Meeting notes 3-6-2018Crocker Building Company Inc. Meeting Notes Project: CheckWriters (Gaiwith Hall) Date: March 6, 2018 Location: 46 Round Hill Rd Northampton, MA Current Construction Status: • Structural improvements continue. All remaining designed steel is on-site. Installation complete waiting on answers for completion. • Steel framing is nearly complete in the North wing. • Wood framing and demolition continue. • Seismic reinforcing clips are being installed. Waiting on design update. • M.J. Moran is working on the HVAC design. Current Items: • Crocker to provide a preliminary construction schedule. 3/6/18. • Exterior wall finishes will need to be clarified and a determination made on the window trim details 3/6/18. • Will cable trays be used for data wiring? Explore options for floor access trays for power and data in open cubicle areas. 3/6/18. • The Building Dept. will need fire suppression drawings and a Fire Protection Narrative prior to the issuance of the Building Permit. 3/6/18. • MJ Moran will provide the opening dimensions necessary for the ductwork crossing from the basement into the new addition space. 3/6/18. • Crocker to send site plan information to MJ Moran. 3/6/18. • Crocker to coordinate a floor elevation survey of the existing building. 3/6/18. Open Items: • GNCB will require the weight and size of the rooftop AHU to determine the reinforcing if necessary. This is detailed in their field report. 2/13/18. A further discussion with GNCB took place on 2/27. Open items include: the seismic anchors not holding in the brick walls, roof top HVAC unit feasibility, and basement wall penetrations for the HVAC ductwork. 2/27/18. Open 3/6/18. • A review of the existing underground sewer piping will be required to determine the best course for the new plumbing layout. 2/27/18. MJ Moran to coordinate a survey with Fletcher sewer. 3/6/18. • What will be done with the existing sewer pump and tank in the former boiler room? 2/27/18. Item Closed tank to remain as is per Jim Hebert. • Review the ground mounted condenser pad location. 2/27/18. 3/6/18. • A complete updated Structural drawing is schedule for completion on 2/23/18, 2/27/18. No new set to be issued we are instructed to use the current set. 3/6/18. • Rebidding of the project will begin after the completion of the Structural drawings and updated finish information. 2/20/18, 2/27/18. Rebidding on hold pending updated finishes and wall types. Open 3/6/18. • Review the dumpster surround and access to the loading dock. 2/20/18, 2/27/18. • Request from CheckWriters production area and IT room equipment loads to all proper sizing of the cooling in these areas 2/20/18, Open 3/6/18 • Exterior ADA ramp to remain at the former front entry. The rails will be reviewed for compliance. 1/30/18, 2/13/18, 2/27/18. Closed Item 3.7/18 Existing to remain as is. • Max Hebert will check with the backup generator supplier for serviceability of the existing unit. 1/30/18, 2/13/18, 2/27/18, 3/6/18. • A discussion of a food prep / Break room area was included in the meeting. Review exhaust hood/ range requirements with Fire Alarm and Sprinkler contractors 2/13/18, 2/20/18, 2/27/18, 3/6/18. • Building Management, HVAC thermostat controls, Additional zoning was discussed and will be reviewed again after completion of the HVAC design drawings. 2/13/182/27/18, 3/6/18. Owner / Contractor Items: • Contract remains open pending a legal review. Open 2/6/18, 2/13/18, 2/20/18, 2/27/18. A mark up copy was provided to Crocker 3/5/18. Crocker returned a counter draft on 3/7/18 for review. • Phillips Insurance has requested from Crocker a copy of the Contract and proof of financing. 3/1/18, 3/6/18. Next meeting schedule, Tuesdays March 13th, at 9:30 AM.