Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Mt Tom Road depot Conservation Commisson RFD Plans
Important: When filling out forms on the computer, use only the tab key to move your cursor do not use the return key. Massachusetts Department of Environmental Protection Bureau of Resource Protection Wetlands WPA Form 2 Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information From: Northampton Conservation Commission To: Applicant Property Owner (if different from applicant): MassHighway Department, c/o Albert R. Stegemann, P.E. D -2 Highway Director Name 811 North King Street Mailing Address Mailing Address Northampton MA 01060 City/Town State Zip Code City/Town 1. Title and Date (or Revised Date if applicable) of Final Plans and Other Documents: U.S.G.S. Locus and Environmental Features Map (2 Sheets) Title FEMA Flood Insurance Rate Map Title Plans entitled "Facilities Building and Site Improvements for Northampton Maintenance Depot" 2. Date Request Filed: 9/18/2009 B. Determination Pursuant to the authority of M.G.L. c. 131, 40, the Conservation Commission considered your Request for Determination of Applicability, with its supporting documentation, .and made the following Determination. Project Description (if applicable): Replace an existing office facility with a new 600 square foot (30 ft. by 20 ft.) building in the same location. The existing facility will be removed and all existing pipe and utility connections will be disconnected. An existing propane tank will be relocated from the north side of the building site to the west side, and the associated pipes and connections will be removed and relocated. A bituminous pavement parking lot of 4 spaces, approximately 36 ft. by 18 ft., is proposed to be installed on the west side of the new building. The new building's sanitary systems will be connected to an existing sanitary manhole, approximately 75 ft. south of the building site, along which new bituminous pavement will be installed. Haybales and silt fence will be arranged along the eastern property line as soil erosion and sedimentation control during construction. Project Location: Mount Tom Road (Route 5) Street Address Assessors Map /Plat Number wpaform2.doc Determination of Applicability rev. 10/6/04 Northampton City/Town Parcel /Lot Number 3,9 s' State Zip Code 9/18/2009 Date 4/3/78 Date 7/23/09 Date Page 1 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection Wetlands WPA Form 2 Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) The following Determination(s) is /are applicable to the proposed site and /or project relative to the Wetlands Protection Act and regulations: Positive Determination Note: No work within the jurisdiction of the Wetlands Protection Act may proceed until a final Order of Conditions (issued following submittal of a Notice of Intent or Abbreviated Notice of Intent) or Order of Resource Area Delineation (issued following submittal of Simplified. Review ANRAD) has been received from the issuing authority (i.e., Conservation Commission or the Department of Environmental Protection). 1. The area described on the referenced plan(s) is an area subject to protection under the Act. Removing, filling, dredging, or altering of the area requires the filing of a Notice of Intent. 2a. The boundary delineations of the following resource areas described on the referenced plan(s) are confirmed as accurate. Therefore, the resource area boundaries confirmed in this Determination are binding as to all decisions rendered pursuant to the Wetlands Protection Act and its regulations regarding such boundaries for as long as this Determination is valid. 2b. The boundaries of resource areas listed below are not confirmed by this Determination, regardless of whether such boundaries are contained on the plans attached to this Determination or to the Request for Determination. 3. The work described on referenced plan(s) and document(s) is within an area subject to protection under the Act and will remove, fill, dredge, or alter that area. Therefore, said work requires the filing of a Notice of Intent. 4. The work described on referenced plan(s) and document(s) is within the Buffer Zone and will alter an Area subject to protection under the Act. Therefore, said work requires the filing of a Notice of Intent or ANRAD Simplified Review (if work is limited to the Buffer Zone). 5. The area and /or work described on referenced plan(s) and document(s) is subject to review and approval by: Name of Municipality Pursuant to the following municipal wetland ordinance or bylaw: Name Ordinance or Bylaw Citation wpaform2.doc Determination of Applicability rev. 10/8/04 Page 2 of 5 Massachusetts Department of Protection Bureau of Resource Protection Wetlands WPA Form 2 Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) 6. The following area and /or work, if any, is subject to a municipal ordinance or bylaw but not subject to the Massachusetts Wetlands Protection Act: 7. If a Notice of Intent is filed for the work in the Riverfront Area described on referenced plan(s) and document(s), which includes all or part of the work described in the Request, the applicant must consider the following alternatives. (Refer to the wetland regulations at 10.58(4)c. for more information about the scope of alternatives requirements): Alternatives limited to the lot on which the project is located. Alternatives limited to the lot on which the project is located, the subdivided lots, and any adjacent lots formerly or presently owned by the same owner. Alternatives limited to the original parcel on which the project is located, the subdivided parcels, any adjacent parcels, and any other land which can reasonably be obtained within the municipality. Alternatives extend to any sites which can reasonably be obtained within the appropriate region of the state. Negative Determination Note: No further action under the Wetlands Protection Act is required by the applicant. However, if the Department is requested to issue a Superseding Determination of Applicability, work may not proceed on this project unless the Department fails to act on such request within 35 days of the date the request is post- marked for certified mail or hand delivered to the Department. Work may then proceed at the owner's risk only upon notice to the Department and to the Conservation Commission. Requirements for requests for Superseding Determinations are listed at the end of this document. 1. The area described in the Request is not an area subject to protection under the Act or the Buffer Zone. 2. The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent. 3. The work described in the Request is within the Buffer Zone, as defined in the regulations, but will not alter an Area subject to protection under the Act. Therefore, said work does not require the filing of a Notice of Intent, subject to the following conditions (if any). All work shall be in accordance with the Facilities Building and Site Improvement for Northampton Maintenance Deport plans submitted with the determination, with revised sheets 5 -8, all on file at the Office of Planning and Development; and in accordance with the Cons. Commission's wetlands standard conditions at www.NorthamptonMA.gov /OPD /wetlands. 4. The work described in the Request is not within an Area subject to protection under the Act (including the Buffer Zone). Therefore, said work does not require the filing of a Notice of Intent, unless and until said work alters an Area subject to protection under the Act. wpaform2.doc Determination of Applicability rev. 10/6/04 Page3of5 Massachusetts Department of Environmental Protection Bureau of Resource Protection Wetlands WPA Form 2 Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) 5. The area described in the Request is subject to protection under the Act. Since the work described therein meets the requirements for the following exemption, as specified in the Act and the regulations, no Notice of Intent is required: Exempt Activity (site applicable statuatory /regulatory provisions) 6. The area and /or work described in the Request is not subject to review and approval by: Name of Municipality Pursuant to a municipal wetlands ordinance or bylaw. Name Ordinance or Bylaw Citation C. Authorization This Determination is issued to the applicant and delivered as follows: This Determination is valid for three years from the date of issuance (except Determinations for Vegetation Management Plans which are valid for the duration of the Plan). This Determination does not relieve the applicant from complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. This Determination must be signed by a majority of the Conservation Commission. A copy must be sent to the appropriate DEP Regional Office (see http: /www. mass. qov /dep /about /region.findvour.htm) and the property owner (if different from the applicant). by hand delivery on by certified mail, return receipt requested on Date wparormfaoc Determination A SOlicabdrly rev: 10/6/04 Date /if /09 Date Page- 4-of-5- Massachusetts Department of Environmental Protection Bureau of Resource Protection Wetlands WPA Form 2 Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Appeals The applicant, owner, any person aggrieved by this Determination, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate Department of Environmental Protection Regional Office (see http: /www.mass.gov /dep /about /region.findvour.htm) to issue a Superseding Determination of Applicability. The request must be made by certified mail or hand delivery lo the Department, with the appropriate filing fee and Fee Transmittal Form (see Request for Departmental Action Fee Transmittal Form) as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant if he /she is not the appellant. The request shall state clearly and concisely the objections to the Determination which is being appealed. To the extent that the Determination is based on a municipal ordinance or bylaw and not on the Massachusetts Wetlands Protection Act or regulations, the Department of Environmental Protection has no appellate jurisdiction. wpaform2.doc Determination of rev:10 /6/04 Page -o f -5. Planning and Development Wetlands Standard Conditions Hide Admin I Manage Sites 1 Submit Event 1 Submit News 1 Manage Users Home 1 Add Pagel Edit Page Northampton Home Calendar Departments City Services About Northampton i I v IOPD Home t i CoCode /Regulations aiIr*l Proposed lAtv'I Links for Design Guidelines I' Wetlands Standard Conditions Permits Applications t!' Visions /Plans i' ►s Ilv.dConservation Agriculture I± itw Sense of Place ransportation Plans 1. Rail Trails A Zoning wI IMission and Links *imlIContact OPD !tit's _,I tet iimirc L?'<1'v "lKollmorgen Site Plans Elevation Add:I Edit I Published J Edit I Published http://www.northamptonma.gov/opd/wetlands/ Planning and Development Wetlands Standard Conditions In addition to any other conditions, the following conditions shall apply to all wetland permits 1. Prior to the initiation of any work, the applicant /owner shall submit a letter of understanding to the Commission stating that he /she has received, read, understands and shall comply with these Orders. The applicant, and, his or her contractor, foreman and /or construction manager shall sign the letter of understanding. 2. Prior to the initiation of any work, the applicant shall submit to the Commission a sequencing plan for construction, and erosion and sedimentation control installation. 3. Prior to the start of any site work, excavation or construction, a pre- construction conference shall be held on the site, between the contractor conducting the work, the site /project engineer, the applicant, and a member or agent of the Conservation Commission, in order to ensure that the requirements of this Order are understood by all parties. Prior to the pre- construction meeting, all erosion control devices must be installed. 4. All required permits must be obtained from federal, state and municipal agencies and departments prior to the start of any project. 5. A copy of this Order and associated plans shall remain on site during all construction and /or building activities. The project manager and all equipment operators shall be familiar with the approved plans, and shall be informed of their location on the site. This location shall be accessible to all contractors whenever work is occurring on site. 6. All revised plans, referenced within this Order of Conditions, shall be approved by the Conservation Commission and incorporated into the permit by reference and shall be followed during the course of construction. My Profile I Logout Site Preferences Planning and Development Wetlands Standard Conditions http /www.northamptomna.gov /opd /wetlands/ 7. The areas of construction shall remain in a stable condition at the close of each construction day. Erosion control measures shall be inspected at this time, and maintained or reinforced as necessary. All such devices shall be inspected, cleaned or replaced during construction and shall remain in place until such time as stabilization of all areas that may impact resource areas is permanent. These devices shall also be inspected to assure that the maximum control has been provided. Any entrapped silt shall be removed to an area outside the buffer zone and resource areas, and maintained or reinforced as necessary. Erosion controls shall be inspected after every rainfall to assure that maximum control has been provided. 8. An adequate stockpile of erosion control materials shall be on site at all times for emergency or routine replacement and shall include materials to repair or replace silt fences, straw bales, erosion control blankets, riprap, filter berms or other devices planned for use during construction. 9. Soils exposed for periods greater than two months shall be stabilized with erosion control blankets and netting, a covering of straw mulch, or a temporary cover of rye or other grass to prevent erosion and sedimentation. Drainage ditches shall be stabilized and seeded with a native perennial grass mixture. Any stabilization materials such as jute netting shall be firmly anchored to prevent them from being washed from slopes by rain or flooding. Preference should be given to biodegradable materials. 10. All disturbed areas shall be graded, loamed and seeded, or stabilized with erosion control blankets or netting, and a covering of straw mulch prior to November 30, of each year. No disturbed areas or stockpiled materials will be left unprotected or without erosion control after this date. 11. No disposal of soils or other materials shall be allowed within: a 100 -year floodplain; 40 feet of the 100 -year floodplain elevation; any wetland; or any area within 100 -feet of a wetland, unless such areas are specifically approved by the Commission, in accordance with 310 CMR 10.00, and City of Northampton Ordinances Chapter 24 THE FOLLOWING CONDITIONS TO NOT APPLY TO DETERMINATIONS: 12. Ongoing conditions that shall not expire with the issuance of a Certificate of Compliance are as follows: N/A 13. Upon completion of the work covered by this Order, the applicant shall submit an as -built plan, signed and stamped by a registered professional engineer or land surveyor, together with a written request for a Certificate of Compliance. The plan and written request shall specify any ways that the completed project differs from the plans referenced in the Order. The as -built plan shall include, at a minimum, and as applicable to the project: elevations of all pipe inverts and outlets, pipe sizes, materials, and slopes; all other drainage structures; limits of clearing, grading, and fill; all structures, pavement, and contours within 100 feet of wetland boundaries; all alterations within the wetland resource areas; and all dates of fieldwork. 14. The owner of the property described in this Order must advise any potential buyer of the property that any construction or alteration to said property, including brush cutting or clearance, may require approval by the Northampton Conservation Commission. Any instrument conveying any or all of the owners' interest in said property Planning and Development Wetlands Standard Conditions http /www.northailiptonma.gov /opd /wetlands/ or any portion thereof, shall contain language similar to the following:. "This property is subject to the Northampton Wetlands Protection Ordinance and /or Wetlands Protection Act. Any construction or maintenance work performed on this property requires an Order of Conditions, and /or a Determination of Applicability from the Northampton Conservation Commission. ©City of Northampton MA Disclaimer Contact Us Directions Site Map City Hall, 210 Main Street, Northampton, MA 01060 Website design by gravity switch, inc. Important: When filling out forms on the computer, use only the tab key to move your cursor do not use the return key. Massachusetts uepartment of Environmental Protection Bureau of Resource Protection Wetlands Northampton City/Town WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information 1. Applicant: Albert R. Stegemann, P.E. District 2 Highway Director Name 811 North King Street Mailing Address Northampton City/Town (413) 582 -0599 Phone Number 2. Representative (if any): Massachusetts Highway Department, District 2 Office Firm Timothy Meyer, District Environmental Engineer Contact Name 811 North King Street Mailing Address Northampton City/Town (413) 582 -0543 E -Mail Address MA State (413) 582 -0596 Fax Number (if applicable) Timothy.Meyer@mhd.state.ma.us E -Mail Address MA State (413) 582 -0596 Phone Number Fax Number (if applicable) 01060 Zip Code 01060 Zip Code B. Determinations 1. I request the Northampton make the following determination(s). Check any that apply: Conservation Commission a. whether the area depicted on plan(s) and /or map(s) referenced below is an area subject to jurisdiction of the Wetlands Protection Act. b. whether the boundaries of resource area(s) depicted on plan(s) and /or map(s) referenced below are accurately delineated. c. whether the work depicted on plan(s) referenced below is subject to the Wetlands Protection Act. d. whether the area and /or work depicted on plan(s) referenced below is subject to the jurisdiction of any municipal wetlands ordinance or bylaw of: Name of Municipality e. whether the following scope of alternatives is adequate for work in the Riverfront Area as depicted on referenced plan(s). wpaforml.doc Page 1 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Project Description 1. a. Project Location (use maps and plans to identify the location of the area subject to this request): Mount Tom Road (Route 5) Northampton Street Address City/Town Assessors Map /Plat Number Parcel /Lot Number b. Area Description (use additional paper, if necessary): The site is a Massachusetts Highway Maintenance Depot (Facility No. 20) for District 2. It is located on the eastern side of Mount Tom Road (Route 5), directly north of the 1 -91 overpass, in the City of Northampton, Massachusetts. c. Plan and /or Map Reference(s): U.S.G.S. Locus and Environmental Features Maps (2 Sheets) 9/18/2009 Title Date FEMA Flood Insurance Rate Map 4/3/78 Title Date Plans entitled, "Facilities Building and Site Improvements for Northampton 7/23/09 Maintenance Depot" Date Northampton City/Town 2. a. Work Description (use additional paper and /or provide plan(s) of work, if necessary): Replace an existing office facility with a new 600 square foot (30 ft. by 20 ft.) building in the same location. The existing facility will be removed and all existing pipe and utility connections will be disconnected. An existing propane tank will be relocated from the north side of the building site to the west side, and the associated pipes and connections will be removed and relocated. A bituminous pavement parking lot of 4 spaces, approximately 36 ft. by 18 ft., is proposed to be installed on the west side of the new building. The new building's sanitary systems will be connected to an existing sanitary manhole, approximately 75 ft. south of the building site, along which new bituminous pavement will be installed. Haybales and silt fence will be arranged along the eastern property line as soil erosion and sedimentation control during construction. wpaforml .doc Page 2 of 4 Massachusetts uepartment of Environmental Protection Bureau of Resource Protection Wetlands Northampton City/Town WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Project Description (cont.) b. Identify provisions of the Wetlands Protection Act or regulations which may exempt the applicant from having to file a Notice of Intent for all or part of the described work (use additional paper, if necessary). As shown on the attached Environmental Features Map, there are wetlands on either side of the maintenance depot to the east and west. All work in the proposed project is beyond the 100 -foot buffer zone of these wetlands. Also, the site of the proposed building is within the boundaries of the 100 -year floodplain, which classifies the area as Bordering Land Subject to Flooding (BLSF). The new facility is being constructed in the same location as the existing building with a similar footprint. The parking lot will take up approximately 650 square feet, and it is expected that this change will not significantly impact BLSF. The use of haybales will prevent any impacts to any wetland resource areas. 3. a. If this application is a Request for Determination of Scope of Alternatives for work in the Riverfront Area, indicate the one classification below that best describes the project. Single family house on a lot recorded on or before 8 /1/96 Single family house on a lot recorded after 8/1/96 Expansion of an existing structure on a lot recorded after 8/1/96 Project, other than a single family house or public project, where the applicant owned the lot before 8/7/96 New agriculture or aquaculture project Public project where funds were appropriated prior to 8/7/96 Project on a lot shown on an approved, definitive subdivision plan where there is a recorded deed restriction limiting total alteration of the Riverfront Area for the entire subdivision Residential subdivision; institutional, industrial, or commercial project Municipal project District, county, state, or federal government project Project required to evaluate off -site alternatives in more than one municipality in an Environmental Impact Report under MEPA or in an alternatives analysis pursuant to an application for a 404 permit from the U.S. Army Corps of Engineers or 401 Water Quality Certification from the Department of Environmental Protection. b. Provide evidence (e.g., record of date subdivision lot was recorded) supporting the classification above (use additional paper and /or attach appropriate documents, if necessary.) wpaforml.doc Page 3 of 4 Massachusetts uepartment of Environmental Protection Bureau of Resource Protection Wetlands Northampton City/Town WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Request for Determination of Applicability and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I further certify that the property owner, if different from the applicant, and the appropriate DEP Regional Office were sent a complete copy of this Request (including all appropriate documentation) simultaneously with the submittal of this Request to the Conservation Commission. Failure by the applicant to send copies in a timely manner may result in dismissal of the Request for Determination of Applicability. Name and address of the property owner: Commonwealth of Massachusetts, Massachusetts Highway Department c/o District 2 Office Name 811 North King Street Mailing Address Northampton City/Town MA 01060 State Signatures: I also understand that notification of this Request will be placed in a local newspaper at my expense in accordance with Section 10.05(3)(b)(1) of the Wetlands Protection Act regulations. ©9�2 I/o Zip Code of A Signat e pp licant Date gna re of Representative (if any) g /`f'/oq Date wpaforml .doc Page 4 of 4 STATE FED. AID PROJ. NO. SHEET N0. TOTA SHEETS MASS 5 8 PROJECT FILE NO. 605801 SOIL EROSION AND SEDIMENT CONTROL NARRATIVE: 1. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE INSTALLED PRIOR TO ANY SITE DISTURBANCE AND DEVELOPMENT WILL PROCEED ACCORDING TO SPECIFIC CONSTRUCTION PHASING AS INDICATED ON THE CONTRACT DOCUMENTS. THE OBJECTIVE I5 TO MINIMIZE THE AMOUNT OF SEDIMENT -LADEN RUNOFF THROUGH IMPLEMENTATION OF A VARIETY OF CONVENTIONAL SOIL EROSION AND SEDIMENT CONTROL PROCEDURES AND APPLICATION PRACTICES RECOMMENDED BY THE LATEST REVISION OF THE LOCAL AND STATE GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL. PROCEDURES AND APPLICATION TECHNIQUES SHALL CONFORM TO THE ABOVE MENTIONED GUIDELINES AND THE DETAILS SHOWN ON THE CONTRACT DOCUMENTS. 2. THE CONTRACTOR SHALL NAME ONE INDIVIDUAL AS A EROSION CONTROL SUPERVISOR WHOSE RESPONSIBILITY WILL BE THE MAINTENANCE AND REPAIR OF ALL ON -SITE EROSION CONTROL MEASURES. THE EROSION CONTROL SUPERVISOR WILL KEEP A DAILY LOG OF THEIR ACTIVITIES AND COMPLETE A DAILY CHECKLIST (ESTABLISHED BY THE CONTRACTOR). THE EROSION CONTROL SUPERVISOR SHALL ALSO MAINTAIN A SCHEDULE OF WEEKLY CONSTRUCTION ACTIVITIES. THE CHECKLIST AND LOG SHALL BE MADE AVAILABLE TO INSPECTORS UPON REQUEST. 3. REPAIRS TO SEDIMENTATION AND EROSION CONTROL DEVICES WILL BE PERFORMED AS DIRECTED BY THE EROSION CONTROL SUPERVISOR. REPAIRS SHALL BE AS OUTLINED IN THE LATEST REVISION. OF LOCAL AND STATE GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL. 4. REPLACEMENT MATERIALS FOR THE EROSION CONTROL DEVICES MUST BE READILY AVAILABLE FOR REPAIRS. 5. CLEANING OF SEDIMENTATION AND EROSION CONTROL DEVICES WILL BE PERFORMED AS DIRECTED BY THE EROSION CONTROL SUPERVISOR. 6. PLACEMENT OF TEMPORARY SEDIMENTATION AND EROSION CONTROL DEVICES THAT ARE NOT SHOWN ON PLANS, WHICH• ARE REQUIRED DUE TO THE CONTRACTORS OPERATIONS, WILL BE PLACED AT THE DIRECTION OF THE EROSION CONTROL SUPERVISOR. 7. EARTHWORK CONSTRUCTION ACTIVITIES WILL BE SCHEDULED FOR PERIODS WHEN SOIL SATURATION IS LOW AND SOIL LOSS HAZARD IS AT A MINIMUM RISK. 8. SUSPEND EARTHWORK ACTIVITIES FOR MAJOR STORM EVENTS AND IMPLEMENT ADDITIONAL SEDIMENTATION AND EROSION CONTROL MEASURES AS NECESSARY. 9. STAGE CONSTRUCTION ACTIVITIES SUCH THAT ONLY THOSE AREAS OF SITE SCHEDULED FOR IMMEDIATE DEVELOPMENT ARE DISTURBED AND ACTIVITIES SCHEDULED FOR LATER DEVELOPMENT ARE NOT STARTED PREMATURELY. 10. THERE WILL BE NO LARGE CUTS OR FILLS LEFT AS "RAW' AREAS. SUB -GRADE WILL BE ACHIEVED AS SOON AS POSSIBLE AND AN ESTABUSHED PROCEDURE OF TEMPORARY SEEDING AND /OR COVER WITH EROSION PROTECTION (EROSION CONTROL BLANKETS FOR SLOPES AND MULCH OR EROSION CONTROL BLANKETS FOR FLAT AREA) WILL BE FOLLOWED TO INSURE MINIMAL SOIL LOSS. 11. ALL SURFACES DESIGNATED FOR PAVING WILL HAVE THE SUB -BASE, BASE AND BINDER INSTALLED AS SOON AS POSSIBLE. WHERE FEASIBLE THE STORM DRAINAGE SYSTEM WILL BE INSTALLED TO PROVIDE CONTROL OF SURFACE RUNOFF. 12. DUST CONTROL, AND OFF -SITE STREET DEBRIS CAUSED BY THE CONTRACTORS EARTHWORK OPERATIONS WILL BE PREVENTED, ALLAYED, OR CLEANED UP. 13. CONTROL MEASURES AS INDICATED ON THE CONTRACT DOCUMENTS SHALL BE SUBJECT TO ADDITION AND /OR MODIFICATION AS REQUIRED TO MEET ACTUAL SITE CONDITIONS. 14. CONTRACTOR SHALL PROTECT ANY EXISTING AND NEW INLET STRUCTURES, DRAINAGE SWALES, PROPERTY, ETC. WHICH MAY INTERCEPT RUN -OFF DUE TO CONSTRUCTION ACTIVITIES BOTH INSIDE AND OUTSIDE OF WORK LIMITS. M 0 1- 0 CAP ANb. REMOVE EXISTING STION OF WATER SERVICE MAIN (TYP) J CAP AND ABANDON EXISTING SECTION OF }'WATER !SE MAIN (TYP) Mn SILT FENCE (TYPICAL) -J 0 m J O 4( REMO EXISTING SITE PROPANE TANK AND REMOVE ASSOCIATED SERVICE \AND CONNECTIONS RELOCATE EXISTING SITE TRAILER AND DISCONNECT ASSOCIATED PIPED AND UTILITY CONNECTIONS. STORE TRAILER ON -SITE PER DIRECTION OF IENGINEER. C MP OW 2�Id1S N. REMOVE UTILITY POLE, $QLLARD Y+ND ASSOCIATFjb UTILITY SERV( E CONNECTIONS REMOVE EXISTING(:. SITE LIGHTING AND STORE ON SITE REMOVE .XISTING PAVEMEN TO PAVEMENT EDGE AN SAW -CUT LIMITS (TYP) m LJJF 3Ad „9 0 X N 0 0 O 3 H 00 O L DEMOLISH EXIST! AS,$QCIATED CON REMOVE DEMOLIT1 SHO L OBTAIN GUIDELI ES RELA CL 0 REMOVE AND RE CATE ELECTRIC METER AND ASSCCIATED SERVICE CONNECTIONS TO NEW SERVICE PANEL. CONTRAC OR SHALL PHASE WORK WITH FINAL OCCUPANCY WITH PROPOSED BUILDING. OW LLI O Q U 0_ O N. m N (n V LL: II O O o U 0 Li 0 J dONV') a svo 8 I BJ l o 0 123— 122— 127 TEPS. SHED pI N DEBRIS. CO T W N \READ AB E €jl TF ED TO`EMO ITIO�Iz Off t i 1 OW 0 #37— 0 0 O GRAPHIC SCALE 10 25 (HOR. SCALE IN FEET) 1 INCH 10 FEET o 0 o O Z 0 0 0 0 0 NORTHAMPTON ROUTE 5 MT TOM DEPOT EXISTING CONDITIONS /DEMOLITION PLAN CIVIL GENERAL NOTES: 1. PRIOR TO COMMENCING CONSTRUCTION NOTIFY "CALL BEFORE YOU DIG" FOR FIELD LOCATION OF AND MARKING OF SUBSURFACE UTILITIES. 2. ALL CONSTRUCTION METHODS SHALL CONFORM TO THE FOLLOWING: A. STATE OF MASSACHUSETTS HIGHWAY DEPARTMENT MATERIALS AND INSTALLATION SPECIFICATION B. SPECIFIC TOWN OF NORTHAMPTON CONSERVATION REQUIREMENTS. C. STATE OF MASSACHUSETTS STORM WATER BMP REQUIREMENTS. 3. ESTABLISH AND MAINTAIN AT LEAST TWO (2) BENCHMARKS ON SITE FOR VERTICAL AND HORIZONTAL REFERENCE. 4. SAFETY ISSUES AND HOURS OF OPERATION ARE THE RESPONSIBILITY OF THE CONTRACTOR AND ARE TO BE COORDINATED WITH THE DISTRICT. 5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEVELOP THE CONSTRUCTION' AS- BULITS PLANS SHALL SHOW LOCATION AND ELEVATION OF CONSTRUCTED STRUCTURES, PIPING AND CONDUITS. THE CONTRACTOR IS TO NOTIFY THE ENGINEER OF ANY CONFLICTS OR CONCERNS. EXISTING UTILITIES TO REMAIN ARE TO PROTECTED DURING CONSTRUCTION. 6. ALL FILL PLACED WITHIN THE ANY JURSIDICTIONAL AREA SHALL CONSIST OF CLEAN FILL AND SHALL MEET THE REQUIREMENTS OF MASSACHUSETTS HIGHWAY DEPARTMENT, STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES, ITEM 150- ORDINARY BORROW (SECTION M 1.01.0) 7. THE CONTRACTOR SHALL COMPLY WITH ALL ITEMS OF THE LOCAL CONSERVATION COMMISSIONS "ORDER OF CONDITIONS." DEMOLITION GENERAL NOTES: 1. ALL REQUIRED UTILITY DISCONNECTS AND /OR ABANDONMENT TO BE COORDINATED WITH RESPECTIVE UTILITY COMPANIES AND OWNER PRIOR TO CONSTRUCTION PHASING. REFER TO NOTE 7 OF THE CIVIL GENERAL NOTES. ON DRAWING C 0.0. 2. CONTRACTOR TO PROTECT AND MAINTAIN ALL UTILITIES TO REMAIN. 3. SEDIMENTATION AND EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY SITE DEMOUTION WORK. 4. ALL EXISTING UTILITIES SIGNS, PAVEMENT, SITE WALLS ETC. SHOWN IN BOLD TO BE REMOVED WITHIN THE CONTRACT LIMIT LINE. REFER TO THE CIVIL GENERAL NOTES FOR MORE INFORMATION. 5. SEDIMENTATION AND SOIL EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY SITE DEMOLITION WORK. 6. EXISTING BITUMINOUS PAVEMENT TO BE SAW -CUT AT ALL LOCATIONS WHERE EXISTING BITUMINOUS WILL MATCH NEW BITUMINOUS PAVEMENT. EROSION AND SEDIMENTATION CONTROL CONSTRUCTION STAGES: STAGE I: A. IMMEDIATELY AFTER MOBILIZATION, BUT PRIOR TO INITIATING ANY SOIL DISTURBING ACTIVITIES THE CONTRACTOR SHALL MAKE A GENERAL SITE ASSESSMENT TO ESTABLISH CONSTRUCTION LIMITS. DESIGNATE CONSTRUCTION ENTRANCES AND INSTALL ALL SPECIFIED SOIL EROSION AND SEDIMENT CONTROL MEASURES. .$TAGF II: A. CLEAR SITE AS REQUIRED TO ACCOMODATE THE CONSTRUCTION. LEGALLY CUT AND CHIP BRUSH. REMOVE STUMPS FROM THE SITE TO BE DISPOSED OF IN A PROPER MANNER. THE OWNER'S PERMISSION IS REQUIRED BEFORE CLEARING BEYOND THE TREE LINE OR WOODED AREA DEFINED ON THE PLANS. B. ADDRESS ALL STOCKPILE MATERIAL AS INDICATED IN THE EROSION CONTROL SPECIFICATIONS. FARE III: C. SURVEY, STAKE AND PLACE NEW IMPROVEMENTS IDENTIFIED WITHIN THE WORK AREA AND AS SHOWN ON THE CONTRACT DOCUMENTS. D. MAINTAIN, CLEAN AND REPAIR EROSION CONTROL AND SEDIMENT PROTECTION MEASURES AS RECOMMENDED BY THE LATEST REVISION OF THE LOCAL AND STATE GUIDELINES FOR SOIL, EROSION AND SEDIMENT CONTROL. STAGE IV: E. RE- SPREAD TOPSOIL TO DESIGNATED AREAS. F. INSTALL NEW PLANTING, BEGIN THE SITE PERIMETER PLANT SITE PLANTING IN BUFFER ZONES TO ACHIEVE EARLY STABILIZATION AND THEN PLANT SITE INTERIOR AREAS AND FINALLY PLACE SEED. G. CLEAN UP SITE BUT LEAVE REMAINING EROSION CONTROL AND SEDIMENT PROTECTION MEASURES IN PLACE UNTIL SITE IS 50 STABILIZED AS DETERMINED BY THE ENGINEER. STATE FEO. AID PROJ. N0. SHEET N0. TOTAL SHEETS MASS 6 8 PROJECT FILE N0. 605801 FC 4 FC 3 1 "W POLY 3fIM 38bV9 M d1D ,9 CONNECT NEW GAS SERVICE TO RELOCATED PROPANE TANK. CONTRACTOR TO OBTAIN PERMITS WITH LOCAL UTILITY COMPANY SITE LIGHTING FIXTURE POLE AND BASE PAN NO 7 BITUMINOUS MHD TYPE -A CURB (TYPICAL) CONNECT WATER SERVICE TO BLDG SYSTEMS. SEE MEP DRAWINGS GAS FOR MORE INFORMATION G J 3 SPACES AT 9'x18' PROPOSED BUILDING F.F. ELEVATION 123.00 LC LIJ 0 CC 0 0 a 01 U 07 a 01 U 0 a 0 W 0 w a 9O 0 uJ LO RECONNECT NEW ELECTRICAL AND TELEPHONE SERVICE TO EXISTING. CONTRACTOR TO OBTAIN SERVICE PERMITS WITH LOCAL UTILITY COMPANIES N 2939960.4366 E 352266.2694 (SET) CONNECT NEW WATER SERVICE TO EXISTING METER PIT. CONTRACTOR TO OBTAIN CONNECTION PERMITS. TAPER CURB PROFILE TO EXISTING (TYPICAL) CONNECT DATA AND POWER CABLES FOR FUEL. MONITORING SYSTEMS. SEE ELECTRICAL AND MECHANICAL PLANS FOR MORE INFORMATION 0) CONNECT POWER AND TELE410 SERVICES TO TRAILER UTILIITTYY SYSTEMS. RECONNECT TEMP ELECTRI TELEPHONE SERVICE TO E CONTRACTOR TO OBTAIN ITY PERMITS WITH LOCAL UTI ITY COMP7tNl€S r N RELOCATE EXISTING SITE TRAILER AND CONNECT ASSOCIATED UTILITY CONNECTIONS. CONNECT TEMP SANF SERVI TANK TO TRAILER SA I RRYY CONNECTION. CONTRAGTp TQ OBTAIN SANITARY PUMPING SERVICE. N81'39'23 "E 44.99' CONNECT NEW SANITARY SERVICE TO BUILDING MAIN. SEE BUILDING MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION SANITARY CLEANOUT DAd „9 BITUMINOUS PAVEMENT (TYPICAL) TIE NEW PAVEMENT INTO EXISTING (TYPICAL) CONNECT NEW SANITARY TO EXISTING SMH. PROVIDE MINIMUM 2% CH AND MATCH EXIST INS �VIF);REPAIR AN CLEAN ING MH 7( UIRED N N 2 11 0_ (n a Z TEL FC O 9 (/7 0 a a •S O a J (1) 0 03 CONNECT GAS SERVICES TO BLDG SYSTEMS. SEE MEP DRAWINGS FOR MORE INFORMATION CONNECT WATER SERVICE AND NDPW METER TO BLDG SYSTEMS. SEE MEP DRAWINGS FOR MORE INFORMATION SITE BOLLARDS (TYP OF 2) 6 "(T) CONCRETE EOUIP PAD CONNECT POWER SERVVJJCC TO BLD SNF�E'ME DRAWN INFIORMA ON COaad EMERGENCY POWER SERVICES TO NEW ENERATOR. SEE MEP DRAWING F ROMORE INFORMATION O 01 6" CONC EQUIP PAD AND. H) FENCE ENCLOSURE 3'(W) GATE TAPER CURB PROFILE TO EXIS11NG (TYPICAL) EP FC FC 1" W POLY CONNECT TEL DATA, POWE' AND EMERGENCY POWER CABLES TO EXISTING PANEL AND FUEL MONITORING SEE ELECTRICAL AND MECHANICAL PLANS FOR MORE INEQ RMATION. CONNECT WATER yERVCE AND NDPW METER TO BLDG SVST MS. N 2939966.9644 E 352310.7790 (HOLD) I ONV1SI SVO �(eoo)� o AdONVO OV3Ha3A0 O 0) O W o 0 Z O 0 9 0 a f- m a 0 W 0 0 '0 0 1 Z 0 0 0 0 0 SIGN SCHEDULE: Q ACCESSIBLE PARKING SIGN 10 NORTHAMPTON ROUTE 5 MT TOM DEPOT SITE LAYOUT AND UTILITY PLAN SITE MATERIALS GENERAL NOTES: 1. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONAL LAYOUT INFORMATION AND NOTIFY ANY DISCREPANCIES TO THE ENGINEER FOR REVIEW AND CLARIFICATION PRIOR TO THE INSTALLATION OF ANY SITE IMPROVEMENTS. 2. THERE SHALL BE A SMOOTH TRANSITION WHERE NEW PAVEMENTS TIE INTO EXISTING PAVEMENTS WALKS OR CURBS. CURBS: MATCH EXIS11NG WIDTH AND HEIGHT. 3. PROVIDE A FULL DEPTH 3" PRE MOLDED JOINT FILLER AND SEALANT WHEREVER CONCRETE ABUTS FIXED OBJECTS (TYP). SITE UTILITY GENERAL NOTES: 1. FOR UTILITY TRENCH DETAILS, REFER TO 8 /C3.0 2. EXIS11NG MANHOLE, FRAMES AND COVERS ARE TO BE RESET AS REQUIRED TO MATCH NEW GRADES. 3. ALL WATER MAIN INSTALLATIONS ARE TO BE APPROVED BY THE FIRE MARSHALL PRIOR TO TRENCH BACKFILL 4. PROVIDE NYLON PULL ROPES IN ALL CONDUITS. 5. REFER TO DETAIL 4/C3.0 FOR CONDUIT DUCTBANK ARRANGEMENTS CONDUIT SCHEDULE: 0 1 -3" PVC CONDUIT CONCRETE ENCASED Q2 1 -3" PVC CONDUIT DIRECT BURIED Q 1 -2" PVC CONDUIT CONCRETE ENCASED 1 -2" PVC CONDUIT DIRECT BURIED 1 -2 "PVC DIRECT BURIED CONDUIT WITH 2 #8 1 #10 GND BITUMINOUS PAVEMENT TYPE: PAVEMENT TYPE "A" SEE DETAIL 5/C3.0 PAVEMENT TYPE "B" MHD ITEM NO. 701 GRAPHIC SCALE 25 50 (HOR. SCALE IN FEET) 1 INCH 10 FEET STATE FED. AIM PROJ. N0. SHEET N0. T OTAL S HEETS MASS 7 8 PROJECT FILE N0. 605801 41 122.24 122.54 OSED I1NG F.F. ELEPROPVATION BU DI 1123.00 121.40 121.40 nla 123/74 0 321IM 38aV8 M 310 ,9 N J 122 (J 41 0 (n 122.26 OAd „9 0 11 g 123 -122 121 LJ CD Q U H O CD N m (n zLJ II O 0 U Li O i ONV1SI SVO 8 I(0 0 AdONVO OV3Hb3A0 �O 0 0 01 W N O O 0 0 m .o o z 0 3 0 0 0 0 10 NORTHAMPTON ROUTE 5 MT TOM DEPOT SITE GRADING AND DRAINAGE PLAN GRADING AND DRAINAGE GENERAL NOTES: 1. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, AS SHOWN ON THE DRAWINGS WITH ACTUAL FIELD CONDITIONS AND NOTIFY THE RESIDENT ENGINEER IN WRITING OF ANY DISCREPANCIES. COMMENCEMENT OF WORK IN AREA SIGNIFIES ACCEPTANCE OF EXISTING CONDITIONS SHOWN ON THESE DRAWINGS AS BEING SUBSTANTIALLY CORRECT. 2. PROPOSED GRADES INDICATE INTENT. THE CONTRACTOR SHALL VERIFY ELEVATIONS AND MAKE FIELD ADJUSTMENTS AS AUTHORIZED BY THE DISTRICT, TO MEET FIELD CONDITIONS AND TO PROVIDE POSITIVE SURFACE DRAINAGE TOWARDS NEW AND EXISTING DRAINAGE INLETS. ADJUST EXISTING DRAINAGE STRUCTURES TOP ELEVATIONS AS REQUIRED. 3. SEE DETAIL 6/C3.0 FOR TYPICAL TRENCH DETAIL. 4. ALL EXTERIOR DOOR PADS TO HAVE A MAXIMUM TWO (2) PERCENT CROSS SLOPE. 5. CONTRACTOR TO SMOOTHLY BLEND ALL PROPOSED GRADES TO EXISTING GRADES. GRAPHIC SCALE 25 (HOR. SCALE IN FEET) 1 INCH 10 FEET 50