Loading...
SM Minutes 3.20.08No. SM034 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 Smith College Co-GenPROJECT TITLE: SUBJECT:Subcontractor Status Meeting LOCATION:Smith College Conf. Rm March 20, 2008MEETING DATE: MEETING TIME:9:00AM DID ATTEND ATTENDEE NAME COMPANY NAME DISTRIBUTION METHOD Y Herm Hageman Collins Electric COLLINS HH Y Jeff Bean MJ Moran Mechanical Contractors MJM JB Y Bob Lesko Smith College SC BL Y Fran Raymond Smith College SC FR Y Gary Hartwell Smith College SC GH Y John Robinson Smith College SC JR Y David Perkins The Pike Company, Inc.PIKE DP Y David M. Crudo The Pike Company, Inc.PIKE DMC Y Mike Mackey vanZelm Engineers VZ MM ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE Abington 00001 A. Punch-list final sign off needs to be completed. B. Crane on site 2-28 putting catalyst through roof and removing misc. debris from roof. Two of the four catalysts were damaged, waiting on assessment (OLD). C. Two men on-site next week to align the turbine. PIKE DPOPN MJ Moran - Piping, Misc. 00002 A. *Pike / MJM need location from vanZelm for the opacity monitor (OLD). Eastmont to take measurements after CTI visit (OLD). B. Fire protection - Basement mains and branch line are complete, need Witch to core drill. C. Per Jeff Bean, muffler for the steam header will be delivered on Friday the 14th of March, expected on-site no later than the 17th. Pike to schedule CTI to complete boil-out. Muffler to be rigged in place vs. crane. ONE WEEK DELAY - On-site by the 24th, installed by the 26th. CTI will be on-site the 27th of March. D. Trying to complete X-rays on the gas lines today, 3-20. MJ Moran to follow with paperwork and weld map. E. MJ Moran submitted pricing for kick plates around the Solar ducts. Smith to review (OLD). F. Opacity Monitor - OK to re-drill the flanges that are there (RECORD). G. Ammonia fill station - Need to complete air tests on supply and return lines. Need to look at prices for ammonia suppliers. PIKE DPOPN Page 1 of 3Form 22f No. SM034 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE Collins - Electric 00003 A. Fire alarm - Collins has submitted price to Smith College direct. Gary working on getting funding for the work. Being installed as a zone system. Smith / Collins coordination. Simplex submitted price to Smith for review (RECORD). B. Man-hole work on-going, Collins to bill direct to the college (RECORD). There is a possibility of a shutdown that needs to be coordinated with the college and power company. Collins / Smith coordination. Asbestos has been removed. C. The battery chargers and racks were installed per vZ RFI response. They are in direct contact with the sun and Smith would like exterior window cover (OLD). Smith / Collins looking at sun sheild procurement (OLD). D. AET will do all hi-pot testing and Sneet will complete the remainder of the testing work. Start the first week of April? Herm to follow up. E. Need a control diagram from Toromont / Able. There are no coordination drawings for controls on the gas skid. ABLE will be on-site 2-29 to review this with Collins (OLD). RFI's were sent to ABLE on the 29th of Feb. and have not been responded to. ABLE working on RFI responses with vanZelm. F. Shutdown is scheduled for Tuesday March 25th to switch phase rotation in the W/SW end of the physical plant. G. Need Smith to give directive on control room layout (i.e monitors, level indicators, etc) (OLD) H. Need O&M's from Russ Electric ASAP. Pike to follow up with Collins / Russ Electric. PIKE DPOPN Page 2 of 3Form 22f No. SM034 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE General 00004 A. Smith / Pike to review instrumentation - control issues. Need O&M manuals from ABLE. (OLD) Manuals will be coming with the SCADA system. B. Smith / vanZelm to review remote boiler level indicators for the control room (all boilers) (OLD). Pike to discuss with ABLE about pricing out alternatives. C. Fireproofing - Pike was given direction by vZ / Smith to stay inside the electrical room and were not required to spray beams or columns outside the room. Start Friday 3-21, complete by 3-27. D. Remaining boil-out activities to start the 31st of March. E. First fire date - 18th to 20th of April. F. Schedule was submitted and reviewed during the meeting, Pike to fwd critical path schedule to Smith. G. Ammonia tank containment sump pump to be reviewed by vanZelm. OPN These minutes are intended to be an accurate representation of the discussions held at the indicated meeting. If you note any discrepancies, please notify sender within 24 hours with comments or changes. Otherwise, parties are to proceed accordingly. Prepared By:The Pike Company, Inc. David PerkinsSigned:Dated:24-Mar-08 Expedition Page 3 of 3Form 22f