SM Minutes 3.13.08No. SM033 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 Smith College Co-GenPROJECT TITLE: SUBJECT:Subcontractor Status Meeting LOCATION:Smith College Conf. Rm March 13, 2008MEETING DATE: MEETING TIME:9:00AM DID ATTEND ATTENDEE NAME COMPANY NAME DISTRIBUTION METHOD Y Herm Hageman Collins Electric COLLINS HH Y Jeff Bean MJ Moran Mechanical Contractors MJM JB Y Fran Raymond Smith College SC FR Y Gary Hartwell Smith College SC GH Y John Robinson Smith College SC JR Y David Perkins The Pike Company, Inc.PIKE DP Y David M. Crudo The Pike Company, Inc.PIKE DMC Y Craig W. Parker, P.E vanZelm Engineers VZ CP Y Mike Mackey vanZelm Engineers VZ MM ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE Abington 00001 A. Working on punch list items and clean-up, preparing for demobilization. All punch list items to be reviewed by AGI, Pike, and Smith / vZ (OLD). AGI has completed items on the punch list that Smith needs to review and sign off on. B. Crane on site 2-28 putting catalyst through roof and removing misc. debris from roof. Two of the four catalysts were damaged, waiting on assessment (OLD). PIKE DPOPN MJ Moran - Piping, Misc. 00002 A. *Pike / MJM need location from vanZelm for the opacity monitor (OLD). Eastmont to take measurements after CTI visit (OLD). B. Fire protection - Main(s) are installed and run in the basement. Need plant shutdown for final tie-in, end of May. C. Per Jeff Bean, muffler for the steam header will be delivered on Friday the 14th of March, expected on-site no later than the 17th. Pike to schedule CTI to complete boil-out. Muffler to be rigged in place vs. crane. CTI will be on-site the 27th of March. D. X-rays were completed from gas compressor to turbine, remainder being scheduled by MJ Moran. MJ Moran to follow with paperwork and weld map. E. MJ Moran submitted pricing for kick plates around the Solar ducts. Smith to review. F. Opacity Monitor - Cut the flange and rotate it. G. Ammonia fill station pad poured today, installation afterwards. Need to look at prices for ammonia suppliers. PIKE DPOPN Page 1 of 3Form 22f No. SM033 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE Collins - Electric 00003 A. Fire alarm - Collins has submitted price to Smith College direct. Gary working on getting funding for the work. Being installed as a zone system. Smith / Collins coordination. Simplex submitted price to Smith for review. B. Man-hole work on-going, Collins to bill direct to the college. There is a possibility of a shutdown that needs to be coordinated with the college and power company. Collins / Smith coordination. Asbestos has been removed. C. The battery chargers and racks were installed per vZ RFI response. They are in direct contact with the sun and Smith would like exterior window cover (OLD). Smith / Collins looking at sun sheild procurement (OLD). D. AET will do all hi-pot testing and Sneet will complete the remainder of the testing work. E. Need a control diagram from Toromont / Able. There are no coordination drawings for controls on the gas skid. ABLE will be on-site 2-29 to review this with Collins (OLD). RFI's were sent to ABLE on the 29th of Feb. and have not been responded to. Pike to follow up with ABLE. F. Schedule a shutdown to switch phase rotation in the W/SW end of the physical plant. Possible to do on Friday's or during spring break. G. Need Smith to give directive on control room layout (i.e monitors, level indicators, etc) (OLD) H. Need O&M's from Russ Electric ASAP. PIKE DPOPN Page 2 of 3Form 22f No. SM033 MEETING MINUTESThe Pike Company, Inc. 2 Penn Plaza Suite 1500 New York, NY 10121 Phone:(413) 585-2440 Fax:(212) 269-4568 ITEM DESCRIPTION STATUS STARTED BALL IN COURTDUE DATE General 00004 A. Smith / Pike to review instrumentation - control issues. Need O&M manuals from ABLE. (OLD) Manuals will be coming with the SCADA system. B. Smith / vanZelm to review boiler remote level indicators for the control room (all boilers) (OLD). C. Fireproofing - Pike was given direction by vZ / Smith to stay inside the electrical room and were not required to spray beams or columns outside the room. Copies of the bids were given to Smith College to review. D. COT will be on-site for the oil flush the 17th of March, completed by Wednesday. E. Remaining boil-out activities to start the 24th of March. F. Smith to coordinate meeting with the boiler inspector. G. First fire date (by April 30th?) OPN These minutes are intended to be an accurate representation of the discussions held at the indicated meeting. If you note any discrepancies, please notify sender within 24 hours with comments or changes. Otherwise, parties are to proceed accordingly. Prepared By:The Pike Company, Inc. David PerkinsSigned:Dated:17-Mar-08 Expedition Page 3 of 3Form 22f