Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
tableofcontents
MSBA Accelerated Repair Program RK Finn/Ryan Road and Leeds Elementary Schools Northampton, Massachusetts Table of Contents 00 01 10-1 TABLE OF CONTENTS BIDDING REQUIREMENTS Page No. Section 00 01 00 Table of Contents 1 - 2 Section 00 11 00 Advertisement 1 - 2 Section 00 11 16 Invitation to Bid 1 – 2 Section 00 21 13 Instructions to Bidders 1 – 8 Section 00 41 00 General Bid Form 1 – 4 Section 00 41 16 Sub Bid Form 1 – 3 Section 00 41 20 Prime/General DCAM Update Statement 1 – 10 Section 00 41 30 Sub-Bidder DCAM Update Statement 1 – 10 Section 00 43 13 Bid Bond (AIA 310) 1 – 2 Section 00 45 13 Bid Proposal Certification 1 – 1 Section 00 45 45 Bidders Certification Regarding Payment of Prevailing Wage 1 – 1 CONTRACT FORMS AND GENERAL CONDITIONS Section 00 52 00 Owner-Contractor Agreement 1 – 5 Section 00 53 00 Certificate of Corporate Vote 1 - 1 Section 00 56 00 Statement of Wage Rate Compliance Form 1 – 1 Section 00 63 13 Performance Bond 1 – 2 Section 00 63 16 Payment Bond 1 – 2 Section 00 72 00 General & Supplementary Conditions of the Contract 1 – 48 Section 00 73 39 MBE & WBE Participation Guidelines 1 – 18 Section 00 73 43 Prevailing Wage Rates 1 – 37 Section 00 73 48 Weekly Payroll Records and Statement of Compliance 1 – 2 Section 00 86 00.1 List of Drawings – R K Finn Ryan School 1 – 1 Section 00 86 00.2 List of Drawings – Leeds Elementary School 1 - 1 DETAILED SPECIFICATIONS DIVISION 1 - GENERAL REQUIREMENTS Section 01 10 00 Summary of the Work 1 – 2 Section 01 23 00 Alternates 1 - 2 Section 01 27 00 Unit Prices 1 – 2 Section 01 30 00 Administrative Requirements 1 – 2 Section 01 31 00 Construction Scheduling and Phasing 1 – 2 Section 01 33 00 Submittals 1 – 2 Section 01 39 90 Minor Alteration Work 1 - 7 Section 01 40 00 Quality Control 1 – 1 Section 01 50 00 Construction Facilities and Temporary Controls 1 – 3 Section 01 52 40 Demolition and Construction Waste Management 1 – 6 Section 01 60 00 Materials and Equipment 1 – 2 Section 01 70 00 Contract Closeout 1 – 3 Section 01 81 00 Exterior Enclosure Commissioning 1 – 13 Section 01 81 00.1 Roof Commissioning Plan 1 - 9 Section 01 91 20 Commissioning Requirements 1 – 9 DIVISION 2 Section 02 08 20 Asbestos Abatement – Roof Drain Bowl Insulation by Owner 1 – 17 Section 02 08 21.1 Asbestos Inspection Report – Leeds Elementary School 1 – 4 Section 02 08 21.2 Asbestos Inspection Report – R K Finn Ryan Road School 1 - 5 MSBA Accelerated Repair Program RK Finn/Ryan Road and Leeds Elementary Schools Northampton, Massachusetts Table of Contents 00 01 10-2 Section 02 41 19 Selective Demolition 1 – 4 Section 02 83 33 Demolition of Materials Bearing Lead Paint 1 - 4 DIVISION 4 Section 04 01 20 Masonry Restoration and Repair – LEEDS School (FILED SUB BID) 1 - 24 DIVISION 5 Section 05 31 50 Steel Deck Infill 1 – 4 DIVISION 6 Section 06 10 00 Rough Carpentry 1 – 5 DIVISION 7 Section 07 42 13 Metal Wall Panels 1 – 5 Section 07 53 23 Roofing (Adhered EPDM Roof System) 1 – 23 Section 07 92 00 Joint Sealants 1 – 7 DIVISION 9 Section 09 90 00 Painting 1 - 6 DIVISION 22 Section 22 00 00 Plumbing (FILED-SUB BID) 1 – 8 DIVISION 23 Section 23 00 00 HVAC (FILED-SUB BID) 1 – 20 DIVISION 26 Section 26 00 00 Electrical (FILED-SUB BID) 1 – 21 DRAWINGS LEEDS ELEMENTARY SCHOOL ROOF REPLACEMENT PROJECT 1 – 49 COVER SHEET A1.0 EXISTING / DEMOLITION ROOF PLAN A1.1 PROPOSED ROOF PLAN A1.2 SCHEMATIC TAPER PLAN A1.3 EXTERIOR ELEVATIONS AND MASONRY RESTORATION A1.4 SITE PLAN A2.0 EXISTING / DEMO PARAPET DETAIL A2.1 NEW PARAPET DETAIL A2.2 TYPICAL ROOF EDGE DETAILS A2.3 TYPICAL FLASHING DETAILS A2.4 FLAT TO SLOPED ROOF DETAILS A2.5 EXISTING / DEMO PARAPET DETAIL THROUGH OPENING A2.6 NEW PARAPET DETAIL THROUGH OPENING A2.7 ENTRANCE CANOPY DETAIL A2.8 CHANNEL INFILL DETAIL MSBA Accelerated Repair Program RK Finn/Ryan Road and Leeds Elementary Schools Northampton, Massachusetts Table of Contents 00 01 10-3 A2.9 LOW TO HIGH ROOF DETAIL A2.10 CURB AND VENT DETAILS A2.11 ROOF DRAIN & EXP JOINT DETAILS A2.12 PITCH POCKET DETAIL A2.13 ELEVATOR PENTHOUSE DETAIL A2.14 GLASS BLOCK DETAIL A2.15 GLASS BLOCK DETAIL A2.16 THROUGH WALL FLASHING DETAIL A2.17 THROUGH WALL FLASHING DETAIL A2.18 HIGH TO LOW ROOF DETAIL A2.19 LOW TO HIGH ROOF DETAIL A2.20 SKYLIGHT FLASHING DETAILS A2.21 BELL TOWER DETAILS A3.0 EXISTING ELEVATIONS PHOTOS A3.1 EXISTING ELEVATIONS PHOTOS A3.2 TEST CUTS 5, 6 & 8 PHOTOS A3.3 OVERALL ROOF PHOTOS A3.4 OVERALL ROOF PHOTOS A3.5 FRONT PARAPET PHOTOS A3.6 FRONT PARAPET PHOTOS A3.7 ROOF C TO ROOF M TRANSITION A3.8 EXISTING CONDITIONS PHOTOS A3.9 SKYLIGHT PHOTOS A3.10 BELL TOWER PHOTOS A3.11 ELEV PENTHOUSE AND RTU PHOTOS A3.12 EXISTING ROOF CONDITIONS PHOTOS A3.13 ENTRANCE CANOPY PHOTOS A3.14 NEW AREAS OF THROUGH WALL FLASHING P1.1 ROOF PLAN - PLUMBING M1.0 EXISTING, DEMOLITION AND NEW - ROOF PLAN M2.0 HVAC DETAILS M2.1 HVAC DETAILS M2.2 HVAC DETAILS E1.0 EXISTING ROOF POWER PLAN RK FINN RYAN ROAD SCHOOL ROOF REPLACEMENT PROJECT 1 - 44 COVER SHEET A1.0 EXISTING ROOF PLAN A1.1 NEW WORK ROOF PLAN A1.2 SCHEMATIC TAPER PLAN A1.3 SITE PLAN A2.0 TYPICAL ROOF EDGE DETAILS A2.1 ROOF EDGE DETAILS A2.2 ROOF EDGE DETAILS A2.3 ROOF EDGE DETAILS A2.4 EXPANSION JOINT DETAILS A2.5 ROOF HATCH DETAILS A2.6 ROOF DRAIN DETAILS A2.7 ROOF TO WALL FLASHING DETAILS A2.8 ROOF TO WALL FLASHING DETAILS MSBA Accelerated Repair Program RK Finn/Ryan Road and Leeds Elementary Schools Northampton, Massachusetts Table of Contents 00 01 10-4 A2.9 DETAIL AT STEEL ROOF LADDER A2.10 CURB AND VENT DETAILS A2.11 ROOF TO CHIMNEY FLASHING DETAILS A2.12 CHIMNEY FLASHING DETAILS A2.13 METAL PANEL DETAIL A2.14 DETAIL AT STEEL ROOF LADDER A2.15 PITCH POCKET DETAIL A2.16 SECTION THROUGH ENTRANCE CANOPY A3.0 TEST CUTS 1, 2 AND 3 PHOTOS A3.1 TEST CUT 4 PHOTOS A3.2 TEST CUT 5 & 6 PHOTOS A3.3 EXISTING CONDITIONS A3.4 EXISTING CONDITIONS A3.5 EXISTING CONDITIONS A3.6 EXISTING CONDITIONS A3.7 EXISTING CONDITIONS A3.8 EXISTING CONDITIONS A3.9 EXISTING CONDITIONS AT GYM ROOF A3.10 EXISTING CONDITIONS A3.11 INTERIOR EXISTING CONDITIONS A3.12 INTERIOR EXISTING CONDITIONS AT ROOF DRAINS A3.13 EXISTING CONDITIONS AT GYM WALL A3.14 EXISTING CONDITIONS AT FRONT ENTRY CANOPY P1.1 ROOF PLAN - PLUMBING P2.1 ROOF DRAIN DETAIL M1.0 EXISTING AND NEW ROOF PLAN M2.0 HVAC DETAILS M2.1 HVAC DETAILS M2.2 HVAC DETAILS E1.0 EXISTING ROOF POWER PLAN END OF SECTION