SM Minutes 4.10.08No. SM036 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 Smith College Co-GenPROJECT TITLE: SUBJECT:Subcontractor Status Meeting LOCATION:Smith College Conf. Rm April 10, 2008MEETING DATE: MEETING TIME:9:00AM DID ATTEND ATTENDEE NAME COMPANY NAME DISTRIBUTION METHOD Y Herm Hageman Collins Electric COLLINS HH Y Jeff Bean MJ Moran Mechanical Contractors MJM JB Y Fran Raymond Smith College SC FR Y Gary Hartwell Smith College SC GH Y John Robinson Smith College SC JR Y David Perkins The Pike Company, Inc.PIKE DP ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE MJ Moran - Piping, Misc. 00001 A. *Pike / MJM need location from vanZelm for the opacity monitor (OLD). Eastmont came to site but did not take measurements, van Zelm needs to follow up. B. Fire protection - Needs to be pressure tested, complete in two weeks. C. There are issues with the globe valve operation on the muffler for the steam header. D. X-rays are complete, MJM to apply markers to identify pipe. E. MJ Moran submitted pricing for kick plates around the Solar ducts. Smith to review (OLD). F. Opacity Monitor - OK to re-drill the flanges that are there (RECORD). Work to be completed after the air blows are finished. G. Ammonia fill station - Completed, Smith getting prices for service. H. Air blows for gas need to be completed by the 8th of April. I. The safety shower and eye wash stations are installed. PIKE DPOPN Page 1 of 3Form 22f No. SM036 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE Collins - Electric 00002 A. Fire alarm - Collins has submitted price to Smith College direct. Gary working on getting funding for the work. Being installed as a zone system. Smith / Collins coordination. Simplex submitted price to Smith for review (RECORD). B. Man-hole work on-going, Collins to bill direct to the college (RECORD). There is a possibility of a shutdown that needs to be coordinated with the college and power company. Collins / Smith coordination. Asbestos has been removed. C. The battery chargers and racks were installed per vZ RFI response. They are in direct contact with the sun and Smith would like exterior window cover (OLD). Smith / Collins looking at sun sheild procurement (OLD). Ray W. working on shield. D. AET will do all hi-pot testing and Sneet will complete the remainder of the testing work. Start in mid-April, Herm to follow up with dates. Sneet wants to remove relays and test at their shop. E. Need a control diagram from Toromont / Able. There are no coordination drawings for controls on the gas skid. RFI's were sent to ABLE and some minor issues still need to be worked on. F. Need O&M's from Russ Electric ASAP. Pike to follow up with Collins / Russ Electric (OLD). G. Concern was brought up regarding heat trace and lighting by the ammonia tank and gas compressor. vanZelm to look into and follow up on suggestions. PIKE DPOPN General 00003 A. Smith / Pike to review instrumentation - control issues. Need O&M manuals from ABLE. (OLD) Manuals will be coming with the SCADA system. B. Smith / vanZelm to review remote boiler level indicators for the control room (all boilers) (OLD). Pike to discuss with ABLE about pricing out alternatives (OLD). C. Remaining boil-out activities are complete, boiler inspector on-site 4-11. D. First fire date - 18th to 20th of April. E. Ammonia tank containment sump pump to be reviewed by vanZelm - Design intent was a temporary sump pump. F. PLANT CLEAN-UP - SMITH IS HAVING THEIR ANNUAL DIGNITARY GATHERING, WHICH INCLUDES A TOUR OF THE CO-GEN PLANT. PLANT NEEDS TO BE AS CLEAN AS POSSIBLE. SMITH TO LOOK INTO CLEANING CREW? OPN Page 2 of 3Form 22f No. SM036 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 These minutes are intended to be an accurate representation of the discussions held at the indicated meeting. If you note any discrepancies, please notify sender within 24 hours with comments or changes. Otherwise, parties are to proceed accordingly. Prepared By:The Pike Company, Inc. David PerkinsSigned:Dated:15-Apr-08 Expedition Page 3 of 3Form 22f