Loading...
SM Minutes 9.13.07No. SM011 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 Smith College Co-Gen LOCATION:Smith College Conf. Rm PROJECT TITLE:September 13, 2007 SUBJECT:Subcontractor Status Meeting MEETING DATE: DID ATTEND ATTENDEE NAME COMPANY NAME DISTRIBUTION METHOD Y Darren Bentley Abington Group ABINGTO DB Y Don Leavitt, Jr.Abington Group ABINGTO DL Y Sean Bent Abington Group ABINGTO SB Y Barry Higgins Collins Electric COLLINS BH Y Herm Hageman Collins Electric COLLINS HH Y Karl McElwey MJ Moran Mechanical Contractors MJM KM Y Fran Raymond Smith College SC FR Y Gary Hartwell Smith College SC GH Y David Perkins The Pike Company, Inc.PIKE DP Y David M. Crudo The Pike Company, Inc.PIKE DMC ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE National Grid 00001 A. National Grid (NG) switch will arrive in early September, there is a 3 week lead time to dig. NG stated they would invoice the college and the funds must be in place in order to proceed. B. Coordination is needed for when the change over will occur. Plant to run on generator? SC GHOLD05/17/07 Abington 00002 A. Mason to start Monday, assist in locating door frames. B. Beam over oil pump needs to be grouted, start Monday. C. Duct bank is formed, pour 9-13. D. Installing HRSG support steel, completed by next week. Collins to start after. E. Columns have been abated by Abide. F. Welding frames for doors coming in on Monday. G. Cleaning process to be established by Boilers 4 & 5, dust partition where the HRSG is? PIKE DPOPN Page 1 of 3Form 22f No. SM011 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE MJ Moran - Piping, Misc. 00003 A. Once beam over oil pump is complete, MJM to complete their piping work. B. Cap the gas line, meter installed, gas is off and will be restored today. C. Crane will be on-site Monday for IB's use, Kleeburg on-site next week to do misc. work? D. Need breeching from IB by the 17th, 5 days +/- to install. E. vZ added 5 test ports to the breeching, cost impact? F. Ryback drawings are moving forward, to be out on Monday. G. Duffy to back-fill this weekend. PIKE DPOPN Collins - Electric 00004 A. Cover hole for the duct bank when work is completed for the day to avoid erosion. B. Need fire alarm narrative and sketch. (OLD) C. Need vz/ fire dept. to walk through to determine lighting / strobes, pull stations, heat detectors, etc....System to be restored to original condition? (OLD) D. Need ABLE control panel ASAP, on site next week? (OLD) E. Should take approx. a month to wire the controls. F. Piping is completed for trench work, cable pulled after Abingtons pour. G. Factory test on Russ Electric gear on 9-19. PIKE DPOPN General 00005 A. HOUSEKEEPING - GENERAL *General cleaning & sweeping needs to improve to mitigate dust buildup. *Set up dust partitions, look into bird screens to avoid / control the pigeon poulation. B. Cat walks - College to decide on design and access. (OLD) C. Smith / Pike to review instrumentation - control issues. Need O&M manuals from ABLE. D. Get flashing detail from Morris roofing. Gary to give Pike roofing quote from Morris. OPN Page 2 of 3Form 22f No. SM011 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 These minutes are intended to be an accurate representation of the discussions held at the indicated meeting. If you note any discrepancies, please notify sender within 24 hours with comments or changes. Otherwise, parties are to proceed accordingly. Prepared By:The Pike Company, Inc. David PerkinsSigned:Dated:17-Sep-07 Expedition Page 3 of 3Form 22f