380 Elm Letter of Substantial Completion - 2012-10-30
• www.kuhnriddle.com •
October 30, 2012
Louis Hasbrouck, Building Commissioner
City of Northampton
Puchalski Municipal Building
212 Main Street
Northampton, MA 01060
RE: Northampton High School
Black Box Theater
Northampton, MA
PROJ. NO.: 12040
Dear Mr. Hasbrouck,
Pursuant to Section 116.2 of the Massachusetts State Building Code, I certify that Kuhn Riddle Architects,
Inc., has performed the required professional services for the referenced project, as follows:
1. Reviewing for conformance to the design concept, samples and other submittals by the contractor
in accordance with the requirements of the construction documents.
2. Reviewing and approving the quality control procedures for code-required controlled materials.
3. Being present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine, in general, if the work is being performed in
a manner consistent with the construction documents.
The completed work, to the best of my knowledge and belief, complies with the Massachusetts State
Building Code and with the documents approved for the building permit.
Sincerely,
Aelan B. Tierney, AIA, LEED AP, BD+C
Mass. Registration No. 20441
cc: Stephen Eldredge, Head of the Theater Department, Northampton High School
Steve Zucchino, General Contractor