SM Minutes 8.16.07No. SM009 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 Smith College Co-Gen LOCATION:Smith College Conf. Rm PROJECT TITLE:August 16, 2007 SUBJECT:Subcontractor Status Meeting MEETING DATE: DID ATTEND ATTENDEE NAME COMPANY NAME DISTRIBUTION METHOD Y Bill Orr Abington Group ABINGTO BO Y Bob Bent Abington Group ABINGTO BB Y Darren Bentley Abington Group ABINGTO DB Y Don Leavitt, Jr.Abington Group ABINGTO DL Y Sean Bent Abington Group ABINGTO SB Y Barry Higgins Collins Electric COLLINS BH Y Herm Hageman Collins Electric COLLINS HH Y Fran Raymond Smith College SC FR Y Gary Hartwell Smith College SC GH Y David Perkins The Pike Company, Inc.PIKE DP ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE National Grid 00001 A. National Grid (NG) switch will arrive in early September, there is a 3 week lead time to dig. NG stated they would invoice the college and the funds must be in place in order to proceed. B. Coordination is needed for when the change over will occur. Plant to run on generator? SC GHOLD05/17/07 Abington - Civil 00002 A. Grouting haunches for roof curb steel connections. B. Basement stairs completed. C. Abington to remove lube oile cooler for Solar to pick up for repair? D. Marking out elevations and connection points for HRSG steel. Need to move electrical conduit, drains, etc. for the installation. E. Form and pour trench thats available. F. Ground floor rooms (electrical) using block, operating floor sheetrock with 6" block curb. Direction to follow. G. Solar needs to come to site to check out alignment before bolt up. H. Working on Bay 1 Solar steel, and penthouse roof weather protection. I. Will need to move the operators catwalk for access to install steel (1/2 day). PIKE DPOPN Page 1 of 3Form 22f No. SM009 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE MJ Moran - Piping, Misc. 00003 A. Duffy to back-fill and saw-cut the next trench. B. Able to coordinate sketches for the controls with MJM. Able to be on-site Tu-Fr (14-17). C. Gas piping - contact Bay State. D. Fuel oil piping - put in basement due to HRSG interference, re-work return header. E. Solar duct work - proceeding with ordering materials / fabrication. Waiting on shop drawings. Schedule installation when the crane is here. Coordinate w / Pike. F. Need sizes and lengths for the Solar ducts (completion date?) G. Panels for VFD will be in next week. PIKE DPOLD Collins - Electric 00004 A. Continue with underground / trench work. Pulling cable once the trench work is complete. B. Need fire alarm narrative and sketch. C. Need vz/ fire dept. to walk through to determine lighting / strobes, pull stations, heat detectors, etc....System to be restored to original condition? D. Conference call between Solar and Russelectric to answer RE questions went as planned last week. E. Collins and Square D to meet to review bill of materials regarding protective relays. F. Waiting on ABLE panel for boiler 3. PIKE DPOPN Page 2 of 3Form 22f No. SM009 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE General 00005 A. Need fab drawings from MJM for re-submittal for package boiler breaching. Conditional OK was given to order materials. B. Solar rep to come to site to check / verify installation package. C. Cat walks - College to decide on design and access. D. Smith / Pike to review instrumentation - control issues. Need O&M manuals from ABLE. E. Smith confirmed that Tony Patillo viewed pictures of the basement stairs and gave his approval on the installation. F. Get flashing detail from Morris roofing. G. MJM priced direct to Smith the moving of all FO lines to the basement. H. Smith recv'd verbal re-quote of the reduced scope handrail, Gary to review with Pike before making a decision. I. A commissioning meeting is requested ASAP to discuss cost, procedures, scope, etc. Pike to contact vZ to set up a meeting. OPN These minutes are intended to be an accurate representation of the discussions held at the indicated meeting. If you note any discrepancies, please notify sender within 24 hours with comments or changes. Otherwise, parties are to proceed accordingly. Prepared By:The Pike Company, Inc. David PerkinsSigned:Dated:21-Aug-07 Expedition Page 3 of 3Form 22f