SM Minutes 6.14.07No. SM004 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 Smith College Co-Gen LOCATION:Smith College Conf. Rm June 14, 2007 SUBJECT:Subcontractor Status Meeting MEETING DATE:PROJECT TITLE: DID ATTEND ATTENDEE NAME COMPANY NAME DISTRIBUTION METHOD Y Bill Orr Abington Group ABINGTO BO Y Darren Bentley Abington Group ABINGTO DB Y Don Leavitt, Jr.Abington Group ABINGTO DL Y Sean Bent Abington Group ABINGTO SB Y Barry Higgins Collins Electric COLLINS BH Y Herm Hageman Collins Electric COLLINS HH Y Jeff Bean MJ Moran Mechanical Contractors MJM JB Y Gary Hartwell Smith College SC GH Y David Perkins The Pike Company, Inc.PIKE DP Y David M. Crudo The Pike Company, Inc.PIKE DMC Y David J. Chiovoloni vanZelm Engineers VZ DC ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE National Grid 00001 A. National Grid (NG) switch will arrive in early September, there is a 3 week lead time to dig. NG stated they would invoice the college and the funds must be in place in order to proceed. B. Property lines - Smith College (SC) to give NG a copy of the easement / deed. C. Coordination is needed for when the change over will occur. Plant to run on generator? D. NG will do all grounding around the switch. SC GHOLD05/17/07 Abington - Civil 00002 A. Working on roof curb / ducts, +/- 3weeks to pour the curb. B. Catwalks cut out, handrails to be placed on the East side. C. R. Goulet inventoried all the code piping. All pipes and welding 50% done, to be completed by the 25th. D. Control room design - SC working with vZ on changes, when can Abington start? E. Waiting for response from Rentech regarding code piping. PIKE DPOPN Page 1 of 3Form 22f No. SM004 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE MJ Moran - Piping, Misc. 00003 A. No burner stand on Rentech, want to start on gas train. B. Curbs for the hatch to be done after the turbine and boiler are in place. C. Summer Boiler complete and operational, MJM to forward costs to Pike. D. Contact Able re. 12" and 6" orfice flanges. E. Waiting for approval of submittal on unit heater and neptune mixing tank. F. Gas Compressor skid storage - will be in by Friday 6-15, Pike to coordinate with MJM. G. Measuring Solar duct today, will work on submittals. (package boiler breeching as well). H. Fire protection shutdown Friday 6-15. Eliminate 3 heads (1 over boiler 4&5, 1 over Bay 3). I. Need an isolation valve between HRSG and package boiler blowdown lines. PIKE DPOPN Collins - Electric 00004 A. Collins requested a list of all items they need to submit on. B. Collins to cordinate fire alarm going off-line. C. Reccomended that the conduits on West St. be replaced. Put two conduits in the steam tunnel to avoid excavation. D. Completed work on Summer Boiler. E. All submittals are in, request a disk of auto cad files for electrical as-builts. F. Need vz/ fire dept. to walk through to determine lighting / strobes, pull stations, heat detectors, etc.... PIKE DPOPN Page 2 of 3Form 22f No. SM004 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE General 00005 A. Added scope to arch / doors - electrical fire stop. Fire panel has to move. B. HRSG - 3 components being delivered in mid-July. Pike to coordinate and find out when the remaining peices will be shipped. C. Roof opening for Bay 1 over the HRSG scheduled for the end of June, beginning of July. D. SAFETY - OH work, please secure work areas to avoid falling debris and clean up after the work is completed to avoid loose concrete pieces in the catwalks, etc.. OPN These minutes are intended to be an accurate representation of the discussions held at the indicated meeting. If you note any discrepancies, please notify sender within 24 hours with comments or changes. Otherwise, parties are to proceed accordingly. Prepared By:The Pike Company, Inc. David PerkinsSigned:Dated:18-Jun-07 Expedition â Page 3 of 3Form 22f