013000MSBA Accelerated Repair Program RK Finn/Ryan Road and Leeds Elementary Schools Northampton, Massachusetts Administrative Requirements 01 30 00-1 SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS A. Administrative Submittals: 1. Schedule of Values: Submit prior to first Application for Payment. 2. Daily Construction Reports and Field Condition Reports: Compile and submit weekly. 3. Project Work Plan, including but not limited to, describing project sequence of work, building roof access, loading of roof materials on site and roof, coordination with Owner’s occupants of building and site during construction, weekly two week look ahead schedule of work, delivery schedules, identifying and maintaining egress and entry access to the building and site with the owner’s occupants at all times for life safety and operation of owner’s activities. This work plan must be submitted and approved prior to mobilization on site. 4. CORI Forms a. Each employee of the General Contractor and Subcontractors that will be present on the project site must fill out a CORI form and present in person the form with a valid and legal picture identification card to the authorized CORI representative at the school for a criminal background check to be performed. b. The CORI representative will provide the Trade Contractor and Subcontractors with forms of identification for each employee of the Trade Contractors and Subcontractors that are cleared and authorized to be on site. c. A copy of each employee’s identification card (hard hat sticker in lime green) must be visible at all times throughout construction activities. Anyone not displaying the identification card will be removed from site immediately and not allowed on site until proper identification is obtained. B. Changes to the Work: 1. Changes Initiated by Architect: Respond to requests from the Architect for changes by preparing a proposed change order (PCO). 2. Changes Initiated by Contractor: Contractor may request a change to the Work upon encountering unforeseen conditions. Prepare a PCO substantiating increased costs necessary to address the condition. 3. Proposed Change Order (PCO): Provide detailed accounting of labor, materials, equipment rentals, and subcontracting costs necessary to complete the proposed work. Indicate: base labor rate and detail of markups for direct personnel expense; subcontractors’ costs; quantities and unit costs of materials and equipment; and mark-up for overhead and profit per contract requirements. Percentage for labor burden should be capped at 25% max. Include proposed changes to project schedule. Require subcontractors to include same level of detail. Include summary sheet reflecting total costs. 4. Approved PCOs will be incorporated into a Change Order prepared by the Architect. MSBA Accelerated Repair Program RK Finn/Ryan Road and Leeds Elementary Schools Northampton, Massachusetts Administrative Requirements 01 30 00-2 C. Requests for Information: 1. Upon discovery of information required from the Architect, submit a written RFI to the Architect. Provide space on form for Architect’s response. 2. Thoroughly describe information requested, including specific drawing and specification references. Include Contractor’s proposed resolution. 3. Maintain detailed log of RFIs and distribute copy at project meetings. D. Project Management: 1. Project meetings: Attend weekly progress meetings conducted by the Architect, with the Owner. 2. Construction Progress Schedule: Prepare schedule indicating start and stop dates, and project milestones. Update as work progresses, but no less than monthly from NTP. Submit prior to starting work, once per month, and when schedule changes. E. Action Submittals: Prepare and submit Shop Drawings, Product Data, and Samples indicated. Improperly prepared submittals will be returned by the Architect without action for resubmittal. 1. Assign each submittal a unique submittal number. Indicate Project name, Contractor’s name, name of subcontractor or supplier who prepared the submittal, Specification Section number, and Drawing number or detail references if applicable. Provide space for Architect's action stamp. 2. Contractor's Review: Affix Contractor's stamp indicating that the Submittal has been reviewed and approved by Contractor and coordinated with other Work. 3. Deviations: Highlight, circle, or otherwise specifically identify deviations from the Contract Documents. Failure to indicate deviations shall not relieve Contractor of obligation to provide work as indicated on Contract Documents. 4. Copies: Three for printed matter. 5. Distribution: Distribute copies of approved submittals to Owners (two copies), subcontractors, and suppliers, and maintain one copy at project site. END OF SECTION