Loading...
31A-035 community enterprises code review rev 3 april 2017Jody Barker, A.I.A. | Architecture + Design, LLC 32 Willow Street Florence, MA 01062 cell: 617.216.5988jodybarker.aia@gmail.com CODE REVIEW March 29, 2017 Community Enterprises, Inc.rev. April 3, 2017 5 Franklin Street Northampton, MA Applicable Building Code: MA 780 CMR Eighth Addition IBC, IEBC International EXISTING Building Code, 2009 PROPOSED RENOVATIONS: PROJECT DESCRIPTION: •Renovation of an existing office building for the use of Community Enterprises, Inc. for their main office. Existing open office space will be modified to create smaller offices on the basement and 2nd floors of the structure. A new conference room and break room will be built on the basement level. Use Groups 310 •Existing uses – Group B, Business •New use – Group B, Business •There is no change of use group proposed for this project. Construction Type •3B: The building is constructed with concrete block masonry bearing walls. The floor structure is a concrete deck supported with steel trusses. Interior partitions are a mix of concrete block walls and metal stud framed walls with sheet rock finish. The building roof is wood framed. The north stair is wood framed. Sprinkler System •No sprinkler systems exist in the building. No new systems are proposed. Fire and Smoke Alarm & Detection •A manual fire alarm system and an automatic smoke detection system will be installed throughout the building. •An independent Fire Alarm Vendor will supply the final alarm plans and device specifications. According to the IEBC this renovation is being reviewed as: Compliance with Chapter 6- Alterations Level 1 and Chapter 7- Alterations Level 2. •Level 1 changes – new finishes throughout. •Level 2 changes – reconfiguration of open office spaces at the basement and 2nd floor to create private office space. 1 of 4 Jody Barker, A.I.A. | Architecture + Design, LLC 32 Willow Street Florence, MA 01062 cell: 617.216.5988jodybarker.aia@gmail.com Fire Resistive Required Types of Construction, Table 601 IBC Building Element Type 3B Primary Structural Frame 0 Bearing walls, Exterior 2 Bearing walls, Interior 0 Nonbearing walls and partitions, exterior 0 Nonbearing walls and partitions, interior 0 Floor construction and secondary members 0 Roof construction and secondary members 0 Building area calculations The existing building has three (3) floors – basement, 1st floor, and 2nd floor. There is an existing, accessible elevator lobby level ½ floor down from the 1st floor. This space is included as part of the 1st floor for this review. Area Basement – 2,344 SF Area 1st floor including elevator lobby – 2,390 SF Area 2nd floor – 2,308 SF Total area – 7,042 SF Level 1 work requirements: 602.1 Interior finishes: All newly installed wall and ceiling finishes shall comply with the IBC 603 Fire Protection: Alterations shall be done in a manner that maintains the level of fire protection provided. 604 Means of Egress: Repairs shall be made in a manner that maintains the level of protection provided for the means of egress 606 Structural: No structural changes are included in this project. 607 Energy Conservation: See 711 below Level 2 work requirements: 701.3 Compliance Windows may be added without the light and ventilation requirements of the IBC New electrical equipment must comply with section 708 Length of dead end corridors, comply with 705.6 Minimum ceiling height of newly created habitable and occupied spaces shall be 7 feet. 2 of 4 Jody Barker, A.I.A. | Architecture + Design, LLC 32 Willow Street Florence, MA 01062 cell: 617.216.5988jodybarker.aia@gmail.com OCCUPANCY Occupant Load Calculation (1004.4.1) See attached spreadsheet B use “Business” use max occupant load Total Area 7,042 SF 100 gross 70 Total 70 Toilets Required Required fixture per sex Required Lavatory Number of occupants Total Women 1 per 20 1 per 50 35 2 fixture 1 lav Men 1 per 25 1 per 50 35 2 fixture 1 •There are two (2) existing, accessible restrooms on the 1st and 2nd floors. There is one (1) existing shower room on the basement level which will remain. •Restroom count – 5 total (2 men, 2 women, 1 existing shower room). 4 are accessible. •MA CMR 248 - No plumbing work or improvements are proposed as part of the renovations. No additional work will be required. 704 Fire Protection: 704.2, 912.2.1 Automatic sprinkler systems Automatic sprinkler systems are not required in this project because of the exceptions in 704.2.2 The following conditions are present: The B use area is less than 12,000 square feet (IEBC) The B use area is less than 7,500 square feet (MA General Law Ch. 148, section 26G) 705 Means of Egress Each floor has two (2) means of egress to grade which will be maintained. 705.4.4 Panic Hardware In level 2 work areas, Panic hardware is only required for A uses with occupancies over 100. 705.7 Means of Egress lighting All means of egress shall have compliant egress lighting. 705.7 Exit Signs All means of egress shall have compliant exit signs. 705.9 Guards All stairs, landings, and balconies that are more than 30 inches above the adjacent grade, shall have compliant guards. 709.2 Mechanical, Altered existing systems. 3 of 4 Jody Barker, A.I.A. | Architecture + Design, LLC 32 Willow Street Florence, MA 01062 cell: 617.216.5988jodybarker.aia@gmail.com The following requirements will be met: In mechanically ventilated spaces, existing mechanical ventilation systems that are altered, reconfigured, or extended shall provide no less than 5 cfm per person of outdoor air and not less than 15cfm of ventilation air per person. The renovations are designed to work with the existing HVAC layout and distribution. 711 and 607 Energy Conservation: Level 1 and 2 alterations are permitted without requiring the entire building to comply with the International Energy Conservation Code. Alterations (new construction) shall comply with the International Energy Conservation Code. A building that undergoes Level 2 alterations is required to meet a certain level of energy compliance. Where there are reconfigurations of the space or new doors or windows, any such new element is required to meet the International Energy Conservation Code. Elements within the building that are not being affected do not heed to be evaluated and do not need to comply with the energy provisions. Essentially the entire building is not required to meet the energy provisions; only a degree of possible improvement in the energy performance of the building is intended to be achieved by making the new elements meet the IECC. In certain cases where the reconfiguration of the space might have resulted in the creation of new spaces the newly created space should be evaluated as a whole for compliance with the energy provisions even though some of the element within the space might actually not have been altered. Likewise, in a case where an existing mechanical system is being extended to other areas or new duct work is being installed to reconfigure and reroute the ducts to various spaces, it is only required to have the new elements meet the energy provisions and not the entire system. Any new replacement windows will have a maximum U value of 0.4 Any new entrance doors will have a maximum U value of 0.8 All existing ceilings, walls or floor cavities of the building envelope exposed or accessible during construction will be filled with insulation that meets or exceeds an R-value of R-3.5 per inch. The roof will not be altered in this project 806 Accessibility CMR 521 The existing structure is accessible. There is an operational elevator in the building which accesses all three floors as well as an at grade lobby. Accessible restrooms are existing at the office floor levels - 1st and 2nd floor. Existing corridors have accessible clearances. New corridors, partitions, and doors will be constructed with the correct clearances. End of Document 4 of 4