Loading...
Elevations 2014-06-20ROOF 130' - 0" BASEMENT 92' - 6" FIRST FLOOR 100' - 0" SECOND FLOOR 110' - 0" THIRD FLOOR 119' - 4" 101.1 W6 W6 W6 W3 W3 NEW HALF ROUND 5" GALV STEEL GUTTER WITH HANGERS AND DOWNSPOUTS (NOT SHOWN) THAT MEETS NORTHAMPTON HISTORICAL COMMISSION STANDARDS NEW HALF ROUND 5" GALV STEEL GUTTER WITH HANGERS AND DOWNSPOUTS (NOT SHOWN) THAT MEETS NORTHAMPTON HISTORICAL COMMISSION STANDARDS WOOD FRAMED ACCESSIBLE RAMP WITH COMPOSITE DECKING, WOOD POSTS AND PAINTED DOUBLE METAL PIPE RAIL WOOD FRAMED PORCH WITH COMPOSITE DECKING, PAINTED WOOD RAIL AND COMPOSITE BALUSTRADE, TRIM BOARDS AND LATTICE - MATCH EXISTING PROFILES ROOF 130' - 0" BASEMENT 92' - 6" FIRST FLOOR 100' - 0" SECOND FLOOR 110' - 0" THIRD FLOOR 119' - 4" INFILL EXISTING WINDOW OPENING - MATCH EXPOSURE AND PROFILE - TOOTH IN NEW SIDING W/ EXISTING - PAINT WOOD FRAMED ACCESSIBLE RAMP WITH COMPOSITE DECKING, WOOD POSTS AND PAINTED DOUBLE METAL PIPE RAIL WOOD FRAMED PORCH WITH COMPOSITE DECKING, PAINTED WOOD RAIL AND COMPOSITE BALUSTRADE, TRIM BOARDS AND LATTICE - MATCH EXISTING PROFILES W5 W8 W8 W9 W7 W7 W4W4 W2W2 W10 W2 PATCH EXISITNG ROOF @ FORMER CHIMNEY- SEE STRUCTURAL DWGS - INSTALL PLYWOOD ROOF SHEATHING, AIR BARRIER MEMBRANE AND FIBERGLASS SHINGLES TO MATCH NEW HALF ROUND 5" GALV STEEL GUTTER WITH HANGERS AND DOWNSPOUTS (NOT SHOWN) THAT MEETS NORTHAMPTON HISTORICAL COMMISSION STANDARDS NEW HALF ROUND 5" GALV STEEL GUTTER WITH HANGERS AND DOWNSPOUTS (NOT SHOWN) THAT MEETS NORTHAMPTON HISTORICAL COMMISSION STANDARDS ROOF 130' - 0" BASEMENT 92' - 6" FIRST FLOOR 100' - 0" SECOND FLOOR 110' - 0" THIRD FLOOR 119' - 4" B01.1 W1 W6.1 W6 W3W3W11 6 A602 INFILL OPENING W/ BRICK - PAINT TO MATCH EXISTING BRICK W12 INFILL EXISTING WINDOW OPENING - MATCH EXPOSURE AND PROFILE - TOOTH IN NEW SIDING W/ EXISTING - PAINT NEW HALF ROUND 5" GALV STEEL GUTTER WITH HANGERS AND DOWNSPOUTS (NOT SHOWN) THAT MEETS NORTHAMPTON HISTORICAL COMMISSION STANDARDS NEW HALF ROUND 5" GALV STEEL GUTTER WITH HANGERS AND DOWNSPOUTS (NOT SHOWN) THAT MEETS NORTHAMPTON HISTORICAL COMMISSION STANDARDS SEE GENERAL NOTE #7 (TYP ALL SHUTTERS) ROOF 130' - 0" BASEMENT 92' - 6" FIRST FLOOR 100' - 0" SECOND FLOOR 110' - 0" THIRD FLOOR 119' - 4" W9 W7 W7 W4 W4 W10 W10 W2 W5 W2 34 WOOD FRAMED ACCESSIBLE RAMP WITH COMPOSITE DECKING, WOOD POSTS AND PAINTED DOUBLE METAL PIPE RAIL WOOD FRAMED PORCH WITH COMPOSITE DECKING, PAINTED WOOD RAIL AND COMPOSITE BALUSTRADE, TRIM BOARDS AND LATTICE - MATCH EXISTING PROFILES PATCH EXISITNG ROOF @ FORMER CHIMNEY- SEE STRUCTURAL DWGS - INSTALL PLYWOOD ROOF SHEATHING, AIR BARRIER MEMBRANE AND FIBERGLASS SHINGLES TO MATCH 1. THIS PROJECT IS WITHIN THE ELM STREET HISTORIC DISTRICT IN THE CITY OF NORTHAMPTON. THE NORTHAMPTON HISTORICAL COMMISSION WILL CONDUCT AN EXTERIOR BUILDING DESIGN REVIEW OF PROPOSED IMPROVEMENTS, ADDITIONS AND MODIFICATIONS. 2. REFER TO CIVIL DRAWINGS PREPARED BY THE BERKSHIRE DESIGN GROUP THAT SHOW EXISTING CONDITION, LANDSCAPE REMOVAL, SITE IMPROVEMENTS, LANDSCAPE AND UTILITY PLANS. 3. EXISTING PORCH ROOF STRUCTURE TO BE SHORED PRIOR TO REMOVAL OF FRONT PORCH AND PORCH STRUCTURE. TAKE APPROPRIATE PRECAUTIONS TO MINIMIZE DAMAGE TO EXISTING ROOF, ROOF STRUCTURE, PORCH CEILING AND SURROUNDING ELEMENTS. 4. NEW ACCESSIBLE RAMP IS DESIGNED AND IS TO BE CONSTRUCTED TO MEET THE REQUIREMENTS OF 521 CMR FOR ACCESSIBLE RAMPS INCLUDING SLOPES NO GREATER THAN (1:12) AND HANDRAILS/GUARDRAILS. 5. WHERE EXISTING EXTERIOR WINDOWS ARE REMOVED INFILL WALL CAVITIES WITH NEW WOOD STUDS, EXTERIOR WALL SHEATHING, INSULATION AND VAPOIR BARRIER. INSTALL GYPSUM BOARD PANELS ON INTERIOR SIDE OF WALL. INSTALL AIR BARRIER BELOW NEW WOOD SIDING THAT MATCHES SIZE AND PROFILE OF EXISTING SIDING. TOOTH IN NEW SIDING WITH THE EXISTING. PAINT SIDING TO MATCH HOUSE COLOR. BACK PRIME ALL SIDING PRIOR TO INSTALLATION. 6. SCRAPE AND SAND THE HOUSE, INCLUDING ALL TRIM AND PORCHES, IN PREPARATION FOR PAINTING THE ENTIRE EXTERIOR OF THE HOUSE. APPLY ONE COAT OF PRIMER ON THE ENTIRE HOUSE, INCLUDING TRIM, AND TWO COATS OF FINISH PAINT TO THE ENTIRE HOUSE INCLUDING ALL TRIM. MATCH EXISTING HOUSE BODY AND TRIM COLORS. PAINT COLORS TO BE APPROVED BY ELM STREET HISTORIC DISTRICT. 7. UNFASTEN AND REMOVE ALL EXISTING SHUTTERS. INSPECT ALL SHUTTERS FOR DAMAGE AND REPAIR IF NEEDED. SCRAPE AND SAND ALL SIDES IN PREPARATION FOR PAINTING. INSPECT ALL SHUTTER CONNECTION HARDWARE REPAIR OR REPLACE IF NEEDED. REINSTALL SHUTTERS AFTER HOUSE BODY AND TRIM HAS BEEN PAINTED. 8. REMOVE AND REPLACE WINDOWS AS NOTED ON AD101 & AD102. REMOVE SASHES, SASH CORDS, WEIGHTS AND OTHER MISCELLANEOUS HARDWARE ITEMS. INSULATE ALL WEIGHT POCKETS PRIOR TO INSTALLING NEW WINDOWS. 9. NEW REPLACEMENT WINDOWS ARE TO MEET REQUIREMENTS OF THE ELM STREET HISTORIC DISTRICT DESIGN CRITERIA FOR STYLE AND COLOR. REPLACEMENT WINDOWS ALSO MUST MEET REQUIREMENTS OF SMITH COLLEGE FOR DESIGN, COLOR AND PERFORMANCE. 10. FILL ALL HOLES / VOIDS IN THE FOUNDATION WALLS WITH MASONRY TO PROVIDE FOR A WEATHER TIGHT BUILDING ENVELOPE. REPOINT ALL MORTAR JOINTS IN THE FOUNDATION WALL AS REQUIRED FOR A WEATHER TIGHT FOUNDATION WALL. GENERAL EXTERIOR NOTES c Copyright Cutler Design, Inc. Consultant Address Line 1 Consultant Address Line 2 Consultant Title 43 Harvard Street P.O. Box 15049 Worcester, MA 01615-0049 (508) 757-7500 PHONE (508) 799-2068 FAX www.cutlerassociatesinc.com PROJECT NUMBER: DRAWN: DPM CHECK: SHEET IDENTIFICATION: SHEET TITLE: DESCRIPTIONDATEMARK D e s i g n STAMP: KEY PLAN:6/20/2014 7:02:28 PMC:\Users\soshea\Documents\13067 146 Elm Street_RA2014_soshea.rvtEXTERIOR ELEVATIONS A201 SMITH COLLEGE ISSUED FOR GMP/ PERMIT 13067 SOS MB 06/20/14E ISSUED FOR GMP/PERMIT 04/28/14D HISTORICAL COMM. REVIEW 12/10/13C SCHEMATIC ESTIMATE 11/25/13 PROGRESSB 11/06/13 OWNER PROGRESS REVIEWA RESIDENCE CONVERSION 146 ELM STREET NORTHAMPTON, MA SCALE: 1/8" = 1'-0"1 NORTH ELEVATION SCALE: 1/8" = 1'-0"2 EAST ELEVATION SCALE: 1/8" = 1'-0"3 SOUTH ELEVATION SCALE: 1/8" = 1'-0"4 WEST ELEVATION