SM Minutes 3.6.08No. SM032 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 Smith College Co-GenPROJECT TITLE: SUBJECT:Subcontractor Status Meeting LOCATION:Smith College Conf. Rm March 06, 2008MEETING DATE: MEETING TIME:9:00AM DID ATTEND ATTENDEE NAME COMPANY NAME DISTRIBUTION METHOD Y Barry Higgins Collins Electric COLLINS BH Y Herm Hageman Collins Electric COLLINS HH Y Jeff Bean MJ Moran Mechanical Contractors MJM JB Y Gary Hartwell Smith College SC GH Y John Robinson Smith College SC JR Y David Perkins The Pike Company, Inc.PIKE DP Y Mike Mackey vanZelm Engineers VZ MM ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE Abington 00001 A. Working on punch list items and clean-up, preparing for demobilization. All punch list items to be reviewed by AGI, Pike, and Smith / vZ (OLD). B. Crane on site 2-28 putting catalyst through roof and removing misc. debris from roof. Two of the four catalysts were damaged, waiting on assessment (OLD). PIKE DPOPN MJ Moran - Piping, Misc. 00002 A. *Pike / MJM need location from vanZelm for the opacity monitor (OLD). Eastmont to take measurements after CTI visit (OLD). B. Fire protection - Main(s) are installed and run in the basement. Need plant shutdown for final tie-in, end of May. C. Per Jeff Bean, muffler for the steam header will be delivered on Friday the 14th of March, expected on-site no later than the 17th. Pike to schedule CTI to complete boil-out. Muffler to be rigged in place vs. crane. D. X-rays were completed from gas compressor to turbine, remainder being complete late next week. MJ Moran to follow with paperwork and weld map. E. MJ Moran pricing kick plates around the Solar ducts. PIKE DPOPN Page 1 of 3Form 22f No. SM032 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE Collins - Electric 00003 A. Fire alarm - Collins has submitted price to Smith College direct. Gary working on getting funding for the work. Being installed as a zone system. Smith / Collins coordination. Simplex to price their portion to Smith. B. Man-hole work on-going, Collins to bill direct to the college. There is a possibility of a shutdown that needs to be coordinated with the college and power company. Collins / Smith coordination. Asbestos being removed today (3.6). C. The battery chargers and racks were installed per vZ RFI response. They are in direct contact with the sun and Smith would like exterior window cover (OLD). Smith / Collins looking at sun sheild procurement. D. AET will do all hi-pot testing and Sneet will complete the remainder of the testing work. E. Need a control diagram from Toromont / Able. There are no coordination drawings for controls on the gas skid. ABLE will be on-site 2-29 to review this with Collins (OLD). F. Schedule a shutdown to switch phase rotation in the W/SW end of the physical plant. Possible to do on Friday's or during spring break. G. Need Smith to give directive on control room layout (i.e monitors, level indicators, etc) PIKE DPOPN General 00004 A. Smith / Pike to review instrumentation - control issues. Need O&M manuals from ABLE. (OLD) B. Smith / vanZelm to review boiler remote level indicators for the control room (all boilers) (OLD). C. RFI was sent to vanZelm regarding the electrical room fireproofing and what needs to be 2 hr. rated. Pike contends that the drawings only show columns and beams requiring a 2 hour rating. No spec was provided for this work and the drawings do not clearly state what needs a 2 hr. rating (OLD). To be reviewed between Pike / Smith / vZ. D. Data sheet needed from mason regarding fire rating for block used. Pike to fwd to Smith / vZ. E. COT will be on-site March 4th to do a preliminary walk-through for the oil flush. Work to begin the 17th of March. OPN Page 2 of 3Form 22f No. SM032 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 These minutes are intended to be an accurate representation of the discussions held at the indicated meeting. If you note any discrepancies, please notify sender within 24 hours with comments or changes. Otherwise, parties are to proceed accordingly. Prepared By:The Pike Company, Inc. David PerkinsSigned:Dated:11-Mar-08 Expedition Page 3 of 3Form 22f