Loading...
Addendum 1 Combined REV 1RK Finn Ryan Road Elementary School, Northampton, Massachusetts Leeds Elementary School, Leeds, Massachusetts Page 1 of 1 Raymond Design Associates, Inc. 60 Ledgewood Place, Rockland, Massachusetts 02370 Telephone 1-781-421-3480 Fax 1-339-461-1293 Addendum to the Bidding Documents Addendum No. 1 MSBA Accelerated Roof Repair Program April 24, 2015 RK Finn Ryan Road Elementary School, Northampton, Massachusetts Leeds Elementary School, Leeds, Massachusetts To: Prospective Bidders This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated April 14, 2015 as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. This Addendum consists of one (1) page and (2) attachments, which are to be incorporated into the Bidding Documents: Attachments: Contractor Bid Questions and Answers – Addenda 1, dated April 24, 2015 (2 pages) Section 01 27 00 Unit Prices (2 pages) Changes to the Project Manual: Item No. A-1.01 – Section 00 72 00 General Conditions, Article 8.1, 1.1.1, page 20. - REPLACE the words “sixty (60) calendar days.” At the end of paragraph with the following: “from award of the contract start date through substantial completion of August 15, 2015.” Item No. A-1.02 – Section 01 27 00 Unit Prices, Part 2 List of Unit Prices – ADD the following: Ref: Section 04 01 20: Cost per square foot for (Based on 1000 square feet intervals) providing additional exterior masonry cleaning and pressure washing. (Section 01 27 00 Unit Prices is reissued as an attachment.) Base bid shall include 1000 sf. above what is indicated on Drawings Item No. A-1.03 – Section 01 39 90 Minor Alteration Work, 1.04, - ADD the following: 1. Provide ¾” plywood protection to pavement mural on the exterior rear of the Leeds Elementary building to access the roof. Assume an approximate size of 50 feet x 75 feet. Item No. A-1.04 – Section 07 53 23 - Roofing, 1.03, - ADD the following: W. Provide new acoustical deck flute insulation at Gymnasium 3 inch metal acoustical deck at RK Finn Ryan Road Elementary School. Changes to the Drawings: Item No. A-1.03 – Drawing A1.3 Exterior Elevations and Masonry Restoration, Detail 5/A1.3 & 2/A1.3 and A3.8 and A3.12 - REVISE and ADD note to Read: Pressure wash masonry at both sides and front of main entry including concrete canopy over entry. END OF ADDENDUM RK Finn Ryan Road Elementary School, Northampton, Massachusetts Leeds Elementary School, Leeds, Massachusetts Page 1 of 2 Raymond Design Associates, Inc. 60 Ledgewood Place, Rockland, Massachusetts 02370 Telephone 1-781-421-3480 Fax 1-339-461-1293 Addendum to the Bidding Documents Addendum No. 1 MSBA Accelerated Roof Repair Program April 24, 2015 RK Finn Ryan Road Elementary School, Northampton, Massachusetts Leeds Elementary School, Leeds, Massachusetts Contractor Bid Questions and Answers The Contractor Questions and Answers provided below shall become part of the Contract Documents and are binding to all Filed Subcontractors, Subcontractors and the General Contractor. It is the responsibility of each Filed Subcontractor, Subcontractor and the General Contractor to review the questions and answers set forth and to incorporate and include this information within their Bid Submittal. 1. Which roof drain assembly should we carry under our unit pricing; type A or type B? Answer: Carry type “A” roof drain for unit pricing. 2. Who is responsible for cutting the roof deck and adding supplemental steel if needed for new sump pans? Answer: Cutting of the roof deck is by Section 22 00 00, adding and supplemental steel decking reinforcement is by Section 05 31 50 3. Who is responsible for cutting and patching of ceilings if required to access roof bowl locations? Who is responsible for removal/reinstallation of acoustical ceilings where applicable? Answer: The cutting of the gyp plaster ceiling will be done by the section 22 00 00. Patching, painting and installation of the access panel door by General Contractor. Removal and reinstallation of acoustical ceiling are by section 22 00 00 for access to roof drain work from below. 4. What are the sizes of the existing roof drain piping at locations where roof bowls are being replaced? Answer: RK Finn Ryann Road Elementary School: The drain piping is 4 inch at the classroom areas and the Gymnasium, 3 inch at the entry canopy. Leeds Elementary School: The drain piping is 4 inch. 5. Unit pricing for drain assemblies notes to include insulation but there is no insulation section in the plumbing specifications. Please advise. Answer: The underside of roof drain bodies shall be insulated with pre-formed 1 ½” thick fiberglass fitting insulation cut from dense fiberglass blanket and covered with pre-molded P.V.C. fitting covers. P.V.C. covers shall overlap the adjoining insulation and shall be secured with pressure sensitive vinyl tape over a vapor barrier adhesive seal at the joints. (Note: Staples or tacks are not permitted on covers). Insulation shall include the bowl, vertical section of pipe below horizontal elbow joint, reference P1.1, typ,. RK Finn Ryan Road Elementary School, Northampton, Massachusetts Leeds Elementary School, Leeds, Massachusetts Page 2 of 2 6. The Unit Pricing item #2 asks for us to include (4) new drain assemblies in our base bid. The form for sub contractor’s bids requires that we give separate prices for each school then a total for both. Where should we apply the costs for the additional drain assemblies? A. Answer: The (4) new drain bodies described in Section 01 27 00 Unit Prices are to be used for both schools where needed. For administrative purposes of separating scope between the two school project, provide (2) drains at Leeds Elementary and (2) drains at RK Finn Ryan Road Elementary School. B. Answer: Clarification – RK Finn Ryan Road Elementary School - Provide drain insulation to all roof drains shown on 1/P1.1 7. Instructions to bidders #1.08 is requesting the following documents which are not included as bid docs in the Bidding Documents noted on BiddocsOnline 5. Affidavit of Compliance and Vote of Authorization 6. Statement of Tax Compliance Answer: Items 5 and 6 in question above are not required to be included as part of the Bid documents submission. END OF ADDENDUM MSBA Accelerated Repair Program RK Finn/Ryan Road and Leeds Elementary Schools Northampton, Massachusetts UNIT PRICES 01 27 00 - 1 SECTION 01 27 00 UNIT PRICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. B. Note: This list of Unit Prices shall be completed and included with the Bid Form. 1.2 SUMMARY A. This Section includes administrative and procedural requirements for unit prices. B. Related Sections include the following: 1. Section 05 31 50 Steel Deck Infill 2. Section 06 10 00 Rough Carpentry 3. . Section 07 53 23 Roofing 1.3 DEFINITIONS 1. Unit price is a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased. 1.4 PROCEDURES A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit. B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections. C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor. D. List of Unit Prices: A list of unit prices is included in Part 2. Specification Sections referenced in the schedule contain requirements for Work described under each unit price. The unit prices provided will be used for ADD’s and cover the description outlined below for each scope of work. DEDUCT’s will be taken at 15% less than the ADD price to account for overhead and profit. PART 2 - LIST OF UNIT PRICES DESCRIPTION UNIT PRICE Cost per board foot for replacing deteriorated or unsuitable wood nailers and blocking with pressure treated type specified. New nailers and blocking shall be installed in accordance with FMG 1- 49 fastening guidelines. (Section 07 53 23 Roofing) Base bid shall include 500 lf (2x6) above what is indicated on _______________ the drawings. Base bid shall include 200 lf (4x12) above what is indicated on _______________ the drawings. MSBA Accelerated Repair Program RK Finn/Ryan Road and Leeds Elementary Schools Northampton, Massachusetts UNIT PRICES 01 27 00 - 2 ________________________________________________ Cost per item to replace existing roof drain bowl assembly scheduled to be reused.. This cost shall include new strainers and clamp rings bowl and anchoring devices.(Section 22 00 00 Plumbing) Base bid shall include 4 new drain assemblies above what Is indicated on drawings (including insulation). ______________________________________________________ ______________ Cost per square foot for replacing wet 4 inch thick polyisocyanurate insulation and vapor-barrier with new in thickness to match existing. (Section 07 53 23 Roofing) Base bid shall include 1000 s.f. above what's indicated on drawings. _____________________________________________________ ______________ Ref: Section 05 31 50: Cost per square foot for replacing deteriorated steel roof deck that may be encountered during removal of the existing roof system. Deck type, gauge and profile shall match existing. (Section 07 53 23 Roofing) Prices should be based on a Type "B" Decking. Base bid shall include 500 sf. above what is indicated on Drawings _____________________________________________________ ______________ Ref: Section 05 31 50: Cost per square foot for infilling opening in existing steel decking less than 18" in width with a steel plate as specified. (Section 07 53 23 Roofing) Base bid shall include 500 sf. above what is indicated on Drawings _____________________________________________________ ______________ Linear foot cost to replace existing metal counter flashings at base of wall and roof intersections. (Section 07 53 23 Roofing) Base bid shall include 750 lf. Above what is indicated on Drawings. ______________________________________________________ ______________ Linear foot cost to provide through wall flashings at base of masonry wall, Leeds Detail sheets A2.3, A2.14, A2.15, A2.16 & A2.17. (Section 04 01 20) Base bid shall include 50 lf. Above what is indicated on Drawings. ______________________________________________________ ______________ Ref: Section 04 01 20: Cost per square foot for (Based on 1000 square feet intervals) providing additional exterior masonry cleaning and pressure washing. Base bid shall include 1000 sf. above what is indicated on the Drawings (Addendum 1) ______________________________________________________ ______________ END OF SECTION 01 27 00