133 Glendale REScheck0 Generated by REScheck-Web Software
VI Compliance Certificate
Project 18229 HABITAT FOR HUMANITY
Energy Code: 20091ECC
Location:
Construction Type:
Northampton, Massachusetts
Single-family
Project Type: New Construction
Conditioned Floor Area:
Glazing Area
Climate Zone:
Permit Date:
Permit Number:
Construction Site:
1,940 ft2
6%
5 (6404 HDD)
133 GLENDALE RD.
NORTHAMPTON, MA 01062
Compliance: Passes using UA trade-off
Compliance: 51.9% Detter Than Code
Owner/Agent:
MEGAN MCDONOUGH
PIONEER VALLEY HABITAT FOR
HUMANITY
140 PINE STREET
FLORENCE, MA 01062
413 586 5430
megan@pvhabitat.org
Maximum UA: 241 Your UA: 116
Designer/Contractor:
Kristen Connors
VERMOD HOMES
2677 HARTFORD AVE
WILDER, VT 05088
Kristen Connors
kristen@vermodhomes.com
The % Better or Worse Than Code Index reflects how close to compliance the house Is based on code trade-off rules.
It OOES NOT provide an estimate of energy use or cost relative to a minlmum-c:ode home.
Envelope Assemblies
Gross Area Cavity Cont.
Assembly _or R-Value R-Value U-Factor UA Perimeter
Ceiling: Structural Insulated Panels (SIPs)
Wall: other
Door: Solid Door (under 50% glazing)
Window: Vinyl Frame
Floor: All-Wood Joist/Truss
602
2,552
42
155
602 41.0
55.0
0.0
0.019
0.023
0.120
0.200
0.025
11
54
5
31
15
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building s been designed to meet the 2009 IECC requirements In
REScheck Version : 'fScheck-Web and to comply with the mandat r ments listed In the REScheck Inspection Checklist.
NaJ?.~T~ eh') Lovtnu~ / ~U;\ ' D~JZq J /0
Project Notes:
PIONEER VALLEY HABITAT FOR HUMANITY (the builder) is providing required, design, material and labor for the HVAC
system in this home. VERMOD is providing the insulated envelope.
Project Title: 18229 HABITAT FOR HUMANITY
Data filename:
Report date: 08/29/18
Page 1 of 7
G6 Generated by REScheck-Web Software
Compliance Certificate
Project 18229 HABITAT FOR HUMANITY
Energy Code: 20091ECC
Location:
Construction Type:
Northampton, Massachusetts
Single-family
Project Type: New Construction
Conditioned Floor Area:
Glazing Area
Climate Zone:
Permit Date:
Permit Number:
Construction Site:
1,940 ft2
6%
5 (6404 HOD)
133 GLENDALE RD.
NORTHAMPTON, MA 01062
ompliance: Passes using UA trade-off
Compliance: 51.9% Better Than Code
Owner/Agent:
MEGAN MCDONOUGH
PIONEER VALLEY HABITAT FOR
HUMANITY
140 PINE STREET
FLORENCE, MA 01062
413 586 5430
megan@pvhabitat.org
Max,murn UA: 241 Your UA: 116
Design er /Contractor:
Kristen Connors
VERMOD HOMES
2677 HARTFORD AVE
WILDER, VT 05088
Kristen Connors
kristen@vermodhomes.com
The% Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-oft rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Ca ity C t
Assembly _or R-V:lue R-;;,~e U-Factor UA Perimeter
Celling: Structural Insulated Panels (SIPs)
Wall: Other
Door: Solid Door (under 50% glazing)
Window: Vinyl Frame
Floor: All-Wood Joist/Truss
602
2,552
42
155
602 41.0
55.0
0.0
0.019
0.023
0.120
0.200
0.025
11
54
5
31
15
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name -Title Signature Date
Project Notes:
PIONEER VALLEY HABITAT FOR HUMANITY (the builder) is providing required, design, material and labor for the HVAC
system in this home. VERMOD is providing the insulated envelope.
Project Title: 18229 HABITAT FOR HUMANITY
Data filename:
Report date: 08/29/18
Page 1 of 7
ti""~ REScheck Software Version : REScheck-Web
y I Inspection Checklist
Energy Code: 2009 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
sec;ion I Pre-Inspection/Plan Review Plans Verified Field Verified Complies? I Comments/Assumptions
& Req.lD Value Value
103.2 Construction drawings and Dcomplies
[PRl]' documentation demonstrate Dooes Not
\t' energy code compliance for the DNot Observable building envelope. DNot Applicable ;....______-------~-------------------
103.2, Construction drawings and bcomplies
403.7 documentation demonstrate Dooes Not
[PR3]1 energy code compliance for DNot Observable
~' lighting and mechanical systems.
Systems serving multiple ONot Applicable
dwelling units must demonstrate
compliance with the commercial
code.
403.6 Heating and cooling equipment is Heating: Heating: Dcomplies
[PR2J' sized per ACCA Manual S based Btu/hr __ Btu/hr __ Dooes Not
Jj,.1 on loads per ACCA Manual J or Cooling: Cooling: DNot Observable other approved methods. Btu/hr __ Btu/hr __ DNot Applicable
Additional Comments/Assumptions:
; 2 I Medium Impact (Tier 2) __ ;__:[Ii.ow l111pact (Tier 3)
Project Title: 18229 HABITAT FOR HUMANITY
Data filename:
Report date: 08/29/18
Page 2 of 7
'
sec;ion I Foundation Inspection I Complies? I & Req.10
303.2.1 A protective covering is installed to Dcomplies
[FOll]' protect exposed exterior insulation Dooes Not
It: and extends a minimum of 6 in. below ONot Observable grade. DNot Applicable
403.8 Sn~w-a~d-ice~~~ltin9-SY~tem --~~-~t~ol; ·oco~P1-i~-~----
[F012]' installed.
M:
Additional Comments/Assumptions:
L_l j High Impact (Tier 1) --.. ------.. -·-----
Project Title: 18229 HABITAT FOR HUMANITY
Data filename:
Dooes Not
0Not Observable
DNot Applicable
i iJ.Bedium Impact (Tier 2)
Comments/Assumptions
----
! 3 I Low Impact (Tier 3)
Report date: 08/29/18
Page 3 of 7
Section
Framing/ Rough-In lnspectlon_j_ Plan~a~~:fied j Fielt:i~:fied Complies? # Comments/Assumptions
& Req.lD
402.1.1. Door U-factor. U-U--~ Dcomplies See the Envelope Assemblies
402.3.4 ----Dooes Not table for values.
[FR1)1
DNot Observable \.!' DNot Applicable i-------------------------------------·--"· ------------
402.1.1. Glazing U-factor (area-weighted U-__ u---Dcomplies See the Envelope Assemblies
402.3.1. average). Dooes Not table for values.
402.3.3. DNot Observable 402.5
[FR2)1 DNot Applicable
_lj,1
----·-----. "'··------· -. -- --------··-----
303.1.3 Li-factors of fenestration products Dcomplies
[FR4)1 are determined in accordance Dooes Not
\!!' with the NFRC test procedure or DNot Observable taken from the default table. DNot Applicable ·---------------------------------·--
402.4.4 Fenestration that is not site built Dcomplies
[FR20)1 is listed and labeled as meeting Dooes Not
V' AAMA/WDMA/CSA 101/l.5.2/A440 DNot Observable or has infiltration rates per NFRC
400 that do not exceed code DNot Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures Dcomplies ----
[FR16)' sealed at housing/interior finish Dooes Not
~I and labeled to indicate s2.0 cfm DNot Observable leakage at 75 Pa. DNot Applicable
-------- --------------------
Dcomplies 403.2.1 Supply ducts in attics are R-__ R---[FR12)1 insulated to ~R-8. All other ducts R-__ R-__ Dooes Not
~I in unconditioned spaces or ONot Observable outside the building envelope are
insulated to ~R-6. DNot Applicable
f-·-----·-
Dcomplies 403.2.2 All joints and seams of air ducts,
[FR13)1 air handlers, filter boxes, and Dooes Not
,It) building cavities used as return DNot Observable ducts are sealed. DNot Applicable - -------------------------
403.2.3 Building cavities are not used for Dcomplies
[FR15]3 supply ducts. Dooes Not
!!.-· DNot Observable
DNot Applicable --~----------------··-··------403.3 HVAC piping conveying fluids R-__ R-__ Dcomplies
[FR17]2 above 105 2f or chilled fluids Dooes Not
w below 55 Qf are insulated to ~R-DNot Observable 3. DNot Applicable ·---·-----------··· ---------------403.4 Circulating service hot water R---R-__ Dcomplies
[FR18)' pipes are insulated to R-2. Dooes Not
-It) 0Not Observable
DNot Applicable ----------·---------------403.5 Automatic or gravity dampers are Dcomplies
[FR19)' installed on all outdoor air Dooes Not
Jt,• intakes and exhausts. DNot Observable
DNot Applicable
Additional Comments/Assumptions:
[_ 1J __ ~_igh 1ffipa(t (~ier 1) _ r2 j Medium··1·m~ct (Tier 2)-i 3 [ LOW impact (Tier 3)
Project Title: 18229 HABITAT FOR HUMANITY
Data filename:
Report date: 08/29/18
Page 4 of 7
I
I :
I
Section Plans Verified # Insulation Inspection
& Req.lD Value
303.1 All installed insulation is labeled
[IN13)' or the installed R-values
11,, provided.
-------------· ----------402.1.1. Floor insulation R-value. R-__
402.2.5. D Wood 402.2.6 D Steel [IN1]1
"' ---------303.2. Floor insulation installed per
402.2.6 manufacturer's instructions, and
[IN2)' in substantial contact with the
if' underside of the subfloor.
---·-- -
402.1.1. Wall insulation R-value. If this is a R-__
402.2.4, mass wall with at least 1/i of the D Wood 402.2.5 wall insulation on the wall D Mass [IN3]1 exterior, the exterior insulation
"' requirement applies. D Steel
-------
303.2 Wall insulation is installed per
[IN4)' manufacturer's instructions.
\j}
Additional Comments/Assumptions:
1 ; High Impact (Tier 1)
Project Title: 18229 HABITAT FOR HUMANITY
Data filename:
·-
Field Verified
Value Complies?
DComplies
Dooes Not
DNot Observable
ONot Applicable
R-__ Dcomplies
D Wood DDoes Not
D Steel DNot Observable
DNot Applicable
Dcomplies
Dooes Not
ONot Observable
DNot Applicable
R-__ Dcomplies
D Wood Dooes Not
D Mass DNot Observable D Steel DNot Applicable
Dcomplies
Dooes Not
ONot Observable
DNot Applicable
I Comments/Assumptions
See the Envelope Assemblies
table for values.
- ----------------
See the Envelope Assemblies
table for values.
------------
Report date: 08/29/18
Page 5 of 7
!
i
Section I' # Final Inspection Provisions
~-~~'!,![) __
402,Ll, Ceiling insulation R-va!ue. Where
402,2,l, > R.~30 is required, R-30 can be
402.2.2 used if insulation is not
[F!1]1 compressed at eaves, R-30 may
I v, be used for 500 fF or 20% I ~ (whichever is less) where
' sufficient space is not available, ---··············--------····-----·-----1.1, Ceiling insulation installed per
, 303.2 manufacturer's instructions.
; [Fl2]1 Blown insulation marked every
l -~ 300 ft2•
Plans Verified
Value
R-__
D Wood
D Steel
Field Verified
Value
R-
Wood
Steel
Complies? Comments/Assumptions
·=------·'············----·-,--,----·---·----~-Dcomplies See the Envelope Assemblies
Dooes Not table. for values.
ONot Observable
DNot Applicable
·-------·-·-·-··----=----Ocompiies
Dooes Not
ONot Observable
DNot Applicable --~------------Oco~Pli~; ·----·-·-----·-·-.. · .. ·------------, 402.2.3
[Fl3]'
402.4.2,
402.4.2.1
[Fil?]'
403.2.2
[F14l'
~-
Attic access hatch and door
insulation ~R-value of the
adjacent assembly.
Building envelope tightness
verified by blower door test result
of <7 ACH at 50 Pa, T~is
requirement may instead be met
via visual inspection, in which
case verification may need to
occur during fnsulation
Post construction duct tightness
test result of ::s8 cfm to outdoors,
or s 12 cfm across systems. Or,
rough·in test result of .s:6 cfm
across systems or s4 cfm
without air handler. Rough.in test
verification may need to occur
f------~urinQ __ Framing lnspec~J-~!.1_: __ ···
403.1.1
[F19]'
.tj)
403.1.2
[FllOJ'
M•
403.4
[Fill]'
-~
404.1
'[Fl6]1
~'
401.3
[F17l'
Programmable thermostats
installed on forced air furnaces.
Heat pump thermostat instalfed
on heat pumps.
Circulating service hot water
systems have automatic or
accessible manual controls.
50% of lamps in permanent
fixtures are high efficacy lamps.
Compliance certificate posted.
Manufacturer manuals for
mechanical and water heating
equipment have been provided.
Additional Comments/Assumptions:
_}_L~~ig~ Impact (Tier 1)
R-__ R-
Dooes Not
ONot Observable
DNot Applicable
ACHSO-;;;=-ACH 50 =-=::._ Dcomplies --
Dooes Not
cfm cfm
0Not Observable
DNot Applicable
······ocomplies
Dooes Not
ONot Observable
DNot Applicable
--------=~--------~---------~·-
Dcomplies
DDoes Not
ONot Observable
DNot Applicable
Dcomplies
DDoes Not
ONot Observable
DNot Applicable
---"o"complies
DDoes Not
DNot Observable
DNot Applicable -------------···· Dcomplies
DDoes Not
ONot Observable
DNot Applicable --------------=~-Dcompfies
Dooes Not
ONot Observable
DNot
3 : Low Impact (Tier~)~
Project Title: 18229 HABITAT FOR HUMANITY
Data filename,
Report date: 08/29/18
Page 6 of 7
1 High Impact (Tier 1)
Project Title: 18229 HABITAT FOR HUMANITY
Data filename:
; 2 I Medium Impact (Tier 2) i 3 I Low Impact (Tier 3)
Report date: 08/29/18
Page 7 of 7
2009 IECC Energy
Efficiency Certificate
Insulation Rating R.Value
Above-Grade Wall
Below-Grade Wall
Floor
Ceiling / Roof
Ductwork (unconditioned spaces):
0.00
0.00
41.00
55.00
Glass & Door Rating U-Factor SHGC
Window
Door
0.20
0.12
Heating & Cooling Equipment Efficiency
Heating System: _________ _
Cooling System: ________ _
Name: ______________ _ Date~=-------
Comments