fwjordanhousekitchen
scjg_BlackRiverPermitSignature.pdf
scjg_ShepherdPermitSignature.pdf
Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8th edition ofthe
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Kosher Kitchen at Jordan House Date: July 16, 2014 Property Address: Jordan House in the Smith College Quadrangle on Paradise Road, Northampton Massachusetts Project:
Check (x) one or both as applicable: New construction X Existing Construction Project description: Modification of former Kitchen Space into a residential ktichen, dining and auxiliary
spaces to serve the Hillel Community as their Kosher Kitchen and dining area. I Robert J. Figuerido MA Registration Number: 29029 Expiration date: June 30, 2016 ,am a registered design
professional, and I have prepared or directly supervised the preparation ofall design plans, computations and specifications concerningl : Architectural Structural Mechanical
Fire Protection X Electrical X Other: Fire Alarm
for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions ofthe Massachusetts
State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional
services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other
submittals by the contractor in accordance with the requirements ofthe construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality ofthe work and to determine ifthe work is being performed
in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of780
CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official.
Upon completion ofthe work, I shall submit to the building official a 'Final Construction Control Document'. Enter in the space to the right a "wet" or electronic signature and seal:
Phone number: 508.757.7793 Email: bobf@shepherdengineeringinc.com Building Official Use Only Building Official Name: Pennit No.: Date:'
scjg_K&LPermitSignature.pdf
Version 06_11_2013 Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8th edition of
the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Kosher Kitchen at Jordan House Date:July 16, 2014 Property Address: Jordan
House in the Smith College Quadrangle on Paradise Road, Northampton Massachusetts Project: Check (x) one or both as applicable: X New construction X Existing
Construction Project description: Modification of former Kitchen Space into a residential ktichen, dining and auxiliary spaces to serve the Hillel Community as their Kosher Kitchen
and dining area. I Dan Lewis MA Registration Number: 31737 Expiration date: June 30, 2016 , am a registered design professional, and I have prepared or directly supervised the preparation
of all design plans, computations and specifications concerning1: Architectural Structural X Mechanical Fire Protection
Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations
and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and
agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance
to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the
duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this
document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item
3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a ‘Final Construction Control
Document’. Enter in the space to the right a “wet” or electronic signature and seal: Phone number: (603) 352-4841 Email: dan@kohlerandlewis.com Building Official Use Only
Building Official Name: Permit No.: Date: Note 1. Indicate with an ‘x’ project design plans, computations and specifications that you prepared or directly supervised.
If ‘other’ is chosen, provide a description.