
12
4
125
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
E
X
I
S
T
I
N
G
T
R
A
N
S
F
O
R
M
E
R
RE-USE EXISTING
DOOR
DN
DN
6'-0" x 5'-0"DOCK
LEVELLER
RAISE EXISTING
CONCRETE DOCK
PLATFORM TO MATCH
LEVEL OF ADJACENT
NEW 60" ROLLING
OVERHEAD DOOR
IN EXIST.,
EXPANDED M.O.
NEW MECHANICAL
DOCK LEVELLER
NEW CONCRETE
LOADING DOCK
6'-8"
x
7
'
-
5
"
x
6
'
-
1
0
"
DUM
P
S
T
E
R
30"x3
0
"
SIDE
DOO
R
126
K
L
E
F
E
F
R
H
P
J
P
J
P
J
E
F
E
F
E
F
K
L
C
R
E
F
E
F
K
L
A
P
P
J
P
J
P
J
P
J
P
J
NEW CONCRETE
HOUSEKEEPING PAD FOR
NEW HVAC CONDENSERS.
SIZE TO BE COORDINATED
W/ HVAC CONTRACTOR.
TYP.
P
J
NEW FENCE
HEIGHT: 5'-0"
MATERIAL: STAINED CEDAR
NEW FENCE
HEIGHT: 7'-0"
MATERIAL: STAINED CEDAR
3'-0"
10'-0
"
5'
-
0
"
AHU-1
35X35
GE
N
E
R
A
T
O
R
35X3535X35
2'-0"
3'-3 1/4"
5'-0"
8'-7 1/2
"
9'
-
0
"
3'
-
1
1
1
/
2
"
13
'
-
5
1
/
4
"
3'-
0
"
2'
-
1
1
"
5'-
0
"
3'
-
4
1
/
4
"
4'-
0
"
10'-7 13/16"
13
'
-
3
"
6'
-
0
1
/
4
"
7'
-
9
1
/
2
"
1'
-
4
1
/
4
"
7'-6"15'-9 3/4"
CO
N
D
E
N
S
O
R
CO
N
D
E
N
S
O
R
128.79°
1
7
'
-
0
"
9'-7 7/1
6
"
1'-0"
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be used for construction purposes unless the Signed professional seal of a registered architect employed by Thomas Douglas Architects is affixed in the space below. The Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
12/21/18
13 04/25/18 CD ADDENDUM FOR ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,
ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
PROPOSED DETAIL
FIRST FLOOR PLAN
A-101B
GAWITH HALL
SOUTHWEST CORNER
GROUND MOUNTED HVAC
AND SCREENING
ADAMS
PARKING
LAWN
GAWITH
INTERIOR
CENTER W4 FIXTURE VERTICALLY ON
UPPER SASHES
F1
ACDEHBE.5GJ B.5
Ex
Ex
Ex
Ex Ex
Ex
FILL EXISTING WINDOW OPENING
TO MATCH ADJACENT BRICK.NEW
NEW BRICK WALL WITH BROWNSTONE CAP TO MATCH
MASONRY AT EXISTING BUILDING
NEW ROOFTOP
MOUNTED HVAC
EQUIPMENT
(BEYOND)
NEW
NEW
MODIFY EXISTING LOADING DOCK AND ADD TRASH ENCLOSURE. EXPAND BELOW NEW ROLL UP DOOR.
NEW WINDOW IN EXISTING MODIFIED
MASONRY OPENING. MATCH
ADJACENT WINDOWS.NEW OVERHEAD DOOR IN EXISTING, EXPANDED OPENING
REPAINT EXISTING RAIL
AND GUARD AT EXISTING
STAIRS, TYPICAL
REPAINT EXISTING EXTERIOR WOOD TRIM, TYPICAL.
Ex
Ex
ExEx
ExEx
Ex Ex
ExEx
Ex
EXISTING WINDOW
TO REMAIN, TYPICAL.
WEST ELEVATION
Scale: 1/8" = 1'-0"1
EXIST. LOADING
DOCK, STEPS & ROOF
TO REMAIN
ENCLOSURE OVER EXISTING STAIRS TO BASEMENT TO REMAIN.
NEW THIN BRICK CLAD
PATIO WITH STEEL
GUARDRAIL
STEEL TRELLIS WITH
ALUMINUM TRUSSES
NEW RED BRICK WALLS, STANDING SEAM METAL ROOF, &
CLAD WOOD WINDOWS
BUILT ON THE EXISTING
FOUNDATION WALL
WEST ELEVATION AT DECK
Scale: 1/8" = 1'-0"2
11'
-
8
3
/
4
"
11'
-
1
1
3
/
8
"
FIRST FL - T.O. FINISH
100'-0"
SECOND FL - T.O. FINISH
111'-11 3/8"
3RD FL - T.O. FINISH
123'-3 3/4"
ADDITION ROOF - T.O. SLAB
123'-8 1/8"
KITCHEN HOOD EXHAUST
130
F
E E
C C
D
B C C
E E
C C
E E
C C
E E
C C
A AAAA AAAA
7'
-
0
"
TY
P
.
W5 W5 W5 W5
W5 W5 W5 W5 W5
A
SEE 1/A-503 FOR
BRICK COURSING
DETAILS
BRICK ASSEMBLY EXPANSION
JOINTS, TYP.
DISCONTINUE THIN BRICK
VENEER AT FOUNDATION
AFTER 6'±.
CONTINUE BACKER
BOARD BENEATH DECK,
PAINTED BLACK
WINDOWS AT DECK
TO HAVE SAFETY
GLAZING, TYP.
7'
-
0
"
A
.F
.F
.
TY
P
.
Ex
W5
WEST ELEVATION OF EAST WING, AT ROOF DECK
Scale: 1/8" = 1'-0"1A
ACDEHBE.5GJ B.544'-3"
27'-2"17'-1"
EQ.EQ.
2'
-
2
"
SYNTHETIC SLATE ROOFING ON STEEP MANSARD ROOF & ON
VERTICAL SURFACES, TYP.
BLACK EPDM ROOFING ON LOW
SLOPE MANSARD ROOF, TYP.
W4
W4
W2 W2
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
1/4/19
13 04/25/18 CD ADDENDUM FOR
ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
1/4/19 MULTIPLE REVISED SHEETS19
PROPOSED NORTH
AND WEST
ELEVATIONS
A-201
W4
REPAINT EXISTING RAIL AND GUARD AT
EXISTING STAIRS,
TYPICAL.
REPAINT EXISTING EXTERIOR
WOOD TRIM, TYPICAL.
NEW DOOR IN EXISTING, EXPANDED WINDOW OPENING(BEYOND IN SOUTH WING)
NEW THIN BRICK CLAD PATIO WITH STEEL
GUARDRAIL
MODIFY EXISTING DECK & STEPS. NEW LOADING
DOCK. NEW ROOF.
NEW DOOR IN
EXISTING OPENING
123 0.5E2E14
NORTH ELEVATION
Scale: 1/8" = 1'-0"3 NEW STEEL TRELLIS
TWO EXISTING WINDOWS
(BEYOND) TO REMAIN
Ex
Ex
Ex
Ex
ExEx Ex
Ex
Ex
Ex
ExEx
Ex
Ex
Ex Ex
Ex
Ex
Ex
Ex
Ex
Ex
ExExEx
Ex
Ex
Ex
DECORATIVE BRICK BANDING
METAL CORNICE, PAINTED
NEW ADDITION AT ALLEY
NEW ENTRY AT ALLEY ADDITION
NEW RED BRICK WALLS, STANDING SEAM
METAL ROOF, & CLAD WOOD WINDOWS
BUILT ON THE EXISTING FOUNDATION WALL
J
K B BB B
D
B B
D D DD
2'-
1
1
/
2
"
7'
-
0
"
A
.F
.F
.
TY
P
.
A
17'-1 5/8"
SEE 1/A-503 FOR
BRICK COURSING
DETAILS
BRICK ASSEMBLY EXPANSION
JOINTS, TYP.
FIRST FL - T.O. FINISH
100'-0"
SECOND FL - T.O. FINISH
111'-11 3/8"
3RD FL - T.O. FINISH
123'-3 3/4"
ADDITION ROOF - T.O. SLAB
123'-8 1/8"
INFILL BRICK AT EX. WINDOW
CENTER W4
FIXTURE
VERTICALLY ON UPPER SASHES
W4
W2EXISTING WINDOW TO
REMAIN, TYPICAL.
7'
-
0
"
A
.F
.F
.
TY
P
.
NEW DOOR
TO ROOF
SOUTH ELEV. OF CLERESTORY
Scale: 1/8" = 1'-0"3B
1 2 3 4
RELIEF VENT LOUVER
SYNTHETIC SLATE
ROOFING ON VERTICAL
SURFACES, TYP.
ExEx ExExExExExEx
W2W2W2W2W2
NORTH ELEVATION OF WEST WING, AT ROOF DECK
Scale: 1/8" = 1'-0"3A
1234
SYNTHETIC SLATE
ROOFING ON STEEP MANSARD ROOF & ON VERTICAL SURFACES, TYP.
BLACK EPDM ROOFING ON LOW
SLOPE MANSARD ROOF, TYP.
21
'
-
7
7
/
1
6
"
25
'
-
7
1
/
4
"
9'
-
6
7
/
1
6
"
W4 W4
W2 W2 W2 W2
W2 W2 W2
W2
W5
W4W4W4
W4W4W4W4W4W4W4
W6
EXISTING ASPHALT
SHINGLES TO REMAIN
REPAINT EXISTING EXTERIOR
WOOD TRIM, TYPICAL.
Ex
Ex
Ex
Ex
Ex
Ex
Ex Ex
Ex
ExEx Ex
Ex
Ex
Ex
Ex Ex
Ex
Ex Ex
Ex
Ex
Ex
Ex
Ex
Ex Ex
Ex
Ex Ex
ExEx
Ex Ex Ex
Ex
Ex
Ex
Ex
Ex Ex Ex Ex Ex
ExExExExEx
Ex Ex
Ex
Ex
Ex Ex
Ex
Ex Ex Ex Ex
Ex Ex
ExEx
Ex
Ex
Ex
Ex
Ex
Ex Ex
Ex
Ex
ExEx
ExEx
Ex
Ex
Ex Ex
Ex
Ex
SA SB SC SD EA EB EC ED
A C D E HB.5 E.5 G J
S3S2
1 2 30.5
E2
E14
S1
EAST ELEVATION
Scale: 1/8" = 1'-0"1
SOUTH ELEVATION
Scale: 1/8" = 1'-0"2
17'-0 1/2"
FIRST FL - T.O. FINISH
100'-0"
SECOND FL - T.O. FINISH
111'-11 3/8"
3RD FL - T.O. FINISH
123'-3 3/4"
ADDITION ROOF - T.O. SLAB
123'-8 1/8"
FIRST FL - T.O. FINISH
100'-0"
SECOND FL - T.O. FINISH
111'-11 3/8"
3RD FL - T.O. FINISH
123'-3 3/4"
ADDITION ROOF - T.O. SLAB
123'-8 1/8"
CENTER W4
FIXTURE
VERTICALLY
ON UPPER
SASHES, TYP.
EXISTING WINDOW TO REMAIN, TYPICAL.
REPAINT EXISTING RAIL AND GUARD
AT EXISTING STAIRS, TYPICAL
REPAINT EXISTING EXTERIOR
WOOD TRIM, TYPICAL.
EXPAND EXISTING LOADING DOCK
REMOVE EXISTING HVAC GRILLE. INSTALL
TOOTHED-IN BRICK TO MATCH EXISTING
ADJACENT MATERIAL (BRICK SHAPE, COLOR
TEXTURE & MORTAR)
REPAINT EXISTING RAIL AND GUARD AT EXISTING STAIRS, TYPICAL
EXISTING BASEMENT STAIRS TO
REMAIN. ROOF & WALLS TO REMAIN.
CENTER W4
FIXTURE
VERTICALLY
ON UPPER
SASHES, TYP.
EXISTING WINDOW TO REMAIN, TYPICAL.
W6
7 fc
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
1/4/19
13 04/25/18 CD ADDENDUM FOR
ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
1/4/19 MULTIPLE REVISED SHEETS19
PROPOSED SOUTH
AND EAST ELEVATIONS
A-202
130
D
D
128
101102
127
126
103
BRICK
119
111
115 113
118
112
114 117
116
124
108
121
110
109
131
125
120
134
105
107
8x10.5 8x16
D
D
D
D
E EEEEEEE
26x12
15x1018x10
22x12
16x1018x10
26x12
15x1018x10
26x12
15x1018x10
BRICK
122
123
SINK
48x16RET, 2ND
35x162ND
SPRINKLERRISER
35x162ND
8x16CONF
STEEL "V" BRACE
wall
REFRIGERATOR
REFRIGERATO
R
STOVE
ELKAY SS SINKWITHIN INTEGRAL
SS COUNTER TOP
FROM ELKAY
DW
COFFEE MACHINE
WOOD COUNTE
R
DW
ELKAY SS SINKWITHIN CUSTOM
WOOD COUNTER
133
132
ICEMAKER
OVEN
MICRO
OVEN
MICRO
EXIS
T
I
N
G
TRAN
S
F
O
R
M
E
R
EXISTING
TRANS
F
O
R
M
E
R
6'-0" x 5'-0"DOCKLEVELLER
NEW CONCRETELOADING DOCK
6'-8"x7'-5
"
x
6
'
-
1
0
"
DUMPST
E
R30"x30"
SIDE DOOR
135
BOT
T
L
E
FILL
E
R
KEY PLAN
1/A202
2/
A
2
0
2
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
12/21/18
13 04/25/18 CD ADDENDUM FOR
ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
BUILDING SECTIONS
A-301
130
D
D
128
101102
127
126
103
BRICK
119
111
115 113
118
112114 117 116
124
108
121
110
109
131
125
120
134
105
107
8x10.5 8x16
D
D
D
D
E EEEEEEE
26x12
15x10
18x10
22x12
16x1018x10
26x12
15x10
18x10
26x12
15x10
18x10
BRICK
122
123
SINK
48x16RET, 2ND
35x162ND
SPRINKLERRISER
35x162ND
8x16CONF
STEEL "V" BRAC
E
wall
REFRIGERAT
O
R
REFRIGER
A
T
O
R
STOVE
ELKAY SS SINK
WITHIN INTEGRAL
SS COUNTE
R
TOP
FROM ELKAY
DW
COFFEE MACHINE
WOOD COUNTER
DW
ELKAY SS SINK
WITHIN CUSTOM
WOOD COUNTER
133
132
ICEMAKER
OVEN
MICRO
OVEN
MICRO
EXIST
I
N
G
TRANS
F
O
R
M
E
R
EXISTIN
G
TRANSF
O
R
M
E
R
6'-0" x 5'-0"DOCKLEVELLER
NEW CONCRETELOADING DOCK
6'-8"x7'-5"x
6
'
-
1
0
"
DUMPST
E
R30"x30"SIDE DOOR
135
BOTT
L
E
FILLE
R
KEY PLAN
1/
A
3
0
1
1/
A
3
0
1
2/
A
3
0
1
2/
A
3
0
1
10' LIGHT FIXTURE
ENTRY LOBBYCONFERENCE ROOM
OPEN OFFICE
PRIVATE OFFICE
PRIVATE OFFICE
STAIR
NEW WOOD DECK WITH STEEL GUARDRAIL
SUPPLY DUCT
16' LIGHT FIXTURE
NEW STEEL TRELLIS
16' LIGHT FIXTURE
9'-
4
7
/
8
"
10' LIGHT FIXTURE STAIR
STAIR
6'
-
0
"
2'-
4
"
SUPPLY SUPPLY
SUPPLY
REPAINT EXISTING
EXTERIOR WOOD TRIM,
TYPICAL.
NEW DOOR IN EXISTING,
EXPANDED WINDOW OPENING
MODIFY EXISTING
DECK & STEPS.
NEW LOADING DOCK. NEW ROOF.
(3) EXISTING WINDOWS IN DORMERS TO
REMAIN (BEYOND)
EX
Ex
Ex
EXISITNG WINDOW TO REMAIN,
TYPICAL
E2 E1
5'-0"
Ex
Ex
Ex
Ex
Ex
Ex
BASEMENT - T.O. SLAB
90'-10 1/2"
FIRST FL - T.O. FINISH
100'-0"
SECOND FL - T.O. FINISH
111'-11 3/8"
ADD. ROOF - T.O. SLAB
123'-8 1/8"
3RD FL - T.O. FINISH
123'-0 3/8"
ROOF DECK
124'-8 3/8"
BUILDING SECTION AT TOWER
Scale: 1/8" = 1'-0"1
J
K
W2
9 1/2"
B B
DD
open
NEW DOOR IN EXISTING, EXPANDED
WINDOW OPENING
ExExEx12' LIGHT FIXTURE 16' LIGHT FIXTURE
OPEN OFFICE
SUPPLY
16x4
0
6"1'-2 1/8"
7 1/4"4 3/8"2 3/4"
16x4
0
1234
11'-9 5/8"17'-0 7/8"16'-3 7/8"
10
'
-
7
"
9'
-
8
3
/
4
"
9'-
2
1
/
2
"
10
'
-
7
"
9'-
1
0
3
/
4
"
9'
-
8
3
/
4
"
10
'
-
7
"
9'
-
8
3
/
4
"
9'-
2
1
/
2
"
P6P6
open
NEW DOOR IN EXISTING, EXPANDED
WINDOW OPENING
ExExEx12' LIGHT FIXTURE 16' LIGHT FIXTURE4' LIGHT
OPEN OFFICE
SUPPLY
SUPPLY
NEW ROOFTOP
MECHANICAL EQUIPMENT ON NEW CURB
REPAINT EXISTING
EXTERIOR WOOD TRIM,
TYPICAL.
NEW DOOR IN EXISTING,
EXPANDED WINDOW OPENING
MODIFY EXISTING
DECK & STEPS.
NEW LOADING DOCK. NEW ROOF.
(3) EXISTING WINDOWS IN DORMERS TO
REMAIN (BEYOND)
EX
Ex
Ex
EXISITNG WINDOW TO REMAIN,
TYPICAL
0.5E2E1
5'-0"
Ex
Ex
Ex
Ex
Ex
Ex
8x40
14x30
10' LIGHT FIXTURE
open
open
ATRIUM
CONFERENCE ROOM
OPEN OFFICE
PRIVATE OFFICE
PRIVATE OFFICE
HALL
CAFE
NEW WOOD DECK WITH STEEL GUARDRAIL
SUPPLY DUCT
SUPPLY DUCT SUPPLY DUCT
16' LIGHT FIXTUREP4
P4
P.3
NEW STEEL TRELLIS
6'
-
0
"
2'-
4
"
16' LIGHT FIXTURE
10
'
-
7
"
8'-
1
3
/
4
"
9'
-
8
3
/
4
"
8'
-
1
3
/
4
"
11
'
-
9
1
/
8
"
9'-
4
7
/
8
"
8'-
0
"
10' LIGHT FIXTURE
8'
-
0
"
8x15
SUPPLY SUPPLY
P4
P4 P4P4
P4
BASEMENT - T.O. SLAB
90'-10 1/2"
FIRST FL - T.O. FINISH
100'-0"
SECOND FL - T.O. FINISH
111'-11 3/8"
ADD. ROOF - T.O. SLAB
123'-8 1/8"
3RD FL - T.O. FINISH
123'-0 3/8"
ROOF DECK
124'-8 3/8"
BUILDING SECTION AT TOWER
Scale: 1/8" = 1'-0"2
10x15
16x4
0
10x15
16x4
0
2
A-503
SLOPE OF EX. ROOF BEYOND
NEW ROOF TO COVER NEW
DUCTWORK FROM
ROOFTOP UNIT
DUCT RUN ABOVE CORRIDOR
1234
11'-9 5/8"17'-0 7/8"16'-3 7/8"
P6P6
9
Rev Date Description
Project Title
Architects, Inc.
196 Pleasant St.
Northampton,
MA 01060
413-585-0641
REGISTERED ARCHITECT,
COMMONWEALTH OF
MASSACHUSETTS
This drawing is not intended nor shall it be
used for construction purposes unless the
Signed professional seal of a registered
architect employed by Thomas Douglas
Architects is affixed in the space below. The
Architect shall be deemed the author of these
documents and shall retain all common law,
statutory and other reserved rights, including
the copyright.
THOMAS DOUGLAS
New Offices For CHECKWRITERS
1924 LLC
Gawith Hall
Historic Round Hill Summit
Northampton, Massachusetts
Issue Date:
Drawn By:
Checked By:
Project ID:
Drawing No.
Project North
1 01/05/2016 SCHEMATIC REVIEW
Sheet Title
Scale:
07/07/2016
TD/DB/JB/SL
TD
15-018
AS NOTED
2 01/21/2016 PROGRESS SET
3 01/28/2016 PROGRESS SET - DEMO
4 03/31/2016 PROGRESS SET - DEMO
5 04/11/2016 SCHEMATIC REVIEW
6 05/18/2016 PROGRESS SET - REVIEW
7 06/23/2016 REVIEW
8 07/07/2016 PROGRESS SET - REVIEW
08/18/17 NPS. MHC SUBMISSION
10 11/29/17 PERMIT SET
CO
N
S
T
R
U
C
T
I
O
N
SE
T
11 02/19/18 BID SET
12 03/13/18 REVISED BID SET
12/21/18
13 04/25/18 CD ADDENDUM FOR
ADDITION - STRUCTURAL
14 05/16/18 KITCHEN REVISION
15 06/07/18 CONSTRUCTION SET
16 08/10/18 REVISED CONSTRUCTION SET,
LIGHTING/RCP'S, PLANS,ELEVATIONS
17 09/07/18 REVISED A-124, A-601, A-607
10/09/18 MULTIPLE REVISED SHEETS18
12/21/18 MULTIPLE REVISED SHEETS19
BUILDING SECTIONS
A-304
130
F
CC
E E E E E E E E
CC CC CC CC
ENTRY
VESTIBULE
BUILDING SECTION
Scale: 1/8" = 1'-0"1
ATRIUM
NEW SLAB ON GRADE
- SEE STRUCT.
BUILDING SECTION (EXTERIOR OF EAST WING))
Scale: 1/8" = 1'-0"2
8'
P4 P4P4
P4 P48'P4 P48'P48'P48'P48'
P.3P.3
SUPPLY DUCT
SUPPLY DUCT
BASEMENT - T.O. SLAB
90'-10 1/2"
FIRST FL - T.O. FINISH
100'-0"
SECOND FL - T.O. FINISH
111'-11 3/8"
ADD. ROOF - T.O. SLAB
123'-8 1/8"
3RD FL - T.O. FINISH
123'-0 3/8"
ROOF DECK
124'-8 3/8"
BASEMENT - T.O. SLAB
90'-10 1/2"
FIRST FL - T.O. FINISH
100'-0"
SECOND FL - T.O. FINISH
111'-11 3/8"
ADD. ROOF - T.O. SLAB
123'-8 1/8"
3RD FL - T.O. FINISH
123'-0 3/8"
ROOF DECK
124'-8 3/8"
OPEN TO
EAST
WING
OPEN TO
EAST
WING
OPEN TO
EAST
WING
OPEN TO
EAST
WING
OPEN TO
EAST
WING
OPEN TO
EAST
WINGOPEN TO
EAST
WING
OPEN TO
EAST
WING
OPEN TO
EAST
WING
OPEN TO
EAST
WING
OPEN TOEAST
WING
OPEN TOEAST
WING
OPEN TO
EAST
WING
OPEN TO
EAST
WING
NEW SLAB ON GRADE
- SEE STRUCT.
ATRIUM
REINSTALL WINDOW
TRIM, SAVE WINDOWS
FOR LATER USE
8'
P4P4 P4
P4P4 8'P4P48'P4 8'P4 8'P4 8'
P.3 P.3
SUPPLY DUCT
SUPPLY DUCT
EXISTING ROOF HATCH
NEW SAFETY RAILING
NEW ROOF ENCLOSURE
FOR NEW DUCTWORK
NEW LADDER FOR ROOF ACCESS
NEW ROOF TOP UNIT
ON NEW CURB
SERVER ROOM
OPEN OFFICES
GYM
AHU
GYM
16' LIGHT FIXTURE
16' LIGHT FIXTURE
16' LIGHT FIXTURE
SERVER ROOM
OPEN OFFICES
GYM
16' LIGHT FIXTURE
16' LIGHT FIXTURE
16' LIGHT FIXTURE
A C D E HB.5 E.5 G JB
11'-0"4'-9"6'-3"11'-0"11'-0"6'-1"11'-11 1/8"9'-0 1/4"7'-8 1/4"
A AAAA AAAA
ENTRYVESTIBULE
ENTRY
VESTIBULE
ACDEHB.5E.5GJ B
7'-8 1/4"9'-0 1/4"11'-11 1/8"6'-1"11'-0"11'-0"6'-3"4'-9"11'-0"
WEST
WING
130
D
D
128
101102
127
126
103
BRICK
119
111
115 113
118
112
114 117
116
124
108
121
110
109
131
125
120
134
105
107
8x10.58x16
D
D
D
D
E EEEEEEE
26x12
15x1018x10
22x12
16x1018x10
26x12
15x1018x10
26x12
15x1018x10
BRICK
122
123
SINK
48x16RET, 2ND
35x162ND
SPRINKLERRISER
35x162ND
8x16CONF
STEEL "V" BRACE
wall
REFRIGERATOR
REFRIGERA
T
O
R
STOVE
ELKAY SS SINKWITHIN INTEGRAL
SS COUNTER TOP
FROM ELKAY
DW
COFFEE MACHINE
WOOD COUNTE
R
DW
ELKAY SS SINKWITHIN CUSTOM
WOOD COUNTER
133
132
ICEMAKER
OVEN
MICRO
OVEN
MICRO
EXIS
T
I
N
G
TRAN
S
F
O
R
M
E
R
EXISTING
TRANS
F
O
R
M
E
R
6'-0" x 5'-0"DOCKLEVELLER
NEW CONCRETELOADING DOCK
6'-8"x7'-5
"
x
6
'
-
1
0
"
DUMPST
E
R30"x30"
SIDE DOOR
135
BOT
T
L
E
FILL
E
R
KEY PLAN
3/A303
EAST
WING
SOUTH
WING
ADDITION
WING
1/A305
2/A305
1/A304
2/A304
4/A303
3/A303
1/A304
4/A303
2/A304
Te
x
t