Loading...
Addendum 3 combinedRK Finn Ryan Road Elementary School, Northampton, Massachusetts Leeds Elementary School, Leeds, Massachusetts Page 1 of 1 Raymond Design Associates, Inc. 60 Ledgewood Place, Rockland, Massachusetts 02370 Telephone 1-781-421-3480 Fax 1-339-461-1293 Addendum to the Bidding Documents Addendum No. 3 MSBA Accelerated Roof Repair Program May 5, 2015 RK Finn Ryan Road Elementary School, Northampton, Massachusetts Leeds Elementary School, Leeds, Massachusetts To: Prospective Bidders This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated April 14, 2015 as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. This Addendum consists of one (1) page and (2) attachments, which are to be incorporated into the Bidding Documents: Attachments: Contractor Bid Questions and Answers – Addenda 3, dated May 5, 2015 (1 pages) Northampton Schools – Roof Projects – Filed Sub Bid Tabulation, Bid Opening 4/29/2015, 2:00 PM – Revision 1 dated May 5, 2015 (2 pages) Changes to the Project Manual: Item No. A-3.01 – Section 00 11 00 Advertisement Section 00 11 16 Invitation to Bids Section 00 21 16 Instruction to Bidders - General Bid Date Extension: ALL reference to the General Bids due date have been REVISED to Monday, May 11, 2015. The time and the place will remain the same as described. Item No. A-3.02 – Section 07 53 23 Roofing (Adhered EPDM Roof System), 1.03 – ADD “W. Provide an infrared scan of all roofs where existing insulation is called out to remain for both schools and provide results to the roof system manufacturer for acceptance in supplying the specified system roof warranty. Item No. A-3.03 – Section 07 53 23 Roofing (Adhered EPDM Roof System), 2.02, 3. – Third line at the end of sentence, REVISED the number “80” to “100”. Item No. A-3.04 – Section 07 53 23 Roofing (Adhered EPDM Roof System), 3.01 – ADD “Provide an infrared test at the beginning of the project for the scope of the work where the existing insulation is to remain; Required for both schools. Detection and replacement of wet insulation will be handled through unit pricing.” END OF ADDENDUM RK Finn Ryan Road Elementary School, Northampton, Massachusetts Leeds Elementary School, Leeds, Massachusetts Page 1 of 1 Raymond Design Associates, Inc. 60 Ledgewood Place, Rockland, Massachusetts 02370 Telephone 1-781-421-3480 Fax 1-339-461-1293 Addendum to the Bidding Documents Addendum No. 3 MSBA Accelerated Roof Repair Program May 5, 2015 RK Finn Ryan Road Elementary School, Northampton, Massachusetts Leeds Elementary School, Leeds, Massachusetts Contractor Bid Questions and Answers The Contractor Questions and Answers provided below shall become part of the Contract Documents and are binding to all Filed Subcontractors, Subcontractors and the General Contractor. It is the responsibility of each Filed Subcontractor, Subcontractor and the General Contractor to review the questions and answers set forth and to incorporate and include this information within their Bid Submittal. 1. The bid forms calls us to separate the price for each school, but the filed sub bid prices are not separated. How do we accurately divide the prices to give a true cost of each. Answer: Please see the attached revised Filed Sub Bid Tabulation Form separating the bids of the two schools. 2. In the filed sub bid tabulation under the plumbing bids Corcoran is the only bidder that has a delete for the alternates. Does this mean they are the only plumber accepted? Please clarify for me. Answer: Please review revised attached Filed Sub Bid Tabulation form. END OF ADDENDUM QUESTIONS AND ANSWERS NORTHAMPTON SCHOOLS ‐ ROOF PROJECTSFILED SUB BID TABULATIONBID OPENING 4‐29‐15 AT 2 PMBIDDER NAME BONDDCAM CERT. DCAM UPDATE RESTRICTADD # 1Statement Tax ComplianceAffidavit of ComplianceUNIT PRICESBASE BID AMOUNT RK Finn Ryan Elem.BASE BID AMOUNT Leed ElementaryAlt # 1Company Present Y/NMASONRY1MDM Engineering Co.YY YUse only by MDM Y No N/A 83,000$ N/A N2Kenny MasonryYY Y No YYN/A 97,890$ N/A Y3Champlain MasonryYY Y No Y Y YYN/A 130,111$ N/A N4Calhess RestorationY Y Y No Y Y Y Y N/A 132,000$ N/A N5Sullivan & Narey Constr.YY Y No YYN/A 144,692$ N/A NPLUMBING1Waterline Industries CorpYY YUse only by Waterline Y Y 16,000$ 5,500$ NWaterline Industries Corp has been rejected for non responsive bid, alternate price not filled out2Royal Steam HeatY Y Y No Y Y $20,000 $7,500 $0 N3Corcoran Plumb & HeatY Y Y No Y Y $36,160 $11,350 (13,648)$ YBIDDER NAME BONDDCAM CERT. DCAM UPDATE RSTRICTADD # 1Statement Tax ComplianceAffidavit of ComplianceUNIT PRICES BASE BID AMOUNT Alt # 1Company Present Y/NHVAC1Waterline Industries CorpYY YUse only by Waterline Y N 7,600$ 4,700$ $0 N5/6/2015 NORTHAMPTON SCHOOLS ‐ ROOF PROJECTSFILED SUB BID TABULATIONBID OPENING 4‐29‐15 AT 2 PM2Royal Steam HeatY Y Y No Y N 14,800$ 23,400$ $0 N3Corcoran Plumb & HeatY Y Y No Y N $ 25,300 $ 31,000 $0 YElectrical1Waterline Industries CorpYY YUse only by Waterline Y N 10,577$ 14,100$ $0 N2Staiti Electrical LLCY Y Y No Y N 19,210$ 16,313$ $0 N3Amp ElectricalY Y Y No Y N 16,878$ 28,284$ $0 N5/6/2015