Loading...
32A-140 (12) hAQ - 324 - NO Final Construction Control Document u To be submitted at completion of construction by a R d Registered Design Professional for work per the 8th edition of the ve Massachusetts State Building Code, 780 CMR, Section 107 Project Title: CPCS Offices Date: 12/7/2018 Permit No. Property Address: 109 Main St,Northampton,MA Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Minor renovations to a 2,800 SF office suite including modifications to existing interior partitions, some new interior doors, a new break room,new finishes,new lighting,modifications to HVAC systems for new layouts and a new exterior window in the conference room. I, Aelan B.Tierney, MA Registration Number: 20441 Expiration date: 08/31/2019 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: X Architectural Structural Mechanical Fire Protection Electrical Other: for the above named project. I certify that I,or my designee,have performed the necessary professional services, in accordance with the Professional standard of Care,and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. Such review shall not diminish or relieve the contractor of its submittal and other responsibilities. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. The contractor is responsible for the performance of the work in accordance with the contract documents and shall be exclusively responsible for its construction means,methods, sequences and procedures,and for construction safety. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. CVs 5�aF-D AR�'yi Enter in the space to the right a"wet"or �,�� 8. electronic signature and seal: ¢ er No.20411�A o AWERST 'tWe MA Phone number: 413-259-1630 x111 Email: atierney@kuhnriddle.com `9trif OnAk Building Official Use Only Building Official Name: Permit No.: Date: J� —) :1